Note: The fireplace must be in place and venting installed before framing in or building an enclosure around the unit.

The Town & Country Fireplace must be framed in as described below or totally enclosed with non-combustible material, such as facing brick.

Determine the total thickness of facing material to be used. A thickness of 3/4" will allow the fi nishing surface to be fl ush with the front of the unit. If preferred, additional masonry type non-combustible material can be installed above and to the sides up to 6 inches proud of the appliance. The finishing material must not interfere with glass frame access.

A Steel Stud Framing Kit is supplied with the fi replace and must be used unless the fi replace is totally enclosed with non-combustible material. Assemble the framing kit as per it's instructions. Attach the steel frame to the fi replace once

the fi replace is in its fi nal position. Secure the steel frame to the framing brackets on each side of the unit. Ensure that the studs are set back far enough to allow for thickness of fi nishing surface.

The sides, back and top of the fi replace can be framed in up to the steel studs and the fi replace standoffs using con- ventional lumber. Consult local building codes for specifi c requirements.

Due to high temperatures, concrete board is supplied with the fi replace and must be used to sheet in the front of the fi replace, extending 12" above and 4 1/2" to the side of the framing edge bars. See figure #7. Standard sheetrock (drywall) may be used beyond this.

Chase Insulation: When installing this fi replace against a non-insulated exterior wall or chase, it is recommended that the outer walls be insulated to same degree as other exterior walls. Do not place fireplace directly against the insulation. Cover the insulation and plastic vapour barrier with a solid surface, such as drywall (sheetrock). Consult local codes. Do not insulate or use plastic vapour barrier within the framing kit.

 

Fig. # 6

STEEL STUD FRAMING KIT

 

 

DIMENSIONS

 

 

(TC36.BFRKITA)

 

NONCOMBUSTIBLE

 

 

ZONE. DO NOT INSTALL

 

 

ANY COMBUSTIBLE

 

 

MATERIAL, ELECTRICAL

 

 

WIRING, INSULATION,

 

 

PLASTIC VAPOUR

 

 

BARRIER OR GAS

 

 

PLUMBING WITHIN THE

 

 

STEEL STUD FRAMING

 

 

ALL OTHER FRAMING

 

 

CAN BE DONE WITH

 

 

CONVENTIONAL

 

 

LUMBER

 

6

36ARB2

050505-36

Image 6
Contents Installation Operating Instructions What to do if YOU Smell GASContents Safety Fireplace DimensionsMantel Mantel Clearance ChartCeiling Mantel ClearanceInstallation Requirements TOP StandoffsLocating the Fireplace TC36.BFRKITA DimensionsSteel Stud Framing KIT Framing and FinishingInstallation Detail Concrete BoardHearth Extension Reconnect Pilot Flame indicator wiring and reinstallControl BOX Window FrameControl BOX Location Framing Detail Not OverVenting Exterior wall openingWall Thimble and Vent Must not Protrude Beyond Siding Wall thimbleTrim to Length Vent pipe Wall Shield Thimble TCVT.THIMAInsulated Collar Shield Wall vent terminalWall Roof Termination Ceiling opening Roof Termination VentingVent Pipe Roof Support Bracket Ceiling firestopVertical Termination CAP Vent Pipe Mastic Storm CollarRoof vent terminal Vent Terminal Minimum Clearances Vent Terminal ClearanceVent Terminal Minimum Clearances to Adjacent Structures Insulated Collar Shield Vent Pipe SealantVent Pipe Sealant Be USED. see Section BelowRestrictor Wall and RoofTermination PositionGAS Supply Optional Wall SwitchManual Millivolt Valve Max. LengthWindow Frame Removal Herringbone Firebox Panels InstallationHerringbone Panel SET Shown Heritage REDTo Turn OFF GAS to Appliance For Your Safety Read Before LightingLighting Instructions First FireHI-LO Flame Adjustment Wall Thermostat Canada Only Optional GASC.THERMOExtend Shutdown Maintenance Millivolt PilotElectronic Pilot Replacement Parts DescriptionReplacement PARTS-MILLIVOLT Control Assembly Pilot Assembly NGReplacement Parts Electronic Control Assembly ELECTRONIC, Wire HarnessElectronic Valve Wiring Diagram Fig. #Wall Termination KIT Roof Termination KIT Vent Pipe Dimensions Pipe 10 1/4 16 1/4 10 15/16 22 1/4 46 1/4Pipe 23 1/4 27 5/8 PipeGastitetm Flex Line with Reducing Coupling Flexible Connector With Shutoff ValveVarious GAS Supply Connections Black Iron Pipe with UnionEN Case D’EMPLOI Avec Safety Label LocationFor USE with Natural GAS LP GAS Made in CanadaAllenby Rd., Duncan, BC V9L Phone