Weil-McLain 550-110-710/0107 manual Boiler, Model Weil-McLain part number

Page 63

GOLD CGi Gas-Fired Water Boiler — Boiler Manual

12d Replacement parts — jacket (continued)

 

1

 

2

3

4

5

 

 

 

 

 

 

 

 

 

 

 

 

Junction box, 2 x 4

Panel, left side,

Panel, right side,

Panel, top front,

Panel, top rear,

 

 

 

 

with insulation

with insulation

with insulation

with insulation

 

 

 

 

 

 

 

 

 

 

 

 

Boiler

 

Natural Gas

 

Propane Gas

 

 

 

 

Boiler

 

 

 

 

 

 

 

 

Model

 

 

 

Weil-McLain part number

 

 

 

Model

 

 

 

 

 

 

 

 

 

 

CGi-25

(Available at local

381-355-534

 

381-355-581

381-355-699

381-355-403

381-355-539

 

CGi-25

CGi-3

supply house)

381-355-541

 

381-355-584

381-355-699

381-355-403

381-355-539

 

CGi-3

CGi-4

 

381-355-546

 

381-355-587

381-355-699

381-355-413

381-355-551

 

CGi-4

CGi-5

 

381-355-553

 

381-355-590

431-223-311

381-355-420

381-355-558

 

CGi-5

CGi-6

 

381-355-560

 

381-355-601

431-223-311

381-355-427

381-355-565

 

CGi-6

CGi-7

 

381-355-567

 

381-355-604

431-223-311

381-355-434

381-355-572

 

CGi-7

CGi-8

 

381-355-574

 

381-355-607

431-223-311

381-355-441

381-355-579

 

CGi-8

 

 

 

 

 

 

 

 

 

 

 

6

7

 

8

9

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Panel, door

Cross tie,

 

Panel, interior,

Panel, rear,

Not shown — gold

 

 

 

Boiler

 

bottom front

 

with insulation

with insulation

touch-up paint

Boiler

 

 

 

 

 

 

 

 

Model

 

Weil-McLain part number

 

Model

 

 

 

 

 

 

 

 

 

 

 

CGi-25/3

381-355-540

431-223-325

 

381-355-405

431-223-300

592-000-000

CGi-25/3

 

CGi-4

381-355-552

431-223-326

 

381-355-415

431-223-301

 

CGi-4

 

CGi-5

381-355-559

431-223-327

 

381-355-422

431-223-302

 

CGi-5

 

CGi-6

381-355-566

431-223-328

 

381-355-429

431-223-303

 

CGi-6

 

CGi-7

381-355-573

431-223-329

 

381-355-436

431-223-304

 

CGi-7

 

CGi-8

381-355-580

431-223-330

 

381-355-443

431-223-305

 

CGi-8

 

 

 

 

 

 

 

 

 

 

 

Part Number 550-110-710/0107

63

 

Image 63
Contents Gold CGi How it works Gold CGi Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances When removing boiler from an existing common vent system 1c Prepare boiler location vent systemChimney or vent require- ments Products to avoid 1d Prepare boiler location air contaminationTwo openings Air supply from inside the building 1e Prepare boiler location air openingsAir openings must be provided Air opening optionsException for large spaces Exhaust fans and air moversMotorized air dampers Single air opening optionInspect orifices and burners 2a Prepare boiler placement & setupOrifice replacement procedure Place boiler/crate near positionPrepare boiler for test 2b Prepare boiler pressure testHydrostatic pressure test Drain and remove fittingsChimney draft venting 3a Venting general informationVenting chimney draft venting CGi venting methods Chimney draft or Direct exhaustObtain vent system components 3c Venting Direct exhaust componentsVent StaR-34 Vent starter 3d Venting direct exhaust vent starterVent termination minimum clearances 3e Venting direct exhaust termination3f Venting direct exhaust installation Vertical venting See . Follow ventSidewall venting See Figures 14 Using any termination other than one of those shown 4a Water piping general information 4b Water piping single-zone system Diaphragm-type or bladder- type expansion tank FigureClosed-type expansion tank Piping multiple zones 4c Water piping multiple zonesZoning with circulators Primary/secondary preferred bypass piping method 4d Piping low temperature systemsTemperature gauges Valve adjustmentPrimary/secondary piping BOILER-bypass piping method Valve adjustmentBoiler-bypass piping Zoning with SYSTEM-bypass piping method Prevent chilled water from entering boiler 4e Water piping refrigeration systemPropane Gas Connecting gas supply piping to boilerGas piping Natural GasThermostat Field wiringElectrical installation must comply with Wiring connectionsDetermine if water treatment is needed Freeze protection when used7a Start-up preparation Check for gas leaksInspect base insulation Do not use petroleum-based cleaning or sealing compoundsFill the system with water Inspect system water piping7b Start-up operate boiler Start the boilerCheck system and boiler Pilot burner flame Figure 7c Start-up if boiler doesn’t startCheck burner flames Check forThermostats Check-out procedure checklistDuring main burner operation 9a Operation sequenceSchematic wiring diagram 9b Operation wiring diagramsLadder wiring diagram 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-8 Verify Proper Operation After Servicing 10a Service and maintenance schedule10b Service and maintenance annual start-up Inducer motor 10b Service & maintenance annual start-upBurners and base Condensate drain systemLimit controls and cutoffs Gas pipingCold fill and operating pressures Air vents and air eliminationReview with owner Boiler relief valveReview the User’s Information Manual with the owner Air pressure switch 11a Troubleshooting procedure11b Troubleshooting components Before troubleshootingControl module Control indicator lightsTroubleshooting the control module Control indicator lights Lockout modesControl module connections VAC in plug 11c Troubleshooting control module lightsChart Light flashing Remove 120 VAC in plug , Item 3, page 50 on control moduleChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Usually indicates flame sensed when it shouldnt be there Chart 4 Flame & Power lights flashingDoes blower motor operate? Item 8 , Operation, Figure Verify Sequence12a Replacement parts Section assembly Base Jacket Trim ControlsControls Repair Parts Lists Section assembly 12b Replacement parts section assemblyBase assembly 12c Replacement parts baseDescription Weil-McLain Part number Jacket assembly 12d Replacement parts jacketBoiler Model Weil-McLain part numberBoiler Model Weil-McLain part number Fittings shown are included with boiler 12e Replacement parts trimPropane gas components 12f Replacement parts controlsDimensional drawing 13a Dimensions13b Ratings Removal of Combustion Chamber Lining or Base Panels Handling ceramic fiber and fiberglass materials