Check-Out Procedure
Check off steps as completed:
❑1. Boiler properly filled with water?
❑2. Boiler piping checked for leaks (including tankless heater, if used)?
❑3. System vents operating properly?
❑4. Boiler properly skimmed?
❑5. Air purged from oil piping? Piping checked for leaks?
❑6. Flue cap in place and tightened? Burner door closed, sealed and nut tight? Burner plugged in and service switch on?
Obtain
leakage and carbon monoxide emissions, leading to severe personal injury or death.
❑7. Proper draft and burner flame? Final adjustment made with combustion test equipment?
❑8. Test pressure control: While burner is operating, move indicator on limit control below actual boiler steam pressure. Burner should go off. Raise setting on pressure control above steam pressure and burner should
❑9. Test low water cutoff(s): Follow control manufacturer’s instructions for testing procedures. Make sure burner goes off when control responds to low water condition. Burner should
❑10. Test additional
❑11. Limit control set to system
pressure requirements?
❑12. Thermostat heat anticipator setting (if available) set properly? Refer to “Connect wiring,” page 19.
❑13. Boiler cycled with thermostat? Raise to highest setting and verify boiler goes through normal
❑14. Observed several operating cycles for proper operation?
❑15. Set room thermostat(s) to desired
room temperature?
❑16. Completed Installation and Service Certificate below?
❑17. Reviewed Maintenance and Service Manual with owner or maintenance person and instructed person to keep for future reference?
❑18. Returned all instructions provided with boiler to its envelope and placed with boiler for future reference?
Installation and Service Certificate
Date Installed: ______________________________________________
Boiler Model Number: __________________Series: _________
CP Number(s):______________________________________________
❏
❏
❏
Installation instructions have been followed.
Above information is certified to be correct.
Measured Btu or GPH Input: _____________________________ | ❏ Information received and left with owner/ | |
| maintenance person. |
|
Installer:__________________________________________________________________________________________________________________________ | ||
(Company) | (Address) | (Phone) |
26 |
|
|
_________________________________________________________________
(Installer’s Signature)