Connect Oil Piping

General oil piping requirements:

Location and installation of oil tanks, oil piping and burners must follow:

NFPA 31, Standard for the Installation of Oil-Burning Equipment.

In Canada, CSA B139, Installation of Oil- Burning Equipment.

Local codes and regulations.

Information provided with burner and fuel pump.

If any part of fuel oil tank is above level of burner, an anti-siphon device must be used to prevent flow of oil in case of oil line break.

Support oil lines as required by codes.

Make tank connections with swing joints

or copper tubing to prevent breaking in case the tank settles. Make swing joints so they will tighten as tank settles. Non-hardening pipe joint compounds should be used on all threads.

Do not use Teflon tape as an oil

 

pipe sealant. It can cause valves

 

to fail, creating hazards. Do not use

 

compression fittings, only flare fittings.

Underground pipe must be run in a casing to prevent oil leaking into ground or under floor. Check local codes for information.

Oil piping connection at burner:

See FIGURE 15 for recommended connection at burner, allowing burner mounting door to swing open completely for servicing.

Recommended Oil Piping Connection to Burner

FIGURE 15

24

Image 24
Contents This Manual Includes Installation Start-Up Boiler Parts Symbol Definitions When Calling or Writing About the BoilerRead This Page First Hazard DefinitionsTable of Contents Before Installing Boiler Installations must comply withBefore selecting boiler location Provide clearances around boiler see FigureProvide air for combustion and ventilation Lay a foundation, if neededInstall Packaged Boiler Place boilerTankless heater, if used Perform hydrostatic pressure testInstall Non-Packaged Boiler Fiberglass wool and ceramic fiber materialsNon-Packaged SGO-3 through 6 position on site Install Non-Packaged Boiler Install Packaged and Non-Packaged Boiler Install burner also refer to instructions packed with burnerInstall Packaged and Non-Packaged Boiler Connect Breeching General chimney requirementsConnect Breeching Install piping Connect Steam PipingGeneral piping information Connect Steam Piping Connect Steam Piping Optional reservoir piping Condensate Receiver Capacity TableConnect Tankless Heater Piping To pipe tankless heaterConnect Wiring General wiring requirementsThermostat wiring Burner wiringConnect Wiring Low Water Cutoff Wiring Harness not furnished on a Boilers Connect Wiring Boiler Wiring for Probe-Type Lwco Connect Oil Piping General oil piping requirementsOil piping connection at burner Start-Up Fill the systemTips for steam systems To place in operationCheck-Out Procedure Check off steps as completedBurner adjustments for P and a boilers AppendixTo connect SGO boilers to indirect-fired water heaters Parts List Parts Drawing Dimensions DimensionsDimensions