Weil-McLain 550-141-829/1201 manual Table of Contents

Page 3

Table of Contents

Read all instructions before installing. Failure to follow all instructions in proper order can cause severe personal injury, death or substantial property damage.

Read This Page First . . . . . . . . . . . . . . . . . . . . . . . . .2

Table of Contents . . . . . . . . . . . . . . . . . . . . . . . . . . .3

Before Installing Boiler . . . . . . . . . . . . . . . . . . . . . .4-5

Install Packaged Boiler . . . . . . . . . . . . . . . . . . . . . . .6-7

Install Non-Packaged Boiler . . . . . . . . . . . . . . . . . . .7-11

Connect Breeching . . . . . . . . . . . . . . . . . . . . . . . . . .12-13

Connect Steam Piping . . . . . . . . . . . . . . . . . . . . . . .14-17

Connect Tankless Heater Piping . . . . . . . . . . . . . . .18

Connect Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . .19-23

Connect Oil Piping . . . . . . . . . . . . . . . . . . . . . . . . . .24

Start-Up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .25

Check-Out Procedure . . . . . . . . . . . . . . . . . . . . . . .26

Installation and Service Certificate . . . . . . . . . . . . .26

Appendix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .27

Parts List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .28

Parts Drawing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .29

Dimensions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .30-31

Ratings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Back Cover

3

Image 3
Contents This Manual Includes Installation Start-Up Boiler Parts Hazard Definitions Symbol DefinitionsWhen Calling or Writing About the Boiler Read This Page FirstTable of Contents Provide clearances around boiler see Figure Before Installing BoilerInstallations must comply with Before selecting boiler locationLay a foundation, if needed Provide air for combustion and ventilationPerform hydrostatic pressure test Install Packaged BoilerPlace boiler Tankless heater, if usedFiberglass wool and ceramic fiber materials Install Non-Packaged BoilerNon-Packaged SGO-3 through 6 position on site Install Non-Packaged Boiler Install burner also refer to instructions packed with burner Install Packaged and Non-Packaged BoilerInstall Packaged and Non-Packaged Boiler General chimney requirements Connect BreechingConnect Breeching Install piping Connect Steam PipingGeneral piping information Connect Steam Piping Connect Steam Piping Condensate Receiver Capacity Table Optional reservoir pipingTo pipe tankless heater Connect Tankless Heater PipingBurner wiring Connect WiringGeneral wiring requirements Thermostat wiringConnect Wiring Low Water Cutoff Wiring Harness not furnished on a Boilers Connect Wiring Boiler Wiring for Probe-Type Lwco Connect Oil Piping General oil piping requirementsOil piping connection at burner To place in operation Start-UpFill the system Tips for steam systemsCheck off steps as completed Check-Out ProcedureBurner adjustments for P and a boilers AppendixTo connect SGO boilers to indirect-fired water heaters Parts List Parts Drawing Dimensions DimensionsDimensions