PGS TC36 AR manual Installation Requirements, TOP Standoffs, Locating the Fireplace

Page 5

INSTALLATION REQUIREMENTS

The Town & Country Fireplace installation and venting must conform to the current CAN/CGA-B149 installation code (in Canada) or the current National Fuel Gas Code, ANSI Z223.1 (in the USA), and approved per local codes. Only qualified (licensed or trained) personnel should install this product.

In the state of Massachusetts, only a licensed Plumber and Gas Fitter may install this product.

Fig. # 4

TOP

STANDOFFS

TOP STANDOFFS

The top standoffs are shipped loose inside the fi replace and must be installed on top of the fi replace as shown in fi g. #4. Do this once the fi replace is on site and in position.

LOCATING THE FIREPLACE

In planning the installation for the fi replace, it is necessary to determine where the unit is to be installed, location of vent system and where gas supply piping may be plumbed. Vari- ous installations are possible, such as, into an existing wall, a corner, a built-in wall or a wall projection (see Fig. #5). Due to high temperatures, do not locate this fi replace in areas of high traffi c or near furniture or draperies.

The minimum clearances from the fireplace to combus- tible surfaces must be adhered to and are shown on Fig.

# 2 and 3.

Fig. # 5

SEE FIG #9 FOR DIMENSIONS

Examples of Common Locations

CAUTION: When selecting a location, ensure that there is adequate room on the right hand or left hand side of the fi replace for the control box.

050505-36

36ARB2 5

Image 5
Contents What to do if YOU Smell GAS Installation Operating InstructionsContents Fireplace Dimensions SafetyCeiling Mantel Clearance ChartMantel Mantel ClearanceLocating the Fireplace Installation RequirementsTOP Standoffs Steel Stud Framing KIT DimensionsTC36.BFRKITA Framing and FinishingConcrete Board Installation DetailControl BOX Reconnect Pilot Flame indicator wiring and reinstallHearth Extension Window FrameNot Over Control BOX Location Framing DetailExterior wall opening VentingTrim to Length Wall Thimble and Vent Must not Protrude Beyond SidingWall thimble Insulated Collar Shield Wall Shield Thimble TCVT.THIMAVent pipe Wall vent terminalWall Roof Termination Vent Pipe Roof Support Bracket Roof Termination VentingCeiling opening Ceiling firestopRoof vent terminal Vertical Termination CAPVent Pipe Mastic Storm Collar Vent Terminal Minimum Clearances to Adjacent Structures Vent Terminal Minimum ClearancesVent Terminal Clearance Vent Pipe Sealant Vent Pipe SealantInsulated Collar Shield Be USED. see Section BelowTermination Wall and RoofRestrictor PositionManual Millivolt Valve Optional Wall SwitchGAS Supply Max. LengthWindow Frame Removal Herringbone Panel SET Shown Firebox Panels InstallationHerringbone Heritage REDLighting Instructions For Your Safety Read Before LightingTo Turn OFF GAS to Appliance First FireExtend Shutdown HI-LO Flame AdjustmentWall Thermostat Canada Only Optional GASC.THERMO Electronic Pilot MaintenanceMillivolt Pilot Description Replacement PartsPilot Assembly NG Replacement PARTS-MILLIVOLT Control AssemblyELECTRONIC, Wire Harness Replacement Parts Electronic Control AssemblyFig. # Electronic Valve Wiring DiagramWall Termination KIT Roof Termination KIT Pipe 10 1/4 16 1/4 10 15/16 22 1/4 46 1/4 Vent Pipe DimensionsPipe Pipe 23 1/4 27 5/8Various GAS Supply Connections Flexible Connector With Shutoff ValveGastitetm Flex Line with Reducing Coupling Black Iron Pipe with UnionFor USE with Natural GAS LP GAS Safety Label LocationEN Case D’EMPLOI Avec Made in CanadaAllenby Rd., Duncan, BC V9L Phone