Regency U37-NG NATURAL GAS, U37-LP PROPANE installation manual Converting a Masonry Chimney

Page 15

INSTALLATION

Converting a Masonry Chimney

Important: The existing masonry flue opening needs to have an area of at least a 36 sq. in. to insure proper intake/ex- haust flow.

1)Before cutting any holes, assemble the desired sections of black direct vent pipe to determine the center of the masonry pene- tration.

Termination

Cap

Top Adaptor

Flashing

4" Flex Liner

Retro

Connector

Black

Direct Vent

Pipe

Rigid Pipe

Adaptor

640-994

Diagram 6

2)Once the center point of the penetration has been determined, cut a 6" (152mm) dia. hole in the masonry. Be careful, if the hole is too large, the Retro Connector might not mount properly, and if the hole is too small, then the appliance might starve for intake air. If there is a frame wall in front of the masonry wall, cut and frame a 10" (254mm) clear square opening in the wall (centered around the 6" (152mm) masonry opening). IF there is sheet rock only (no studs) in front of the masonry, the 10" (254mm) clear opening is still needed, but does not need to be framed. This allows the Retro Connector to mount directly on the masonry and provide clear- ance to the combustibles. Diagram 11.

3)Secure the Flashing (Part # 705C) to the top of the masonry chimney using a bead of non-hardening sealant-adhesive. If the Flashing is larger than the top of the chim- ney, then cut and fold flashing as needed to fit chimney. Diagram 7.

Diagram 7

4)To determine the length of flex required, measure from 3" (76mm) above the top of the Flashing down to the level of the open- ing. Add to this measurement the distance from the center of the chimney to out through the wall. Cut a piece of 4" flex to this length (the flex should already be extended to its nominal length).

5)Connect the 4" flex liner to the Top Adaptor (Part # 985K) using 3 sheet metal screws. Diagram 2.

6)Feed the 4" flex liner through the Flashing into the chimney. Continue to feed the liner out through the opening in the masonry wall.

7)Secure the Top Adaptor to the Flashing. Use 3 sheet metal screws through the side of the adaptor into the flange on the Flashing (diagram 8). Twist lock the Termination Cap (Part # 980 or 991) on to the Top Adaptor.

Diagram 8

8)Attach the flex to the Retro Connector. Use 3 sheet metal screws to attach the flex liner to the Connector. Diagram 9. Mount the Retro Connector to the masonry wall using masonry bolts. Re-drill larger holes on con- nector as needed. Be careful to insure that the connector is centered in the opening and the mounting holes line up with the masonry wall.

Diagram 9

9)Slide the Wall Thimble Cover (Part # 940) over the Retro Connector and secure with masonry bolts. Diagram 10. If you have a framed wall in front of the masonry, use wood screws to mount the Wall Thimble Cover to the framed wall, over the Retro Connector and the 10" (254mm) square framed opening. Diagram 11. If needed, add a section of direct vent pipe to the Retro Connector in order to extend through the opening in the Wall Thimble Cover.

Diagram 10

Diagram 11

10)The connection between the appliance and the Retro Connector may be completed with a section of black direct vent pipe, together with an adjustable length pipe section.

U37 Regency ULTIMATE Rear Vent Direct Vent Freestanding Gas Heater

15

Image 15
Contents Installation Manual To the New Owner RegencyTable of Contents Serial No./No de serie 221 Safety LabelCopy of Safety Label for U37 Dimensions de l’orificeSave These Instructions InstallationSpecifications General Safety InformationCombustion and Ventilation AIR Checklist Combustibles Locating Your Ultimate GAS StoveClearances to Manufactured Mobile Home Additional RequirementsAir supply outlet See page 7 for Exterior Vent Termination requirements Venting Installation PrecautionsSafety Precautions for Installer Planning Your Venting Installation4DT-AJB Rigid Pipe Venting Components ListStraight Vertical Terminations Offset to Vertical TerminationsVent Restrictor Position Snorkel Terminations Horizontal InstallationsOptional Components Alternate Snorkel Termination CapHint Apply sealant to female end Vertical Termination with CO-LINEAR Flex System Required Parts DescriptionAlternate Approved Caps Converting a Factory Built Metal Chimney GeneralConverting a Masonry Chimney Conversion Kit from Natural Gas to Propane High Elevation Aeration AdjustmentLOG SET Installation GAS ConnectionA02-65 Valve Description GAS Pipe Pressure TestingOptional Remote ControlFinal Check Wiring Diagram Operating Instructions Temperatures keep children, clothing Clean. See installationCopy of the Lighting Plate Instructions Maintenance Never operate your unit with bro- ken glass Latch AdjustmentGlass Replacement Installing GlassTo remove fan FAN MaintenanceRemoving Valve Before removing the valveMaintenance U37 Main Assembly Parts ListU37 Burner & LOG Assembly U37 Door Assemblies Conditions WarrantyInstaller Please complete the following information