Weil-McLain 550-110-710/0107 manual 4d Piping low temperature systems, Temperature gauges

Page 24

GOLD CGi Gas-Fired Water Boiler — Boiler Manual

4d Piping — low temperature systems

Primary/secondary (preferred) bypass piping method

Primary/secondary bypass piping is preferred because the flow rate and temperature drop in the heating circuit(s) is determined only by the heating circuit circulator(s). So adjustment of the bypass valves in the boiler circuit will not cause a change in the heating circuit rate and temperature distribution.

Figures 20 and 21 show suggested bypass arrangements using primary/secondary bypass piping (preferred) for low temperature systems such as radiant heating systems or converted gravity systems. For alterna- tives, see pages 26 through 29.

The bypass valves (items 7a and 7b) provide mixing of hot boiler outlet water with cooler system return water

set to assure a minimum return water temperature (at least 130°F) to the boiler. Set the valves as explained below.

Temperature gauges

Gauge 4a is suggested, but optional on any system.

Gauge 4b is optional on converted gravity systems, but required on radiant heating systems — to display

the water temperature being supplied to the radiant tubing.

Gauge 8 is required on all systems to assure the return water temperature is accurately set for a minimum of 130°F. If this gauge is not available however, adjust the valves such that the boiler-mounted temperature/pres- sure gauge reads at least 150°F when the system return water is cold (approximately 60°F water temperature).

Valve adjustment

(Figures 20 and 21 only)

1.Set the valves while the system is cool, setting for the coldest expected water temperature (usually 60°F since the system will often drop to room tempera- ture between cycles).

2.Start with valve 7a fully closed and 7b fully open.

3.Gradually open valve 7a while closing valve 7b until the temperature at gauge 8 reads 130°F when gauge 4a reads 60°F.

4.Note that valve 7a regulates the amount of hot wa- ter from the boiler supply which mixes with return water.Valve 7b regulates the amount of system water flowing through the boiler secondary loop.

Failure to prevent low return water temperature to the boiler could cause corrosion of the boiler sections or burners, resulting in severe personal injury, death or substantial property damage.

Radiant heating system piping should include a means of regulating the boiler return water temperature and the system supply temperature (such as provided by an injec- tion pumping control).

Boiler return water temperature will be adequately controlled using the methods shown in this manual provided the system supply temperature is relatively constant.

DO NOT apply the methods of this manual if the system is equipped with an outdoor reset control. Instead, provide controls and piping which can regulate the boiler re- turn water temperature at no less than 130°F regardless of system supply temperature. Contact your Weil-McLain representative for suggested piping and control methods.

Failure to prevent cold return water temperature to the boiler could cause corrosion damage to the sections or burners, resulting in possible severe personal injury, death or substantial property damage.

24

Part Number 550-110-710/0107

 

Image 24
Contents Gold CGi How it works Gold CGi Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding 1a Prepare boiler location codes & checklist Installations must follow these codesBefore locating the boiler, check the following 1b Prepare boiler location clearances When removing boiler from an existing common vent system 1c Prepare boiler location vent systemChimney or vent require- ments 1d Prepare boiler location air contamination Products to avoid1e Prepare boiler location air openings Air openings must be providedAir opening options Two openings Air supply from inside the buildingExhaust fans and air movers Motorized air dampersSingle air opening option Exception for large spaces2a Prepare boiler placement & setup Orifice replacement procedurePlace boiler/crate near position Inspect orifices and burners2b Prepare boiler pressure test Hydrostatic pressure testDrain and remove fittings Prepare boiler for test3a Venting general information Venting chimney draft ventingCGi venting methods Chimney draft or Direct exhaust Chimney draft venting3c Venting Direct exhaust components Obtain vent system components3d Venting direct exhaust vent starter Vent StaR-34 Vent starter3e Venting direct exhaust termination Vent termination minimum clearances3f Venting direct exhaust installation Vertical venting See . Follow ventSidewall venting See Figures 14 Using any termination other than one of those shown 4a Water piping general information 4b Water piping single-zone system Diaphragm-type or bladder- type expansion tank FigureClosed-type expansion tank 4c Water piping multiple zones Piping multiple zonesZoning with circulators 4d Piping low temperature systems Temperature gaugesValve adjustment Primary/secondary preferred bypass piping methodPrimary/secondary piping Valve adjustment BOILER-bypass piping methodBoiler-bypass piping Zoning with SYSTEM-bypass piping method 4e Water piping refrigeration system Prevent chilled water from entering boilerConnecting gas supply piping to boiler Gas pipingNatural Gas Propane GasField wiring Electrical installation must comply withWiring connections ThermostatFreeze protection when used 7a Start-up preparationCheck for gas leaks Determine if water treatment is neededDo not use petroleum-based cleaning or sealing compounds Fill the system with waterInspect system water piping Inspect base insulation7b Start-up operate boiler Start the boilerCheck system and boiler 7c Start-up if boiler doesn’t start Check burner flamesCheck for Pilot burner flame FigureCheck-out procedure checklist Thermostats9a Operation sequence During main burner operation9b Operation wiring diagrams Schematic wiring diagramLadder wiring diagram 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-8 10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service and maintenance annual start-up 10b Service & maintenance annual start-up Burners and baseCondensate drain system Inducer motorGas piping Cold fill and operating pressuresAir vents and air elimination Limit controls and cutoffsReview with owner Boiler relief valveReview the User’s Information Manual with the owner 11a Troubleshooting procedure 11b Troubleshooting componentsBefore troubleshooting Air pressure switchControl indicator lights Troubleshooting the control moduleControl indicator lights Lockout modes Control moduleControl module connections 11c Troubleshooting control module lights Chart Light flashingRemove 120 VAC in plug , Item 3, page 50 on control module VAC in plugChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Usually indicates flame sensed when it shouldnt be thereDoes blower motor operate? Item 8 , Verify Sequence Operation, Figure12a Replacement parts Section assembly Base Jacket Trim ControlsControls Repair Parts Lists 12b Replacement parts section assembly Section assembly12c Replacement parts base Base assemblyDescription Weil-McLain Part number 12d Replacement parts jacket Jacket assemblyBoiler Model Weil-McLain part numberBoiler Model Weil-McLain part number 12e Replacement parts trim Fittings shown are included with boiler12f Replacement parts controls Propane gas components13a Dimensions Dimensional drawing13b Ratings Handling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels