DUCTING FOR TWO ZONE INSTALLATIONS
In this installation the dehumidifier controls the humidity in two separate zones, a Primary and Secondary Zone.. The dehumidifier will dehumidify the Primary Zone as the first priority, and will switch to the Secondary Zone after the dehumidification needs of the Primary Zone have been satisfied..
IMPORTANT: Normally Closed dampers must be installed in the ducts serving the Primary Zone and Normally Open dampers installed in the ducts serving the Secondary Zone.
Required Components
10” Ductwork and Fittings Grilles with 10” Duct Collars Drain Line
2 – Aprilaire Model 6510, 10” Normally Closed Damper
2 – Aprilaire Model 6610, 10” Normally Open Damper
24 VAC Transformer (40VA min..) for Dampers
NOTE: 5442 Basement Kit includes 2 – 6510 Dampers,
2 – 6610 Dampers and a 24VAC (40VA) transformer
FIGURE 18 – Whole-Home Primary Zone Installation
TO/FROM | SUPPLY DUCT |
PRIMARY ZONE |
|
RETURN DUCT
NORMALLY CLOSED
DAMPERS
SUPPLY TO
6 ftSECONDARY ZONE MIN
RETURN FROM
SECONDARY ZONE
NORMALLY OPEN DAMPER
NORMALLY OPEN DAMPER
|
|
| |
FIGURE 19 – |
|
| |
|
| TO /FROM | SUPPLY DUCT |
|
|
| |
|
| SECONDARY ZONE |
|
| RETURN |
| NORMALLY |
| DUCT |
| OPEN |
|
|
| DAMPER |
| NORMALLY |
| SUPPLY TO |
RETURN FROM | OPEN |
| PRIMARY ZONE |
PRIMARY ZONE | DAMPER |
|
|
|
|
| |
|
|
| NORMALLY CLOSED DAMPER |
NORMALLY CLOSED DAMPER |
|
| |
|
|
| |
12 |
|
|
|