Smith Cast Iron Boilers GB100W manual Clearances to Combustible Construction, Front

Page 4

Page 4

GB100W NATURAL OR PROPANE BOILER

 

INSTALLATION AND OPERATING INSTRUCTIONS

6.If the boiler is to be located in an alcove, closet or other confined space the distances from the boiler and it’s vent system to all combustible construction must be equal to or greater than the minimum clearances in Figure 1. When installed in a closet or confined space two permanent openings of equal area adjoining another room or rooms having sufficient volume to meet the requirements of an unconfined space must be provided. Each opening must have a minimum free area of one square inch per 1000 Btu/hr, 2200 mm2/kW based on the total input rating of all gas utilization equipment in the confined area. Each opening must be no less than 100 in2, 64516 mm2, in size. The upper opening must be within 12 in, 305 mm, of, but not less than 3 in, 76 mm, from the top of the enclosure. The bottom opening must be within 12 in, 305 mm, of, but not less than 3 in, 76 mm, from the bottom of the enclosure.

WARNING: Never install a PGB100W, propane boiler in a closet or other confined or enclosed spaceunless the installation conforms to the latest revision of the National Fuel Gas Code, ANSI Z223.1 and all applicable local building codes! Failure to comply with this WARNING could result in a fire or explosion causing extensive property damage, severe personal injury or death!

Figure 1: Clearances to Combustible Construction

 

 

 

 

 

C

* NO FRONT WALL IN ALCOVE

 

 

 

TO

 

A

COMBUSTIBLE

 

 

 

 

 

MATERIAL

E

F

 

 

 

 

 

 

 

 

 

D

 

 

 

B

 

 

FRONT

 

 

 

 

 

 

 

 

 

 

For

 

AL

 

CL

Servicing

in

mm

in

mm

in

mm

A

24

610

51

1295

N/A

N/A

 

 

 

 

 

 

 

B

*

*

2

51

N/A

N/A

C

6

152

6

152

6

152

D

4

102

4

102

4

102

E

7

178

7

178

10

254

F

4

102

4

102

10

254

AL = Alcove

CL = Closet

*No Front Wall in Alcove

Image 4
Contents GB100W Contents Before YOU StartBoiler Ratings and Capacities Boiler LocationClearances to Combustible Construction FrontCombustible Floor Option Vent and Chimney DimensionsCombustion AIR Vent Connections Combustion Air Duct SizingChimney Inspection & Sizing Common Vent SystemsVent Dampers Heating System Piping Heating System PipingCirculators Piping For Use With Cooling UnitsSystem Bypass Pumped BlendEquivalent Length Chart GAS Supply PipingReverse Acting Aquastats Gas Pipe CapacityElectrical Wiring Electrical Power ConnectionsThermostat Installation Vent DamperTheoriginalwire Bereplacedwith Ifanyof Itmust Fenwal/Honeywell Direct IgnitionWiththisappliancemust Thermoplasticwireorits Bereplaced EquivalentHoneywell Continuous Pilot Ignition Multi Zone Diagram Boiler SET UP Flame Roll-out Safety Shutoff SystemLighting Instructions For Your Safety Read Before OperatingWhat to do if YOU Smell GAS Pour Votre Sécurité Lisez Avant Dallumer Instructions DallumageComment Couper Ladmission DE GAZ DE Lappareil QUE Paire SI Vous Sentez UNE Odeur DE GAZOperating Instructions To Turn OFF GAS to AppliancePour Votre Sécurité Lisez Avant DE Mettre EN Marche QUE Faire SI Vous Sentez UNE Odeur DE GAZContinuous Pilot System Boiler OperationIntermittent & Direct Ignition Systems Boiler Checking & Adjustment Pilot AdjustmentGas Pressure Adjustment Input RateBoiler Maintenance Vent System Instructions to the InstallerControls Replacement Parts GB100 Series Repair PartsSpark Ignition Honeywell Canadian Supplement Limited Lifetime Warranty For Residential Water Boilers Shortness of breath Page North ELM Street WESTFIELD, MA 01085 TEL 562-9631 FAX 413