Weil-McLain 550-110-710/0107 12a Replacement parts, Section assembly Base Jacket Trim Controls

Page 58

GOLD CGi Gas-Fired Water Boiler — Boiler Manual

 

12a Replacement parts

 

Section assembly

59

Base

60

Jacket

62

Trim

64

Controls

65

Replacement parts must be purchased through a local Weil-McLain distributor. When ordering, specify boiler model and size and include description and part number of replacement part. Results from using modified or other manufactured parts will not be covered by warranty and may damage boiler or impair operation.

Weil-McLain part numbers are found in Weil-McLain Boilers and

Controls Repair Parts Lists.

The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on page 68 of this manual. Failure to comply could result in severe personal injury.

58

Part Number 550-110-710/0107

 

Image 58
Contents Gold CGi How it works Gold CGi Gas-Fired Induced-Draft Water Boiler Contents Please read before proceeding Installations must follow these codes 1a Prepare boiler location codes & checklistBefore locating the boiler, check the following 1b Prepare boiler location clearances 1c Prepare boiler location vent system When removing boiler from an existing common vent systemChimney or vent require- ments 1d Prepare boiler location air contamination Products to avoidAir opening options 1e Prepare boiler location air openingsAir openings must be provided Two openings Air supply from inside the buildingSingle air opening option Exhaust fans and air moversMotorized air dampers Exception for large spacesPlace boiler/crate near position 2a Prepare boiler placement & setupOrifice replacement procedure Inspect orifices and burnersDrain and remove fittings 2b Prepare boiler pressure testHydrostatic pressure test Prepare boiler for testCGi venting methods Chimney draft or Direct exhaust 3a Venting general informationVenting chimney draft venting Chimney draft venting3c Venting Direct exhaust components Obtain vent system components3d Venting direct exhaust vent starter Vent StaR-34 Vent starter3e Venting direct exhaust termination Vent termination minimum clearancesVertical venting See . Follow vent 3f Venting direct exhaust installationSidewall venting See Figures 14 Using any termination other than one of those shown 4a Water piping general information Diaphragm-type or bladder- type expansion tank Figure 4b Water piping single-zone systemClosed-type expansion tank 4c Water piping multiple zones Piping multiple zonesZoning with circulators Valve adjustment 4d Piping low temperature systemsTemperature gauges Primary/secondary preferred bypass piping methodPrimary/secondary piping Valve adjustment BOILER-bypass piping methodBoiler-bypass piping Zoning with SYSTEM-bypass piping method 4e Water piping refrigeration system Prevent chilled water from entering boilerNatural Gas Connecting gas supply piping to boilerGas piping Propane GasWiring connections Field wiringElectrical installation must comply with ThermostatCheck for gas leaks Freeze protection when used7a Start-up preparation Determine if water treatment is neededInspect system water piping Do not use petroleum-based cleaning or sealing compoundsFill the system with water Inspect base insulationStart the boiler 7b Start-up operate boilerCheck system and boiler Check for 7c Start-up if boiler doesn’t startCheck burner flames Pilot burner flame FigureCheck-out procedure checklist Thermostats9a Operation sequence During main burner operation9b Operation wiring diagrams Schematic wiring diagramLadder wiring diagram 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-6 9c Operating instructions CGi-25 to CGi-8 10a Service and maintenance schedule Verify Proper Operation After Servicing10b Service and maintenance annual start-up Condensate drain system 10b Service & maintenance annual start-upBurners and base Inducer motorAir vents and air elimination Gas pipingCold fill and operating pressures Limit controls and cutoffsBoiler relief valve Review with ownerReview the User’s Information Manual with the owner Before troubleshooting 11a Troubleshooting procedure11b Troubleshooting components Air pressure switchControl indicator lights Lockout modes Control indicator lightsTroubleshooting the control module Control moduleControl module connections Remove 120 VAC in plug , Item 3, page 50 on control module 11c Troubleshooting control module lightsChart Light flashing VAC in plugChart 2 Tstat Circ & Power lights flashing Chart 3 Press Switch & Power lights flashing Chart 4 Flame & Power lights flashing Usually indicates flame sensed when it shouldnt be thereDoes blower motor operate? Item 8 , Verify Sequence Operation, FigureSection assembly Base Jacket Trim Controls 12a Replacement partsControls Repair Parts Lists 12b Replacement parts section assembly Section assembly12c Replacement parts base Base assemblyDescription Weil-McLain Part number 12d Replacement parts jacket Jacket assemblyModel Weil-McLain part number BoilerBoiler Model Weil-McLain part number 12e Replacement parts trim Fittings shown are included with boiler12f Replacement parts controls Propane gas components13a Dimensions Dimensional drawing13b Ratings Handling ceramic fiber and fiberglass materials Removal of Combustion Chamber Lining or Base Panels