Lenox ML180UHE Unit Operation, Cooling Mode, Temperature Rise, Drain Line, Thermostat

Page 44

 

 

 

 

UNIT OPERATION

 

 

 

 

 

(typical)

 

 

Combustion CO2

 

 

 

 

2

 

 

SUPPLY

 

 

 

 

 

 

 

 

 

 

AIR

 

Gas Manifold Pressure

7

Thermostat

 

Temperatures

 

 

 

 

 

 

 

6

 

 

 

 

 

 

1

 

 

upflow furnace shown

 

 

 

 

 

4

 

 

 

 

 

Filter

Blower Motor Amps

 

 

 

 

 

 

 

 

 

Duct Static

 

3

 

 

 

 

 

 

 

 

RETURN

5

 

 

 

 

AIR

 

 

 

 

 

 

HEATING MODE

 

COOLING MODE

 

 

 

1

GAS MANIFOLD PRESSURE .C._____

3

INDOOR BLOWER AMPS______

 

 

 

 

4

TEMPERATURE DROP

2 COMBUSTION SAMPLE CO2%______CO PPM_______

Return Duct Temperature _________

 

 

 

 

 

3 INDOOR BLOWER AMPS______

 

Supply Duct Temperature _ _______

 

Temperature Drop = _________

 

 

 

 

 

4

TEMPERATURE RISE

 

5

TOTAL EXTERNAL STATIC (dry coil)

 

Supply Duct Temperature ________

 

Supply External Static _______

 

 

 

 

Return Duct Temperature _ _____

 

Return External Static + ______

 

Temperature Rise = ________

 

Total External Static = _______

 

 

 

5 TOTAL EXTERNAL STATIC (dry coil)

6

DRAIN LINE

 

 

 

Supply External Static _______

 

Leak Free

 

 

 

 

Return External Static + ______

 

 

 

Total External Static = _______

7

THERMOSTAT

 

 

 

 

 

 

 

 

Adjusted and Programmed

 

 

 

 

 

Operation Explained to Owner

 

Contractor’s: Name_________________________Telephone_____________Checklist Completed____________________

 

Job Address_____−________________________________Technician’s Name___________________________________

Page 44

Image 44
Contents Installation Instructions ML180UHE Table of ContentsUnit Dimensions − inches mm TOP ViewParts Arrangement Make−Up Box Heat Exchanger Combustion Air InducerBurner Box Gas ValveShipping and Packing List Safety InformationML180UHE Gas Furnace Use of Furnace as Construction Heater GeneralCombustion, Dilution & Ventilation Air Equipment in Confined Space ALL AIR from Inside Equipment in Confined Space Setting Equipment Return Air Horizontal Application Installation Clearances Top Left RightEnd Bottom Typical Horizontal ApplicationFilters Duct SystemVenting Upflow PositionTop Vent Discharge Left Side Vent DischargeHorizontal Left Position Horizontal Right Position Horizontal Left PositionSide Vent Discharge Side Vent Discharge − no modifications necessaryVent Connection Upflow and Horizontal Position Common Venting Using Metal−Lined Masonry Chimney −1/2 Cated or common venting system, you must inspect 18 − The common vent diameter must always be at least asFeet FAN + FAN FAN + NAT 130 Carbon Monoxide Poisoning Hazard Ers or straps. Install a drip leg in vertical pipe runs to − In some localities, codes may require the installationGas Piping Gas supply piping should not allow more than 0.5W.C. dropRight−Side Air Discharge Horizontal ApplicationLeft−Side Air Discharge Electrostatic Discharge ESD Interior MAKE−UP BOX InstallationElectrical Thermostat Designations ML180UHE Schematic Wiring Diagram and Sequence of Operation Typical ML180UHE Field Wiring Diagram Integrated ControlFor Your Safety Read Before Lighting Unit Start−UpGas Pressure Adjustment GAS Meter Clocking ChartProper Combustion High AltitudeOther Unit Adjustments Manifold Pressure Settings at all AltitudesHeat FAN-OFF Time in Seconds No Jumper1380 995975 115 945 1345Single Side Return Air − Air volumes in bold require field Order to maintain proper air velocity640 1940 420 1750 310 230Service Electrical SHOCK, Fire Or Explosion HazardML180UHE BURNER, Combustion AIR Inducer Assembly Heat Exchanger Removal−090, −110 −135 units −045 and −070 unitsPlanned Service Repair Parts ListIntegrated Control Diagnostic Codes RED LEDNormal Heating Mode Abnormal Heating Mode Heating Sequence of OperationHeating Sequence Normal Cooling Mode Abnormal Cooling Mode Cooling Sequence of OperationContinuous FAN Sequence of Operation Start−Up & Performance Check List Cooling Mode Temperature RiseUnit Operation Drain Line