Smith Cast Iron Boilers Complete Honeywell S8600 Manual for Installation

Page 14

Page 14

GB100W NATURAL OR PROPANE BOILER

 

INSTALLATION AND OPERATING INSTRUCTIONS

L2

W

W

 

RELAYCOIL

GC

W W

 

 

CIRC. W

T1

TRANSFORMER 40VA

R W

LOW-VOLTAGE 24VTHERMOSTAT

115V/1/60

 

Y

115V.

24V.

 

 

 

 

Y

 

 

 

 

24VGND

W

S8600

ELECTRONIC CIRCUIT

HONEYWELL

24V

 

R

BL

PV

MV

MV/PV

 

GASVALVE 12SECT.-VR8304

 

 

 

 

3-

R

BK

W

 

 

PV

MV

GND

MV/PV

HONEYWELL S8600

 

PILOT

Q345A

 

 

FIELDWIRING

FACTORYWIRING

BEREPLACED,

EQUIVALENT.

 

 

THERMAL

CUTOFF SWITCHES

SERVICESWITCH

N.O.CONTACT

BK 3 1

HIGH LIMIT

N.O. CONTACT

L1

BK

 

 

BL

 

W BK

BL

 

 

 

 

 

 

YR

 

STACKCONNECTDAMPER

R

W BK G R

BLUE-BL BLACK-BK RED-R WHITE-W YELLOW-Y GREEN-G

NOTBYSMITH

TERMINALSINJUNCTIONBOX

TERMINALSONCONTROLS

TERMINALSONHSICONTROL

BK

PLUGMOLEXWITHASSHOWN

BL

 

 

 

 

 

 

 

 

 

BL

 

 

 

 

 

 

 

 

 

WITHTHISAPPLIANCEMUST THERMOPLASTICWIREORIT'S

C

M35 STACKDAMPER

W G R BK

CONNECTSTACKDAMPER WITHMOLEXPLUGASSHOWN

MOLEXRECEPTACLE

MOLEXPLUG

BL

 

 

 

 

 

 

 

 

 

RBL

 

 

 

 

 

 

 

 

 

BKW

1

115V/1/60

L1 L2

 

 

 

 

 

 

BK W

 

 

 

 

 

 

W

 

 

BK

 

 

 

SERVICE SWITCH

 

 

Y

 

 

Y

 

FIELDWIRING

FACTORYWIRING

NOTBYSMITH

M

115VCIRCULATOR

R

W

LOW-VOLTAGE 24VTHERMOSTAT

Y BKBK

THERMAL CUTOFF

SWITCHES

 

BL

BL

BL

BK

W

 

115V

T1

40VA

 

24V

R

C

G

Y

6 4 1 3

CONTROLCENTER R8285AW/ R8222URELAY OR57-01V18BC3

BL-BLUE BK-BLACK R-RED W-WHITE Y-YELLOW VALVEGAS

SECTION12-

VR8304

BK

WMV/PV

R

GND

24V.W(GND)

24V.R

GREEN-G

 

 

 

 

 

 

 

 

 

 

 

MV

 

PV

 

 

 

 

3

 

 

 

 

 

 

 

 

 

 

MV

 

 

PV

 

 

 

 

 

 

 

 

MV/PV

 

 

 

 

 

R

 

 

 

 

 

 

W

 

 

 

 

 

 

 

HI-LIMIT

 

 

 

 

 

 

 

 

BL W W

Q345A

PILOT

SPARK HONEYWELL - S8600

PROTECTION AS REQUIRED.

MEANS AND OVERLOAD

PROVIDE DISCONNECT

1

ASSUPPLIED

TYPE105°

THEORIGINALWIRE

BEREPLACEDWITH

IFANYOF

ITMUST

Figure 13: Honeywell Intermittent Pilot Ignition

Image 14
Contents GB100W Contents Before YOU StartBoiler Ratings and Capacities Boiler LocationClearances to Combustible Construction FrontCombustion AIR Vent and Chimney DimensionsCombustible Floor Option Chimney Inspection & Sizing Vent ConnectionsCombustion Air Duct Sizing Common Vent SystemsVent Dampers Heating System Piping Heating System PipingCirculators Piping For Use With Cooling UnitsSystem Bypass Pumped BlendReverse Acting Aquastats Equivalent Length ChartGAS Supply Piping Gas Pipe CapacityThermostat Installation Electrical WiringElectrical Power Connections Vent DamperTheoriginalwire Bereplacedwith Ifanyof Itmust Fenwal/Honeywell Direct IgnitionWiththisappliancemust Thermoplasticwireorits Bereplaced EquivalentHoneywell Continuous Pilot Ignition Multi Zone Diagram Boiler SET UP Flame Roll-out Safety Shutoff SystemWhat to do if YOU Smell GAS For Your Safety Read Before OperatingLighting Instructions Comment Couper Ladmission DE GAZ DE Lappareil Pour Votre Sécurité Lisez Avant DallumerInstructions Dallumage QUE Paire SI Vous Sentez UNE Odeur DE GAZOperating Instructions To Turn OFF GAS to AppliancePour Votre Sécurité Lisez Avant DE Mettre EN Marche QUE Faire SI Vous Sentez UNE Odeur DE GAZIntermittent & Direct Ignition Systems Boiler OperationContinuous Pilot System Gas Pressure Adjustment Boiler Checking & AdjustmentPilot Adjustment Input RateBoiler Maintenance Controls Instructions to the InstallerVent System Replacement Parts GB100 Series Repair PartsSpark Ignition Honeywell Canadian Supplement Limited Lifetime Warranty For Residential Water Boilers Shortness of breath Page North ELM Street WESTFIELD, MA 01085 TEL 562-9631 FAX 413