Regency E21-NG3, E21-LP3 LOG SET Installation, 27-23 27-30 27-27 27-24 27-28 27-25, 27-26

Page 14

INSTALLATION

LOG SET INSTALLATION

Read the instructions below carefully and refer to the images. Dangerous operating conditions may occur if the logs are not positioned in their correct locations. If the logs are broken do not use the unit until they are replaced. Broken logs can interfere with the pilot operation.

Log kit (Part # 533-930) contains the following pieces:

a)27-23 Back Center Log

b)

27-24

Middle Center Log

c)

27-25

Middle Right Log

d)

27-26

Front Right Log

e)

27-27

Center Front Log

f)

27-28

Middle Left Log

g)

27-29

Front Left Log

h)27-30 Back Right Log

i)

902-156

Embers Lava

j)

902-153

Rock Wool

k)

902-179

Vermiculite

l)946-669 Platinum Embers (supplied with packaged manual)

27-23

27-30

27-27

27-24

27-28

27-25

27-29

27-26

1)Carefully remove the logs from the box and unwrap them. The logs are fragile, handle with care - do not force into position.

2)Spread vermiculite around the fi rebox base. Then take some embers and spread them over the vermiculite as shown.

3)Fit log 27-23 into the pins on the back log tray.

27-23

4)Fit log 27-24 into the pins on the middle right hand side of the burner.

27-24

27-24

14

Regency® E21-3 Gas Fireplace Insert

Image 14
Contents E21 Gas Insert Congratulations Table of Contents Safety Label Duplicate Serial NoRequirements MA Code CO DetectorImportant Message Save These Instructions InstallationGeneral Safety Information Before YOU StartInstallation Checklist Minimum Fireplace ClearancesClearances to Combustibles Combustible boardGAS Connection High ElevationWiring Diagrams Lug DetailFlue Connector Installation For Propane Units and Units Equipped with DC Spark BoxesVenting GAS Pipe Pressure TestingOffset Flue Adaptor Test for Flue Spillage Valve DescriptionGAS Insert Aeration System Optional Brick Panel27-26 LOG SET Installation27-23 27-30 27-27 27-24 27-28 27-25 27-2327-27 27-26 27-24 27-26 27-2527-27 27-25 27-23 27-27 27-29 27-24 27-26 27-29 27-2827-30 27-23 Ensure not to cover any burner ports 27-27 27-23 27-24 27-30 27-29 27-26 27-25Faceplate & Trim Installation DiagramFlush Glass Flush Louvers Use of substitute glass will Void all product warrantiesOptional BAY Front BAY LouversQty Description LPG Conversion Kit Contains Qty DescriptionDC Sparker Kit Contains Installation of the DC Sparker Heat Shield Full Screen Doors Screen Door Hinge Location Bottom Frame Remote Control Wall Switch Wall ThermostatOperating Instructions Copy of Lighting Plate Instructions Maintenance Disconnect the power Door Glass ReplacementRemoving Valve Assembly Removing the FANParts List Main AssemblyBurner Assembly & LOG SET Bay Door Flush DoorFaceplate Assembly Warranty ConditionsInstaller Please complete the following information