MartinLogan 33ISDG operating instructions Clearances and Height Requirements

Page 12

CLEARANCES and HEIGHT REQUIREMENTS

No combustible materials

within 8” of opening.

Do not cover louvers.

HEAT RESISTANT MATERIAL (MINIMUM REQUIRE- MENTS) WITH NO WOODEN MANTEL OR OTHER COM- BUSTIBLE PROJECTION

Heat resistant material (minimum requirements) with wooden mantel or other combustible projection:

To install the heater with a wooden mantel shelf or other combustible projection above, first measure the heat resistant material shown in Figure 7.

Hood

12"

10"

8"

6"

21/2"

26" 14"

10"

8"

Example: A mantel may project from the wall a maximum of 21/2" at minimum of 8" above the opening, and a maximum of 12" at a minimum of 26" above the opening.

Figure 7 - Measuring Heat Resistant

Figure 8 - Minimum Mantel Clearance

Material for Mantel

21/2"

8"

6"

Figure 9 is an example of an unsafe mantel installation. The mantel projects 4" at 8" above the opening, exceeding the maxi- mum acceptable distance of 21/2". The mantel also projects 8" at 10" above the opening, exceeding the maximum acceptable distance of 6".

No combustible materials within 8" of opening.

4"

If your mantel profile is unsafe, you may either:

• Raise the mantel to an acceptable height or,

• Remove the mantel.

Do not cover louvers.

8"

Hood

Figure 9 - Unsafe Mantel Clearance

12

23D8036

Image 12
Contents Model 33ISDG What to do if YOU Smell GASRead and Save These Instructions Contents Important Safety Information InstallerOwner This product must be installed by a Product Features OperationProduct Features and Specifications Natural GASPROPANE/LPG What YOU will Need for Installation Getting StartedMake Sure YOU have Received ALL Parts General Installation Information Installing CanopyRemoving Screen Codes Adequate Combustion and Ventilation AIRBTU/Hr = 15 1/ 2 x 12 x 1000 = 29760 BTU/Hr Before Installing the Fireplace Insert Clearances and Height RequirementsClearances and Height Requirements Minimum Clearance above Combustible Flooring Outer Wall Installation Fireplace FramingRemoving Grate and Base Assembly Securing Heater to FloorConnecting the GAS Access Holes Checking GAS Pressure Millivolt Control FigureElectrical Wiring MILLI-VOLT Connecting Optional Wall Switch or ThermostatThat does not Require 110 VAC to Operate Checking System Operation Complete Millivolt System CheckElectrical Wiring FAN WhiteLOG Placement Installing Blazing OAK Logs on BurnerInstalling Left Base Log #3 Installing Left Top Log #5 Installing Right Front Log #6 Placing Rock WoolFlame Appearance Checking the Pilot FlameThermostat and MILLI-VOLT Control Checking the Burner Flame Operating InstructionsFor Your Safety Read Before Lighting Operating InstructionsMILLI-VOLT/THERMOSTAT Control Lighting Instructions Match Lighting Instructions Operating Instructions and Blower OperationCleaning and Servicing Troubleshooting Observed Problem Possible Cause RemedyODS/pilot lights, but flame Illustrated Parts Breakdown Replacement Parts List DIS33N/PIllustrated Parts Breakdown Replacement Parts are Available Through Your Retailer Blazing OAK Logs BOCL1823D8036 Five Year Warranty Basic Warranty