FRAMING AND FINISHING
Note: The fireplace must be in place and venting installed before framing in or building an enclosure around the unit.
The Town & Country Fireplace must be framed in as described below or totally enclosed with
Determine the total thickness of facing material to be used. A thickness of 3/4" will allow the fi nishing surface to be fl ush with the front of the unit. If preferred, additional masonry type
A Steel Stud Framing Kit is supplied with the fi replace and must be used unless the fi replace is totally enclosed with
the fi replace is in its fi nal position. Secure the steel frame to the framing brackets on each side of the unit. Ensure that the studs are set back far enough to allow for thickness of fi nishing surface.
The sides, back and top of the fi replace can be framed in up to the steel studs and the fi replace standoffs using con- ventional lumber. Consult local building codes for specifi c requirements.
Due to high temperatures, concrete board is supplied with the fi replace and must be used to sheet in the front of the fi replace, extending 12" above and 4 1/2" to the side of the framing edge bars. See figure #7. Standard sheetrock (drywall) may be used beyond this.
Chase Insulation: When installing this fi replace against a
| Fig. # 6 | STEEL STUD FRAMING KIT |
|
| DIMENSIONS |
|
| (TC36.BFRKITA) |
| NONCOMBUSTIBLE |
|
| ZONE. DO NOT INSTALL |
|
| ANY COMBUSTIBLE |
|
| MATERIAL, ELECTRICAL |
|
| WIRING, INSULATION, |
|
| PLASTIC VAPOUR |
|
| BARRIER OR GAS |
|
| PLUMBING WITHIN THE |
|
| STEEL STUD FRAMING |
|
| ALL OTHER FRAMING |
|
| CAN BE DONE WITH |
|
| CONVENTIONAL |
|
| LUMBER |
|
6 | 36ARB2 |
|