Desa BDV34NA, BDV34PA PRE-INSTALLATION Preparation General Venting, Location of Vent Termination

Page 5

OWNER’S MANUAL

PRE-INSTALLATION PREPARATION

Continued

GENERAL VENTING

These models are approved for use with Simpson Dura-Vent 6 5/8" direct-vent pipe components and terminations as well as both flex and rigid Vanguard vent components.

Your fireplace is approved to be vented either through the side wall, or vertically using the following guidelines:

13"

9 1/4"

41"

29"

12 5/8"

34 3/8"

35 1/16"

58"

Figure 6 - Framing Clearances for Corner Installation

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

 

 

2

Note: There must be

 

 

 

 

 

 

3

a minimum clear-

 

 

 

 

 

 

A

 

 

 

ance of 18" above

 

 

 

 

 

 

 

 

 

4

top of louver

 

 

 

 

 

 

 

 

 

 

 

 

 

opening when

 

B

 

 

5

installing a television

 

 

 

 

 

 

 

 

 

 

or entertainment

 

 

 

 

C

6

center above the

 

 

 

 

 

 

 

 

 

 

 

D

 

fireplace.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E

7

 

 

 

 

 

 

 

 

 

 

F

G

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top of Louver Opening

 

 

 

 

 

 

 

 

 

 

Ref.

 

Mantel Depth

 

Ref.

 

Mantel from Top

 

 

 

 

 

 

 

 

 

 

of Louver Opening

 

 

1

 

14" (356mm)

 

A

 

16" (406mm)

 

 

 

 

 

 

 

 

 

 

 

2

 

12" (305mm)

 

B

 

14" (356mm)

 

 

3

 

10" (254mm)

 

C

 

12" (305mm)

 

 

 

 

 

 

 

 

 

 

 

4

 

8" (203mm)

 

D

 

10" (254mm)

 

 

 

 

 

 

 

 

 

 

 

5

 

6" (152mm)

 

E

 

8" (203mm)

 

 

 

 

 

 

 

 

 

 

 

6

 

4" (101mm)

 

F

 

6" (152mm)

 

 

 

 

 

 

 

 

 

 

 

7

 

2" (51mm)

 

G

 

4" (101mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

Figure 7 - Clearances for Combustible Mantels

Nailing Tabs

Wall

Only use Vanguard or Simpson Dura- Vent GS venting components or kits spe- cifically approved for this fireplace.

Minimum clearance between vent pipes and combustible materials is 1" (25 mm), except where stated otherwise.

Combustible material may be flush with the top front of fireplace with a maxi- mum thickness of 3/4".

Do not recess venting terminals into a wall or siding.

Install horizontal venting with a 1/4" rise for every 12" of run toward the termina- tion.

You may paint the vent terminal with 450ºF (232ºC) heat-resistant paint to co- ordinate with the exterior finish.

There must not be any obstruction such

as bushes, garden sheds, fences, decks, or utility buildings within 24" from the front of the termination cap.

Do not locate termination cap where ex- cessive snow or ice build up may occur. Be sure to clear vent termination area af- ter snow falls to prevent accidental block- age of venting system. When using snow blowers, do not direct snow towards vent termination area.

LOCATION OF VENT

TERMINATION

When locating vent termination, it is impor- tant to observe the minimum clearances shown in Figure 8, page 6. You will avoid extra framing by positioning your fireplace against an already existing framing mem- ber. The sides of the fireplace may be posi- tioned directly against combustible walls.

*Check with local codes or with the current CAN/CGA B149 [.1 or .2] Installation Codes for Canada or the USA Installations follow the current National Fuel Gas Code, ANS Z223.1, also known as NFPA 54.

Continued

105980

5

Image 5
Contents Natural GAS Model BDV34NA PROPANE/LP GAS Model BDV34PA For Your SafetyFor Your Safety What to do if YOU Smell GAS BDV34NA and BDV34PA Safety InformationProduct Identification Product FeaturesGlossary Terms Local CodesLocation and Space Requirements PRE-INSTALLATION PreparationClearances Framing and FinishingLocation of Vent Termination PRE-INSTALLATION Preparation General VentingGeneral Venting Installation Precautions Venting InstallationInstallation Planning Installing Vent System in a ChaseSnorkel Termination Installation for Horizontal TerminationVent Pipe Connections Horizontal Venting Horizontal Termination ConfigurationsVenting with Two 90 Elbows Cathedral Ceiling Installation Installation for Vertical TerminationFlat Ceiling Installation Venting with One 90 Elbow Vertical Termination ConfigurationsVertical Venting Parts Lists for Venting Kits and Components High Altitude InstallationVanguard Rigid Venting Vanguard Flexible VentingInstalling Optional Blower Accessory Fireplace InstallationInstalling GA3700/DA3610T Blowers Check GAS TypeSide View Installation Items Needed Installing GAS Piping to Fireplace LocationChecking GAS Connections Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Pressure Testing Fireplace Gas Connections Installing Optional Wall Mount Switch GWMS2REMOVING/REPLACING Glass Door Installing Remote ReceiverInstalling Left Side Brick Panel Installing Optional Brick Liner D8037AInstalling Log No Installing LOGS, Lava Rock and Glowing EmbersManual Lighting Procedure For Your Safety Read Before LightingOperating Fireplace Lighting InstructionsPilot Assembly Operating Optional Blower AccessoryInspecting Burners Optional Remote OperationCleaning and Maintenance Observed Problem Possible Cause TroubleshootingObserved Problem Possible Cause Remedy Gas leak. See Warning statement Wiring Diagram Replacement PartsTechnical Service Service HintsBDV34NA BDV34PA SpecificationsAccessories Duplex Outlet KIT Receiver and HAND-HELD Remote Control KIT Ghrc SeriesManual Blower KIT GA3700 Brass Louver KITBDV34NA7 BDV34PA Illustrated PARTS37 BreakdownDIRECT-VENT Fireplace BDV34NA BDV34PA Parts ListWarranty Information