|
| |
10 | Bottom Section | |
| ||
|
| |
Tools Needed: | Center the bottom section in the door | |
Hammer | opening. Level section using wooden shims | |
(if necessary) under the bottom section. | ||
| ||
Wood Shims |
|
jamb
jamb
header
weather
seal
level
bottom section
Wooden
Shims
INSTALLATION
11 | Vertical Track and Wall Angle | |
Installation | ||
Tools Needed: | IMPORTANT: The tops of the vertical | |
tracks must be level from side | ||
| ||
3/16” Drill Bit | to side. If the bottom section was | |
shimmed to level it. The vertical | ||
| ||
Power Drill | track on the shimmed side, must be | |
raised the height of the shim. | ||
7/16” Socket | Position the left hand vertical track assembly | |
Driver | over the rollers of the bottom section. Make sure | |
| the counterbalance cable is located between the | |
Tape Measure | rollers and the door jamb. Drill 3/16” pilot holes | |
for the lag screws. | ||
| ||
Level | Secure jamb brackets and flagangles to | |
| the jamb using 5/16 x 2” lag screws. Hang | |
Step Ladder | counterbalance cable over flagangle. Repeat for | |
| the right side. |
fLAGANGLE
5/16 x 2” LAG SCREWS
VERTICAL
TRACK
ASSEMBLY
BOTTOM SECTION
JAMB
BRACKET
vertical track
3/8 - 5/8”
roller
flagangle
hole selection
jamb bracket
5/16” x 2” lag bolt
13
Please Do Not Return This Product To The Store. Contact your local
local yellow pages/business listings or go to the Find a Dealer section online at