Burnham PVG manual Vent Piping, Horizontal Venting System. See Figures 4, 4A

Page 12

c.Tighten locking band by HAND with a 5/16” nut driver until snug plus ¼ turn. DO NOT SECURE JOINTS WITH SHEET METAL SCREWS OR POP RIVETS. DO NOT PUNCTURE THE VENT SYSTEM!

d.Once the installation is complete, operate appliance and inspect all joints to ensure that flue gases and/or liquid condensate will not escape.

D.Horizontal Venting System. See Figures 4, 4A and 5.

Vent Piping

1.This boiler is supplied with components as standard equipment for installation of the separate horizontal venting system.

2.Do not exceed maximum vent lengths. Refer to Table 4.

3.Recommended horizontal installation consists of vent being sloped down ¼ inch per foot away from boiler. See Figures 4 and 4A.

4.Use appropriate designed thimbles when passing through combustible walls (thimble use optional for noncombustible walls). Insert thimble through wall from outside. Secure outside flange to wall with nails or screws, and seal ID, OD and vent holes with sealant material. Install inside flange to inside wall, secure with nails or screws, and seal with sealant material.

5.For noncombustible wall application when thimble is not used, size opening such that bell with locking band attached cannot pass through.

6.Join vent terminal to vent pipe. See Figure 5.

7.Insert vent pipe through thimble/opening from outside and join to vent system. Apply sealant between vent pipe and opening/thimble to provide weathertight seal.

12

Image 12 Contents
PVG 8140708R8-8/08 Price $5.00Important Information Read Carefully Page Table of Contents Dimensions Pre-Installation II. Unpack Boiler Do not drop boiler. Do not bump boiler jacket against floor III. Venting Vent System Components Included with BoilerBurnham Vent System Components Vent LengthVent Guidelines Due to Removal of an Existing Boiler General GuidelinesInstall Vent Pipe, Burnham Gasketed Vent System Burnham Gasketed Vent Joint DetailVent Piping Horizontal Venting System. See Figures 4, 4ARecommended Horizontal Vent Installation Alternate Horizontal Vent Installation Horizontal Vent Terminal Configuration 3 or 4 Vent Vertical Venting System See Figures 6, 7 Vertical Vent Installation Page Install vent piping Exterior run to be included in equivalent vent lengthsIV. Water Piping and Trim Lwco LocationHow to Wire How to TestSupply Water Manifold Piping Page Page Gas Piping Failure to properly pipe gas supply to boiler mayGas Ratings Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring Single Heating Zone Only Wiring Schematic Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page VII. Modular Installation Module SizingDo not manifold vent pipes together Modular Boiler Water Manifold SizingModular Boiler Piping VIII. System Start-up Operating Instructions Operating Instructions Ignition Module Terminal Cross-ReferenceGreen LED Status Codes Honeywell Electronic Ignition Troubleshooting Guide Sequence of Operation Check limitAdjust gas input rate to boiler Gas Flow Rate in Cubic Feet Per HourIX. Service Low water cutoff if so equippedProcedure for measuring differential pressure See Figure Main Burners and FireboxFlue and Burner Cleanout, 1 Burner Differential Pressure Switch Settings Pilot Burner LocationPage Page XI. Repair Parts Casting Assembly Page Base Assembly Sheet Metal Screw, #8 x 1/2 FAN/CANOPY Assembly Page Burner Assembly Control Panel Assembly Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Limited Warranty