Burnham PVG manual Jacket Parts

Page 61

Key

Description

 

 

[Quantity] Part Number

 

 

 

 

 

 

 

 

 

No.

PVG-3

PVG-4

PVG-5

PVG-6

PVG-7

PVG-8

PVG-9

 

 

 

 

 

 

 

 

 

 

 

 

7. JACKET PARTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7A

Left Side Panel

 

 

 

60407002

 

 

 

 

 

 

 

 

 

 

 

 

7B

Right Side Panel

 

 

 

60407001

 

 

 

 

 

 

 

 

 

 

 

 

7C

Rear Panel

60407033

60407043

60407053

60407063

60407073

60407083

60407093

 

 

 

 

 

 

 

 

 

7D

Vestibule Panel

60407034

60407044

60407054

60407064

60407074

60407084

60407094

 

 

 

 

 

 

 

 

 

7E

Top Panel

60407032

60407042

60407052

60407062

60407072

60407082

60407092

 

 

 

 

 

 

 

 

 

7F

Front Door

101354-03

101354-04

101354-05

101354-06

101354-07

101354-08

101354-09

 

 

 

 

 

 

 

 

 

7G

Jacket Cover Plate

 

 

 

80407001

 

 

 

 

 

 

 

 

 

 

 

 

7H

Handle

 

 

 

8056184

 

 

 

 

 

 

 

 

 

 

 

 

7J

Door Clip

 

 

 

[2] 7041921

 

 

 

 

 

 

 

 

 

 

 

 

7K

Bushing

 

 

 

8136048

 

 

 

 

 

 

 

 

 

 

 

 

7L

Burnham Logo

 

 

 

81460099

 

 

 

 

 

 

 

 

 

 

 

 

61

Image 61 Contents
8140708R8-8/08 Price $5.00 PVGImportant Information Read Carefully Page Table of Contents Dimensions Pre-Installation Do not drop boiler. Do not bump boiler jacket against floor II. Unpack BoilerVent System Components Included with Boiler III. VentingVent Length Burnham Vent System ComponentsGeneral Guidelines Vent Guidelines Due to Removal of an Existing BoilerBurnham Gasketed Vent Joint Detail Install Vent Pipe, Burnham Gasketed Vent SystemHorizontal Venting System. See Figures 4, 4A Vent PipingRecommended Horizontal Vent Installation Alternate Horizontal Vent Installation Horizontal Vent Terminal Configuration 3 or 4 Vent Vertical Venting System See Figures 6, 7 Vertical Vent Installation Page Exterior run to be included in equivalent vent lengths Install vent pipingLwco Location IV. Water Piping and TrimHow to Test How to WireSupply Water Manifold Piping Page Page Failure to properly pipe gas supply to boiler may Gas PipingGas Ratings Valves Fully Open Page VI. Electrical Internal Boiler Wiring Schematic Diagram Internal Boiler Wiring Ladder Diagram System Controls and Wiring Single Heating Zone Only Wiring Schematic Page Circulator Zoned System Wiring Schematic Zone Valve Zoned System Wiring Schematic Page Module Sizing VII. Modular InstallationDo not manifold vent pipes together Modular Boiler Water Manifold SizingModular Boiler Piping VIII. System Start-up Operating Instructions Ignition Module Terminal Cross-Reference Operating InstructionsGreen LED Status Codes Honeywell Electronic Ignition Troubleshooting Guide Check limit Sequence of OperationGas Flow Rate in Cubic Feet Per Hour Adjust gas input rate to boilerLow water cutoff if so equipped IX. ServiceMain Burners and Firebox Procedure for measuring differential pressure See FigureFlue and Burner Cleanout, 1 Burner Pilot Burner Location Differential Pressure Switch SettingsPage Page XI. Repair Parts Casting Assembly Page Base Assembly Sheet Metal Screw, #8 x 1/2 FAN/CANOPY Assembly Page Burner Assembly Control Panel Assembly Jacket Parts Miscellaneous Parts Carton Avoid Breathing Fiber Particulates and Dust Limited Warranty