Weil-McLain 550-141-829/1201 manual Optional reservoir piping, Condensate Receiver Capacity Table

Page 17

Connect Steam Piping CONTINUED

Optional reservoir piping:

Modern steam boilers are designed to steam for less time than older, larger boilers. When replacing an older steam boiler, the system condensate return time may be longer than the steaming time. This can cause the following problems:

Boilers fitted with an automatic water feed could overfill.

Units fitted with only a low water cutoff would shut down and cycle while waiting for condensate to return.

To size and install reservoir piping, see FIGURE 11 and Bulletin AE-8403 (available through your Weil-McLain distributor or sales office):

1.Pipe boiler as shown on pages 14 through 16.

2.Use 8" diameter reservoir pipe.

3.Locate centerline of reservoir pipe 1" below 26 7/8 " boiler waterline.

CONDENSATE RECEIVER CAPACITY TABLE

 

 

 

MINIMUM CONDENSATE RECEIVER CAPACITY – GAL.

 

 

 

 

 

 

 

 

RECOMMENDED

 

I=B=R GROSS

 

 

 

 

 

CONDENSATE

 

OUTPUT

GALLONS

15 MIN.*

30 MIN.*

45 MIN.*

60 MIN.*

FEED PUMPING RATE

BOILER

LBS STEAM

CONDENSATE

BOILER

BOILER

BOILER

BOILER

GPM

MODEL

PER HOUR

PER HOUR

OPERATION

OPERATION

OPERATION

OPERATION

AT 15 PSI

 

 

 

 

 

 

 

 

SGO-3

114

14

4

8

12

16

0.5

SGO-4

150

18

5

11

16

22

0.6

SGO-5

180

22

6

13

19

26

0.7

SGO-6

216

26

8

16

23

31

0.9

SGO-7

246

30

9

18

27

35

1.0

SGO-8

274

33

10

20

30

39

1.1

SGO-9

303

36

11

22

33

44

1.2

 

 

 

 

 

 

 

 

* Maximum time to when condensate returns to boiler.

Image 17
Contents This Manual Includes Installation Start-Up Boiler Parts When Calling or Writing About the Boiler Symbol DefinitionsRead This Page First Hazard DefinitionsTable of Contents Installations must comply with Before Installing BoilerBefore selecting boiler location Provide clearances around boiler see FigureLay a foundation, if needed Provide air for combustion and ventilationPlace boiler Install Packaged BoilerTankless heater, if used Perform hydrostatic pressure testFiberglass wool and ceramic fiber materials Install Non-Packaged BoilerNon-Packaged SGO-3 through 6 position on site Install Non-Packaged Boiler Install burner also refer to instructions packed with burner Install Packaged and Non-Packaged BoilerInstall Packaged and Non-Packaged Boiler General chimney requirements Connect BreechingConnect Breeching General piping information Install pipingConnect Steam Piping Connect Steam Piping Connect Steam Piping Condensate Receiver Capacity Table Optional reservoir pipingTo pipe tankless heater Connect Tankless Heater PipingGeneral wiring requirements Connect WiringThermostat wiring Burner wiringConnect Wiring Low Water Cutoff Wiring Harness not furnished on a Boilers Connect Wiring Boiler Wiring for Probe-Type Lwco Oil piping connection at burner Connect Oil PipingGeneral oil piping requirements Fill the system Start-UpTips for steam systems To place in operationCheck off steps as completed Check-Out ProcedureTo connect SGO boilers to indirect-fired water heaters Burner adjustments for P and a boilersAppendix Parts List Parts Drawing Dimensions DimensionsDimensions