Enviro C-10794 owner manual Multi-Story Vent Pipe Installation

Page 21

Initial Installation

QUALIFIED INSTALLERS ONLY

Figure 27: Multi-Story Vent Pipe Installation.

Figure 26: Use of Wall Straps.

(2)Any occupied areas above the first floor, including closets and storage spaces, which the vertical vent passes through, must be enclosed. The enclosure may be framed and sheet rocked with standard building materials. However consult the appliance

manufactures installation instructions for the minimum allowable clearance between the outside of the vent pipe, and the combustible surfaces of the enclosure. Do not fill any required air spaces with insulation.

CATHEDRAL CEILING INSTALLATION:

STEP 1. Follow installation steps 1 & 2 under INITIAL INSTALLATION - VERTICAL INSTALLATION.

STEP 2. Using the plumb bob, mark the centerline of the venting system on the ceiling and drill a small hole through the ceiling and roof at this point. From the roof, locate the drill hole and mark the outline of the “Cathedral Ceiling Support Box”.

STEP 3. Remove shingles or other roof coverings as necessary to cut the rectangular hole for the “Support Box”. Cut the hole 1⁄8” larger than the “Support Box” outline.

STEP 4. Lower the “Support Box” through the hole in the roof until the bottom of the “Support Box” protrudes at least 2 inches (5 cm) below the ceiling. Align the “Support Box” both vertically and horizontally with a level as shown in Figure 28. Temporarily tack the “Support Box” in the place through the inside walls and into the roof sheathing.

STEP 5. Using tin snips, cut the “Support Box” from the top corners down to the roof line, and fold the resulting flaps over the roof sheathing (Figure 29). Before nailing it in to the roof, run a bead of non-hardening mastic around the top edges of the “Support Box”, to make a seal between the box and the roof. Clean out any combustible material from the inside of the “Support Box”.

21

Image 21
Contents Westport For Your SafetyGeneral Safety PrecautionsTable of Contents Codes And Approvals TOP Vent DVRear Vent DV Dimensions SpecificationsOperating Instructions For Your Safetyread Before OperatingGas valve Electronic Ignition Module Location Maintenance And ServiceHandles for Removing Door To ReplaceStep To be Installed by a Qualified Service Agency onlyConversion instructions Natural Gas Qualified Installers only Initial InstallationVenting Terminals Cannot be Recessed Into a Wall or Siding Restrictor plate settings For sufficient vent height above the roof line. For two Pipes and fittings, are Installing Vent Cap with Vinyl Siding Stand Off Corner installation rear vented with Wall Framing for Hole for Vertical OnceTwist-lock the vent cap Multi-Story Vent Pipe Installation KIT Components Installation InstructionsCut away of spacers on Flex Pipe Fire stop Assembly of Venting into a Class ‘A’ Chimney Screws removed in see Figure Turn the elbow to the rear vent position and re-fasten withInstallation for Top Vented Horizontal Termination Corner InstallationWiring Diagram InstallationA. Installations Canadian InstallationsGeneral Venting Information Venting of a Fireplace Fitted with the Drafthood AdaptorAutomatic Safety Shut Down Spill Switch ReplacementOptional Finishing To Test Valve Pressures GAS Line ConnectionWiring Diagram For Fan Control Wire Size Max. LengthOptional Blower Fan Installation Secondary InstallationComplete Log Placement Log Placement with Rock Wool Brick panel bracket, slots shown Problem Possible Cause Solution Trouble ShootingReference Number Part Description Part Number Parts List CastCast Leg Each Painted Parts Diagram Cast Reference Part Description Part Number Parts List ComponentsParts List Components Parts Diagram Components To the Dealer WarrantyInstallation Data Sheet