Weil-McLain 550-141-829/1201 manual Connect Breeching, General chimney requirements

Page 12

Connect Breeching

General chimney requirements:

Designed for natural draft firing. Connect boiler to vertical chimney.

Insufficient draft can cause flue gas leakage and carbon

monoxide emissions, which will lead to severe personal injury or death.

Use vent material approved by local codes for oil-fired burners. In their absence, refer to:

NFPA 31, Installation of Oil-Burning Equipment.

NFPA 211, Standard for Chimneys, Fireplaces, Vents and Solid Fuel Burning Appliances.

In Canada, refer to CSA B139, Installation Code for Oil-Burning Equipment.

NFPA 211 requires chimney to be lined before connected to boiler.

Inspect existing chimney before installing new boiler. Failure to

do any of the following will result in severe personal injury or death:

Clean chimney, including removal of blockage.

Repair or replace damaged pipe or liner.

Repair mortar and joints.

To prevent downdrafts, extend chimney at least 3 feet above highest point where it passes through roof and 2 feet higher than any portion of building within 10 feet. Increase chimney cross-sectional area and height at least 4% per 1,000 feet above sea level.

Minimum clearances from vent pipe to combustible material:

6 inches — Type “L” doublewall vent

18 inches — Singlewall vent

Minimum chimney sizes should be used.

Oversized chimneys, outside masonry chimneys and/or

derated inputs can result in condensation in chimney.

Connect breeching:

Long horizontal breechings, excessive number of tees and

MINIMUM CHIMNEY SIZE TABLE

 

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

 

 

 

 

* * *

 

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

I=B=R

 

 

 

 

 

 

BOILER

 

 

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

MODEL

 

 

BREECHING

 

 

 

CHIMNEY SIZE

 

 

CHIMNEY

 

 

 

 

 

 

 

 

 

 

 

 

 

NUMBER

 

 

DIAMETER

 

 

 

RECT.

ROUND

 

 

HEIGHT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SGO-3

 

5"

 

 

8" x 8"

6"

 

15'

 

 

 

SGO-4

 

6"

 

*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SGO-5

 

6"

 

 

8" x 8"

7"

 

15'

 

 

 

 

 

 

 

 

 

 

 

 

 

SGO-6

 

7"

 

 

 

 

 

 

 

*

 

 

 

 

 

 

 

SGO-7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SGO-8

 

7"

 

 

8" x 12"

7"

 

20'

 

 

 

 

 

 

 

 

 

 

 

SGO-9

 

 

 

 

* *

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*6¾" x 6¾" inside liner

** 6½" x 10½" inside liner

** * Flue collar on boiler is 7" diameter

elbows, or other obstructions restricting combustion gas flow can result in possibility of condensation, flue gas leakage and carbon monoxide emissions, which can lead to severe personal injury or death.

1.Install 2 flue pipe brackets.

2.Connect full-sized breeching when possible. See Minimum Chimney Size Table.

Back outlet — see FIGURE 7.

Top outlet — see FIGURE 8.

3.Connection must be made above bottom of chimney to avoid blockage. Breeching must not enter chimney far enough to cause obstruction. Use thimble or slip joint where breeching enters chimney to allow removal for cleaning.

4.When burner and boiler are properly installed, draft overfire will be approximately -0.01"

to -0.02" W.C. Install barometric control in breeching, per control manufacturer's instructions, when excess draft needs to be relieved or to comply with applicable codes and regulations. Use draft gauge to adjust proper opening.

5.An induced draft fan for the chimney may be necessary if:

Excessive resistance to flow of combustion gases can be expected.

Cross-sectional area of chimney is smaller than minimum recommended.

Chimney height is less than recommended. Seal all vent joints. Interlock burner with

fan operation.

12

Image 12
Contents This Manual Includes Installation Start-Up Boiler Parts Symbol Definitions When Calling or Writing About the BoilerRead This Page First Hazard DefinitionsTable of Contents Before Installing Boiler Installations must comply withBefore selecting boiler location Provide clearances around boiler see FigureProvide air for combustion and ventilation Lay a foundation, if neededInstall Packaged Boiler Place boilerTankless heater, if used Perform hydrostatic pressure testInstall Non-Packaged Boiler Fiberglass wool and ceramic fiber materialsNon-Packaged SGO-3 through 6 position on site Install Non-Packaged Boiler Install Packaged and Non-Packaged Boiler Install burner also refer to instructions packed with burnerInstall Packaged and Non-Packaged Boiler Connect Breeching General chimney requirementsConnect Breeching Install piping Connect Steam PipingGeneral piping information Connect Steam Piping Connect Steam Piping Optional reservoir piping Condensate Receiver Capacity TableConnect Tankless Heater Piping To pipe tankless heaterConnect Wiring General wiring requirementsThermostat wiring Burner wiringConnect Wiring Low Water Cutoff Wiring Harness not furnished on a Boilers Connect Wiring Boiler Wiring for Probe-Type Lwco Connect Oil Piping General oil piping requirementsOil piping connection at burner Start-Up Fill the systemTips for steam systems To place in operationCheck-Out Procedure Check off steps as completedBurner adjustments for P and a boilers AppendixTo connect SGO boilers to indirect-fired water heaters Parts List Parts Drawing Dimensions DimensionsDimensions