Enviro C-10794 owner manual Twist-lock the vent cap

Page 20

Initial Installation

QUALIFIED INSTALLERS ONLY

down to the roof level, as shown in Figure 24. Tighten the clamp around the pipe section. Use a level to make sure the pipe is truly vertical. With roofing nails, secure the support straps to the roof. Seal the nails holes heads with non-hardening mastic. Trim the excess length of the support straps that extend out beyond the edge of the flashing.

STEP 7. Slip the flashing over the pipe section protruding through the roof. Secure the base of the flashing to the roof with roofing nails. Use a non-hardening sealant between the uphill edge of the flashing and the roof. Insure the roofing material overlaps the top edge of the flashing as shown in Figure 24. Verify that you have at least the minimum clearance to combustibles at the roof line.

STEP 8. Continue to add pipe sections until the height of the vent cap meets the minimum code requirements. Refer to Figure 25 and Table 4. Note that for steep roof pitches, the vent height must be increased. In high wind conditions, nearby trees, adjoining roof lines, steep pitched roofs, and other similar factors can result in poor draft, or down drafting. In these cases, increasing the vent height may solve the problem.

STEP 9. Slip the storm collar over the pipe, and push it down to the top of the roof flashing as shown in Figure 24. Use the non-hardening sealant around the joint between the pipe and the storm

collar.

 

 

 

 

 

Roof Pitch

Minimum Height

STEP 10. Twist-lock the vent cap.

 

 

 

 

 

 

 

Feet

Meters

 

 

 

 

 

 

 

 

 

 

Flat to 7/8

1

0.3

 

 

 

 

 

 

 

Over 7/12 to 8/12

1.5

0.46

 

 

 

 

 

 

 

Over 8/12 to 9/12

2

0.61

 

 

 

 

 

 

 

Over 9/12 to 10/12

2.5

0.76

 

 

 

 

 

 

 

Over 10/12 to 11/12

3.25

0.99

 

 

 

 

 

 

 

Over 11/12 to 12/12

4

1.22

 

 

 

 

 

 

 

Over 12/12 to 14/12

5

1.52

 

 

 

 

 

 

 

Over 14/12 to 16/12

6

1.83

 

 

 

 

 

 

 

Over 16/12 to 18/12

7

2.13

 

 

 

 

 

 

 

Over 18/12 to 20/12

7.5

2.29

Figure 25: Height of Vertical Termination;

Reference Table 4.

 

 

 

 

 

Over 20/12 to 21/12

8

2.44

 

 

 

 

 

 

 

NOTES:

Table 4: Minimum ‘H’ for Figure 25

 

(1)If an offset is necessary in the attic to avoid obstructions, it is important to support the vent pipe every 3 feet (91 cm), to avoid excessive stress on the elbows, and possible separation. Wall straps are available for this purpose (see Figure 26).

(2)When ever possible, use 45° degree elbows instead of 90° degree elbows. The 45° degree elbow offers less restriction to the flow of flue gases and intake air.

NOTES:

(1)For multi story installations. A ceiling firestop is required at the second floor, and any subsequent floors (see Figure 27). The opening should be framed to 10” (25.4 cm) x 10” (25.4 cm) inside dimensions, in the same manner as shown in Figure 23.

20

Image 20
Contents For Your Safety WestportSafety Precautions GeneralTable of Contents Rear Vent DV Codes And ApprovalsTOP Vent DV Specifications DimensionsFor Your Safetyread Before Operating Operating InstructionsGas valve Maintenance And Service Electronic Ignition Module LocationTo Replace Handles for Removing DoorTo be Installed by a Qualified Service Agency only StepConversion instructions Natural Gas Initial Installation Qualified Installers onlyVenting Terminals Cannot be Recessed Into a Wall or Siding Restrictor plate settings For sufficient vent height above the roof line. For two Pipes and fittings, are Installing Vent Cap with Vinyl Siding Stand Off Corner installation rear vented with Once Wall Framing for Hole for VerticalTwist-lock the vent cap Multi-Story Vent Pipe Installation Installation Instructions KIT ComponentsCut away of spacers on Flex Pipe Fire stop Assembly of Venting into a Class ‘A’ Chimney Turn the elbow to the rear vent position and re-fasten with Screws removed in see FigureCorner Installation Installation for Top Vented Horizontal TerminationInstallation Wiring DiagramCanadian Installations A. InstallationsGeneral Venting Information Venting of a Fireplace Fitted with the Drafthood AdaptorOptional Finishing Automatic Safety Shut DownSpill Switch Replacement GAS Line Connection To Test Valve PressuresWire Size Max. Length Wiring Diagram For Fan ControlSecondary Installation Optional Blower Fan InstallationComplete Log Placement Log Placement with Rock Wool Brick panel bracket, slots shown Trouble Shooting Problem Possible Cause SolutionParts List Cast Reference Number Part Description Part NumberCast Leg Each Painted Parts Diagram Cast Parts List Components Reference Part Description Part NumberParts List Components Parts Diagram Components Warranty To the DealerInstallation Data Sheet