FIREPLACE FRAMING

If unit is to be “built in,” fireplace framing can be built before or after the appliance is set in place. BE SURE

THAT ALL PACKING MATERIAL HAS BEEN REMOVED FROM THE UNDERSIDE OF THE UNIT PRIOR TO SETTING THE FIREBOX IN PLACE. Construct fireplace framing following Figures 11 through 14. See Figure 6 on page 11 for fireplace dimensions. The framing headers may not rest directly on top of the firebox.

The fireplace may be installed directly on a combustible floor or a raised platform of an appropriate height. Do not place fireplace on carpeting, vinyl, tile or other soft floor coverings. It may, however, be placed on flat wood, plywood, particle board or other hard surfaces. Be sure fireplace rests on a solid continuous floor or platform with appropriate framing for support and so that no cold air can enter from under the firebox.

225/8"

16"

331/2"

Figure 11 - Outer Wall Installation

Header

16"

331/2"

Figure 12 - Inner Wall Installation

271/2"

331/2"

Figure 13 - Stud Location

453/4"

153/8"

225/8"

16"

331/2"

641/4"

371/4"

317/8"

REF

Figure 14 - Corner Installation

14

23D8036

Image 14
Contents Read and Save These Instructions Model 33ISDGWhat to do if YOU Smell GAS Contents Owner Important Safety InformationInstaller This product must be installed by a Product Features OperationPROPANE/LPG Product Features and SpecificationsNatural GAS Make Sure YOU have Received ALL Parts What YOU will Need for InstallationGetting Started Removing Screen General Installation InformationInstalling Canopy Codes Adequate Combustion and Ventilation AIRBTU/Hr = 15 1/ 2 x 12 x 1000 = 29760 BTU/Hr Before Installing the Fireplace Insert Clearances and Height RequirementsClearances and Height Requirements Minimum Clearance above Combustible Flooring Outer Wall Installation Fireplace FramingRemoving Grate and Base Assembly Securing Heater to FloorConnecting the GAS Access Holes Checking GAS Pressure Millivolt Control FigureThat does not Require 110 VAC to Operate Electrical Wiring MILLI-VOLTConnecting Optional Wall Switch or Thermostat Checking System Operation Complete Millivolt System CheckElectrical Wiring FAN WhiteLOG Placement Installing Blazing OAK Logs on BurnerInstalling Left Base Log #3 Installing Left Top Log #5 Installing Right Front Log #6 Placing Rock WoolThermostat and MILLI-VOLT Control Flame AppearanceChecking the Pilot Flame Checking the Burner Flame Operating InstructionsFor Your Safety Read Before Lighting Operating InstructionsMILLI-VOLT/THERMOSTAT Control Lighting Instructions Match Lighting Instructions Operating Instructions and Blower OperationCleaning and Servicing Troubleshooting Observed Problem Possible Cause RemedyODS/pilot lights, but flame Illustrated Parts Breakdown Replacement Parts List DIS33N/PIllustrated Parts Breakdown Replacement Parts are Available Through Your Retailer Blazing OAK Logs BOCL1823D8036 Five Year Warranty Basic Warranty