Smith Cast Iron Boilers GB100W manual

Page 31

GB100W NATURAL OR PROPANE BOILER

Page 31

INSTALLATION AND OPERATING INSTRUCTIONS

 

Image 31
Contents GB100W Before YOU Start ContentsBoiler Location Boiler Ratings and CapacitiesFront Clearances to Combustible ConstructionCombustible Floor Option Vent and Chimney DimensionsCombustion AIR Common Vent Systems Vent ConnectionsCombustion Air Duct Sizing Chimney Inspection & SizingVent Dampers Heating System Piping Heating System PipingPiping For Use With Cooling Units CirculatorsPumped Blend System BypassGas Pipe Capacity Equivalent Length ChartGAS Supply Piping Reverse Acting AquastatsVent Damper Electrical WiringElectrical Power Connections Thermostat InstallationFenwal/Honeywell Direct Ignition Theoriginalwire Bereplacedwith Ifanyof ItmustBereplaced Equivalent Withthisappliancemust ThermoplasticwireoritsHoneywell Continuous Pilot Ignition Multi Zone Diagram Flame Roll-out Safety Shutoff System Boiler SET UPLighting Instructions For Your Safety Read Before OperatingWhat to do if YOU Smell GAS QUE Paire SI Vous Sentez UNE Odeur DE GAZ Pour Votre Sécurité Lisez Avant DallumerInstructions Dallumage Comment Couper Ladmission DE GAZ DE LappareilTo Turn OFF GAS to Appliance Operating InstructionsQUE Faire SI Vous Sentez UNE Odeur DE GAZ Pour Votre Sécurité Lisez Avant DE Mettre EN MarcheContinuous Pilot System Boiler OperationIntermittent & Direct Ignition Systems Input Rate Boiler Checking & AdjustmentPilot Adjustment Gas Pressure AdjustmentBoiler Maintenance Vent System Instructions to the InstallerControls GB100 Series Repair Parts Replacement PartsSpark Ignition Honeywell Canadian Supplement Limited Lifetime Warranty For Residential Water Boilers Shortness of breath Page North ELM Street WESTFIELD, MA 01085 TEL 562-9631 FAX 413