ML180UHE Schematic Wiring Diagram and Sequence of Operation

1

5

8

6

1

9

3

10

5

2 7 4

1 − Line voltage is applied to L1 and N. the T1 low voltage transformer is energized, and line voltage is applied to B3 indoor blower.

2 − S47 rollout switch(es) must be closed in order for 24V from transformer to be output on integrated control "R" to power thermostat.

3 − When there is a call for heat, W1 of the thermostat energizes W of the furnace control with 24VAC.

4 − A92 integrated control runs a self−check. S10 primary limit and S21 secondary limit contacts are found to be closed. Call for heat can continue. 5 − A92 integrated control energizes B6 combustion air inducer. S18 combustion air pressure switch closes . Once S18 closes, a 15−second

pre−purge follows.

6 − A92 integrated control energizes R33 ignitor. A 20−second warm−up period begins.

7 − GV1 gas valve opens for a 4−second trial for ignition

8 − Flame is sensed, gas valve remains open for the heat call.

9 − After 30−second delay (from flame sensed), A92 integrated control applies 24vVAC to Heat speed of B3 indoor blower.

10 − When heat demand is satisfied, W1 of the indoor thermostat de−energizes W of A92ignition control which de−energizes GV1 gas valve. B6 combustion air inducer continues a 5−second post−purge period, and B3 indoor blower completes a selected OFF time delay.

FIGURE 32

Page 27

Image 27
Contents Table of Contents Installation Instructions ML180UHETOP View Unit Dimensions − inches mmGas Valve Parts ArrangementMake−Up Box Heat Exchanger Combustion Air Inducer Burner BoxSafety Information ML180UHE Gas FurnaceShipping and Packing List General Use of Furnace as Construction HeaterCombustion, Dilution & Ventilation Air Equipment in Confined Space ALL AIR from Inside Equipment in Confined Space Setting Equipment Return Air Typical Horizontal Application Horizontal Application Installation Clearances Top LeftRight End BottomDuct System FiltersLeft Side Vent Discharge VentingUpflow Position Top Vent DischargeSide Vent Discharge − no modifications necessary Horizontal Left Position Horizontal Right PositionHorizontal Left Position Side Vent DischargeVent Connection Upflow and Horizontal Position Common Venting Using Metal−Lined Masonry Chimney −1/2 18 − The common vent diameter must always be at least as Cated or common venting system, you must inspectFeet FAN + FAN FAN + NAT 130 Carbon Monoxide Poisoning Hazard Gas supply piping should not allow more than 0.5W.C. drop Ers or straps. Install a drip leg in vertical pipe runs to− In some localities, codes may require the installation Gas Piping Horizontal Application Left−Side Air Discharge Right−Side Air Discharge Interior MAKE−UP BOX Installation ElectricalElectrostatic Discharge ESD Thermostat Designations ML180UHE Schematic Wiring Diagram and Sequence of Operation Integrated Control Typical ML180UHE Field Wiring DiagramUnit Start−Up For Your Safety Read Before LightingHigh Altitude Gas Pressure AdjustmentGAS Meter Clocking Chart Proper CombustionManifold Pressure Settings at all Altitudes Other Unit AdjustmentsNo Jumper Heat FAN-OFF Time in Seconds1345 1380995 975 115 945230 Single Side Return Air − Air volumes in bold require fieldOrder to maintain proper air velocity 640 1940 420 1750 310Electrical SHOCK, Fire Or Explosion Hazard Service−045 and −070 units ML180UHE BURNER, Combustion AIR Inducer AssemblyHeat Exchanger Removal −090, −110 −135 unitsRepair Parts List Planned ServiceRED LED Integrated Control Diagnostic CodesHeating Sequence of Operation Normal Heating Mode Abnormal Heating ModeHeating Sequence Cooling Sequence of Operation Normal Cooling Mode Abnormal Cooling ModeContinuous FAN Sequence of Operation Start−Up & Performance Check List Drain Line Cooling ModeTemperature Rise Unit Operation