MartinLogan 33ISDG Match Lighting Instructions, Operating Instructions and Blower Operation

Page 30

OPERATING INSTRUCTIONS AND BLOWER OPERATION

MATCH LIGHTING INSTRUCTIONS

1.Remove any items necessary for easy access to the pilot (for example: logs, screens, etc.).

2.Follow appropriate lighting instructions found previously. Instead of pushing and releasing the piezo button, light a match and hold the flame to the end of the pilot and ignite the pilot.

3.After control knob has been released and pilot stays lit, reinstall any items that were removed for pilot access.

4.Call a qualified service technician for repair or replacement of the piezo ignitor.

BLOWER OPERATION

Blower

Control

Figure 37 - Location of Blower Control

Locate the blower control by opening control access door. The variable controlled thermostat blower is located to the right of heater controls. .

In the OFF postion, the blower will not operate; however, the heater can be operated without the blower being ON. In the ON (AUTO) position, the blower will start when the thermostat senses a sufficient increase in firebox temperature.

Note: Your gas logs and blower will not turn on and off at the same time. The gas logs may burn several minutes before blower turns on.

30

23D8036

Image 30
Contents Model 33ISDG What to do if YOU Smell GASRead and Save These Instructions Contents Important Safety Information InstallerOwner This product must be installed by a Product Features OperationProduct Features and Specifications Natural GASPROPANE/LPG What YOU will Need for Installation Getting StartedMake Sure YOU have Received ALL Parts General Installation Information Installing CanopyRemoving Screen Codes Adequate Combustion and Ventilation AIRBTU/Hr = 15 1/ 2 x 12 x 1000 = 29760 BTU/Hr Before Installing the Fireplace Insert Clearances and Height RequirementsClearances and Height Requirements Minimum Clearance above Combustible Flooring Outer Wall Installation Fireplace FramingRemoving Grate and Base Assembly Securing Heater to FloorConnecting the GAS Access Holes Checking GAS Pressure Millivolt Control FigureElectrical Wiring MILLI-VOLT Connecting Optional Wall Switch or ThermostatThat does not Require 110 VAC to Operate Checking System Operation Complete Millivolt System CheckElectrical Wiring FAN WhiteLOG Placement Installing Blazing OAK Logs on BurnerInstalling Left Base Log #3 Installing Left Top Log #5 Installing Right Front Log #6 Placing Rock WoolFlame Appearance Checking the Pilot FlameThermostat and MILLI-VOLT Control Checking the Burner Flame Operating InstructionsFor Your Safety Read Before Lighting Operating InstructionsMILLI-VOLT/THERMOSTAT Control Lighting Instructions Match Lighting Instructions Operating Instructions and Blower OperationCleaning and Servicing Troubleshooting Observed Problem Possible Cause RemedyODS/pilot lights, but flame Illustrated Parts Breakdown Replacement Parts List DIS33N/PIllustrated Parts Breakdown Replacement Parts are Available Through Your Retailer Blazing OAK Logs BOCL1823D8036 Five Year Warranty Basic Warranty