PGS TC36 AR manual Firebox Panels Installation, Herringbone Panel SET Shown, Heritage RED

Page 22

FIREBOX PANELS INSTALLATION

(HERRINGBONE

.................. TCPN.7566)

(TUSCAN

TCPN.748)

(HERITAGE RED

................ TCPN.75704)

For porcelin panel kit (TCPN.75702) installation see in- structions provided with panel kit.

The Firebox Panels have to be installed for safe operation. Do not use the fi replace without panels. Unpack and inspect all panels. The panels need to be installed before the logs are in place.

Caution: The Brick Panels are very fragile, and should be handled with care.

1)Remove the log grate by removing the two screws retaining it. Screws are located behind the front legs of the grate.

2)Remove the Side Panel Retainers located on the underside of the upper fi rebox heatshield. The retainers are each held in place by one screw.

3)Install the Lower Rear Panel.

4)Install the Right Side Panel by inserting the bottom of the panel in fi rst and then angling it up into position.

5)Install the Left Side Panel by inserting the bottom of the panel in fi rst and then angling it up into position.

The rear panel is held tight against the side panels by two "V" brackets located on the firebox rear wall. Although the brackets are adjusted at the factory for the best fi t, some adjustment may be necessary. Adjust the angle of the bracket by hand to ensure a snug fi t.

Fig. #32

ADJUSTABLE "V" BRACKET

 

REAR LOWER PANEL

6)Install the Rear Upper Panel.

7)Re-install the Side Panel Retainers.

8)Install the Left and Right Front Panels.

9)Replace the Grate.

Fig. # 31

REAR UPPER PANEL

LEFT SIDE PANEL

HERRINGBONE PANEL SET SHOWN

RIGHT SIDE

PANEL

REAR LOWER

PANEL

LEFT FRONT

RIGHT FRONT

PANEL

PANEL

22 36ARB2

050505-36

Image 22
Contents Installation Operating Instructions What to do if YOU Smell GASContents Safety Fireplace DimensionsMantel Mantel Clearance ChartCeiling Mantel ClearanceTOP Standoffs Installation RequirementsLocating the Fireplace TC36.BFRKITA DimensionsSteel Stud Framing KIT Framing and FinishingInstallation Detail Concrete BoardHearth Extension Reconnect Pilot Flame indicator wiring and reinstallControl BOX Window FrameControl BOX Location Framing Detail Not OverVenting Exterior wall openingWall thimble Wall Thimble and Vent Must not Protrude Beyond SidingTrim to Length Vent pipe Wall Shield Thimble TCVT.THIMAInsulated Collar Shield Wall vent terminalWall Roof Termination Ceiling opening Roof Termination VentingVent Pipe Roof Support Bracket Ceiling firestopVent Pipe Mastic Storm Collar Vertical Termination CAPRoof vent terminal Vent Terminal Clearance Vent Terminal Minimum ClearancesVent Terminal Minimum Clearances to Adjacent Structures Insulated Collar Shield Vent Pipe SealantVent Pipe Sealant Be USED. see Section BelowRestrictor Wall and RoofTermination PositionGAS Supply Optional Wall SwitchManual Millivolt Valve Max. LengthWindow Frame Removal Herringbone Firebox Panels InstallationHerringbone Panel SET Shown Heritage REDTo Turn OFF GAS to Appliance For Your Safety Read Before LightingLighting Instructions First FireWall Thermostat Canada Only Optional GASC.THERMO HI-LO Flame AdjustmentExtend Shutdown Millivolt Pilot MaintenanceElectronic Pilot Replacement Parts DescriptionReplacement PARTS-MILLIVOLT Control Assembly Pilot Assembly NGReplacement Parts Electronic Control Assembly ELECTRONIC, Wire HarnessElectronic Valve Wiring Diagram Fig. #Wall Termination KIT Roof Termination KIT Vent Pipe Dimensions Pipe 10 1/4 16 1/4 10 15/16 22 1/4 46 1/4Pipe 23 1/4 27 5/8 PipeGastitetm Flex Line with Reducing Coupling Flexible Connector With Shutoff ValveVarious GAS Supply Connections Black Iron Pipe with UnionEN Case D’EMPLOI Avec Safety Label LocationFor USE with Natural GAS LP GAS Made in CanadaAllenby Rd., Duncan, BC V9L Phone