11c Troubleshooting — control module lights (cont.)

CHART 7 — Insufficient heat or no heat to system (POWER light on steady)

Electrical shock hazard — Wherever you see ▲TURN OFF POWER▲, follow the instructions. Failure to follow instructions could result in severe personal injury, death or substantial property damage.

• Has it been at least 5 minutes since setting thermostat to call for heat? If not, wait 5 minutes. Is system heating?

Is thermostat set to call for heat? Remove thermostat wires at boiler and check continuity across the two wires. If circuit isn't closed, check external thermostat (zone valve, relay, etc.) wiring. Correct problems and retry.

Reconnect external thermostat wiring at boiler.

Is thermostat circuit closed (continuity across wires)?

 

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Boiler is in standby.

 

 

 

 

 

 

Are all red lights off?

 

Set thermostat to call for

 

 

 

 

 

 

 

heat and recheck

No

 

Yes

 

 

 

 

 

 

 

operation.

 

 

 

 

 

 

 

 

 

Verify Sequence of

 

 

 

 

 

 

Wait 30 seconds.

 

 

 

operation, Figure 30,

 

 

page 37.

Are all red lights off?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace control module. Retest.

If you have sufficient heat — boiler should be in normal operating sequence. (See normal sequence of operation, Figure 30, page 37.)

If you have less than sufficient heat —

Is vent piping free of blockage?

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Correct conditions and

 

Check heat loss

 

recheck operation.

 

 

calculation versus boiler

See Figure 30, page 37

 

 

size.

 

for normal sequence of

 

Clock gas input.

 

operation.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Wait for boiler water to cool to temperature 20 to 30 °F lower than temperature set on limit switch.

Are limit switch contacts closed?

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

• Boiler water temperature exceeded

 

 

 

 

setting on limit switch with thermostat

 

 

 

 

Replace

 

calling for heat. Boiler is OK. (See normal

 

sequence of operation, Figure 30, p. 37.)

 

limit switch.

 

 

 

• Also check setting on limit switch (should

Retest.

 

 

be above 140°F.).

 

 

 

 

 

 

 

 

 

 

 

 

Is boiler System circulator operating?

No

Yes

 

 

Remove CIRCULATOR harness plug from CIRCULATOR plug receptacle (Figure 38,

Item 7, page 50). Check with voltmeter across pins of control module receptacle.

Does voltmeter show 120 VAC across pins?

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace control

 

Repair/replace

 

 

 

 

 

 

module.

 

 

 

 

 

 

circulator. Retest.

 

 

 

 

 

Retest.

 

 

 

Repair/replace

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

wiring. Retest.

 

 

 

 

Wait 5 minutes.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is FLAME light on?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Is LIMIT light on?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

 

 

 

 

 

 

 

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check limit switch

 

 

 

 

Replace control module.

 

 

contacts with continuity

 

 

 

 

Retest.

 

 

checker.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Are limit switch contacts

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

closed?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check rollout switch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

continuity — is switch

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

closed?

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

No

 

 

Yes

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Replace rollout switch.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check any other

If rollout thermal fuse element has

 

 

 

 

 

 

limit controls wired

opened, determine cause and

 

 

 

 

 

 

 

into the limit

correct condition. Failure to do so

 

 

 

 

circuit. If all are

will cause severe personal injury,

 

 

 

 

OK, then replace

death or substantial property

 

 

 

 

 

 

 

control module.

damage.

 

 

 

 

 

 

 

 

 

 

 

Retest.

Part Number 550-110-710/0107

57

 

Image 57
Contents Gold CGi How it works Gold CGi Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances When removing boiler from an existing common vent system 1c Prepare boiler location vent systemChimney or vent require- ments Products to avoid 1d Prepare boiler location air contaminationAir openings must be provided 1e Prepare boiler location air openingsAir opening options Two openings Air supply from inside the buildingMotorized air dampers Exhaust fans and air moversSingle air opening option Exception for large spacesOrifice replacement procedure 2a Prepare boiler placement & setupPlace boiler/crate near position Inspect orifices and burnersHydrostatic pressure test 2b Prepare boiler pressure testDrain and remove fittings Prepare boiler for testVenting chimney draft venting 3a Venting general informationCGi venting methods Chimney draft or Direct exhaust Chimney draft ventingObtain vent system components 3c Venting Direct exhaust componentsVent StaR-34 Vent starter 3d Venting direct exhaust vent starterVent termination minimum clearances 3e Venting direct exhaust termination3f Venting direct exhaust installation Vertical venting See . Follow ventSidewall venting See Figures 14 Using any termination other than one of those shown 4a Water piping general information 4b Water piping single-zone system Diaphragm-type or bladder- type expansion tank FigureClosed-type expansion tank Piping multiple zones 4c Water piping multiple zonesZoning with circulators Temperature gauges 4d Piping low temperature systemsValve adjustment Primary/secondary preferred bypass piping methodPrimary/secondary piping BOILER-bypass piping method Valve adjustmentBoiler-bypass piping Zoning with SYSTEM-bypass piping method Prevent chilled water from entering boiler 4e Water piping refrigeration systemGas piping Connecting gas supply piping to boilerNatural Gas Propane GasElectrical installation must comply with Field wiringWiring connections Thermostat7a Start-up preparation Freeze protection when usedCheck for gas leaks Determine if water treatment is neededFill the system with water Do not use petroleum-based cleaning or sealing compoundsInspect system water piping Inspect base insulation7b Start-up operate boiler Start the boilerCheck system and boiler Check burner flames 7c Start-up if boiler doesn’t startCheck for Pilot burner flame FigureThermostats Check-out procedure checklistDuring main burner operation 9a Operation sequenceSchematic wiring diagram 9b Operation wiring diagramsLadder wiring diagram 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-8 Verify Proper Operation After Servicing 10a Service and maintenance schedule10b Service and maintenance annual start-up Burners and base 10b Service & maintenance annual start-upCondensate drain system Inducer motorCold fill and operating pressures Gas pipingAir vents and air elimination Limit controls and cutoffsReview with owner Boiler relief valveReview the User’s Information Manual with the owner 11b Troubleshooting components 11a Troubleshooting procedureBefore troubleshooting Air pressure switchTroubleshooting the control module Control indicator lightsControl indicator lights Lockout modes Control moduleControl module connections Chart Light flashing 11c Troubleshooting control module lightsRemove 120 VAC in plug , Item 3, page 50 on control module VAC in plugChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Usually indicates flame sensed when it shouldnt be there Chart 4 Flame & Power lights flashingDoes blower motor operate? Item 8 , Operation, Figure Verify Sequence12a Replacement parts Section assembly Base Jacket Trim ControlsControls Repair Parts Lists Section assembly 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Model Weil-McLain part numberBoiler Model Weil-McLain part number Fittings shown are included with boiler 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a Dimensions13b Ratings Removal of Combustion Chamber Lining or Base Panels Handling ceramic fiber and fiberglass materials