6)Vertical Terminal Installation - In addition to the vertical terminal, either a Flat Roof Flashing (PN 230533) or Sloped Roof Flashing (PN 230535) is required for this installation.

a)Determine the center line of the terminal location on the roof. If the roof is flat, cut a 5-1/2” diameter hole for the terminal. If the roof is sloped, cut a hole large enough for the terminal to pass through the roof while remaining plumb. Caution: If the boiler is installed directly under the hole, cover it while cutting the hole to prevent saw dust and other debris from falling into the boiler.

b)Install the roof flashing using standard practice for the roofing system on the structure.

c)If not already done, assemble the venting system inside the building. The last section of pipe needs to be on the same center line as the terminal and within 19-1/4” of the top edge of the roof flashing (Figure 7.35a).

d)Measure distance “H” from the top edge of the storm collar to the end of the last fitting as shown in Figure 7.35a.

e)Add 1” to distance “H”. Carefully mark this length on the pipe as shown in Figure 7.35b.

f)Cut the outer pipe only at the point marked in Step (e) using aviation shears, a hacksaw, or an abrasive wheel cutter. Be careful to cut the pipe square. De-burr the cut end with a file or emery cloth.

g)Place a mark on the aluminum inner pipe 3/8” beyond the end of the outer pipe (Figure 7.35b). Use a fine tooth hacksaw to cut the aluminum pipe and be careful to cut the pipe square. De-burr the cut edge of the aluminum pipe with a file or emery cloth.

h)Make a mark on the terminal section 1” from the cut end of the outer pipe as shown in Figure 7.35b.

i)Slip the terminal section through the roof from the outside. Push into the last section of vent pipe until the mark the mark made in Step (h) is not longer visible. Secure the terminal to the last piece of pipe with three #10 x 1/2” sheet metal screws. Drill a 1/8 hole through both outer pipes to start these screws. Use a drill stop or other means to ensure that the drill bit does not penetrate more than 3/8” into the outer pipe. Do not use a sheet metal screw longer than 1/2”.

j)Secure the terminal section to the inside of the roof structure using the mounting bracket provided with the terminal Figure 7.35c).

7)Chimney Chase Installation - A vertical 80/125mm vent system can be installed in an unused masonry chimney. This installation is similar to other vertical installations with the following exceptions (Also see Figure 7.36):

a)The chimney chase elbow kit (PN230530) is used at the base of the chimney. This kit consists of a support elbow and a mounting bracket. Slip the elbow over the M10 x 35 screw in the support bracket. Determine the desired vertical location of the support elbow in the chimney and mark the location of the pin on the back of the support bracket on the back wall of the chimney. Drill a 7/16”dia x 2-1/2” deep hole at this location to support the back of the bracket. The front of the elbow mounting bracket is supported by the bottom of the opening into the chimney or by an installer supplied bracket.

b)Construct a weather-tight flat roof to cover the top of the old chimney. Install the vertical terminal through this roof using the flat roof flashing.

Figure 7.35a: Dimension “H”

30

Image 32
Contents MWC Series Page Table of Contents Product Description Key ComponentMWC Boiler Principle Components II Specifications RatingsMaximum Vent Lengths Other SpecificationsIII Before Installing Clearances To Combustible Or Non-combustible Material Mounting The Boiler Wall Mounting Hole Locations Boiler Mounting VI Air for Ventilation Page VII Venting Vent System DesignPage Horizontal Concentric Venting Vent Options 3a Crown Concentric 60/100 Vent Components Vent Options 1,2 3b Crown Concentric 80/125 Vent Components Vent Options 3,54c Positioning Vent Terminal Under Overhangs Vent/ Air Intake Fitting Equivalent Length Vertical Concentric Vent System Vent Option Removing an Existing Boiler From a Common Chimney All cuts are square and allow for proper insertion 21 Dimension L 22 Cutting Outer Pipe 25 Attaching 60/100mm Terminal Section 30 Installation Of 80/125 Adaptor On Boiler 31a Cuttable Straight Section 32 Cutting Straight Pipe 33a Joining Cuttable Pipe 34a Dimension L, 80/125mm Horizontal Terminal 34c Cutting Inner Pipe Of 80/125mm Horizontal Terminal 35a Dimension H 35b Cutting Vertical Terminal 36 Chimney Chase Installation Condensate Trap and Drain Line 40 Condensate Piping ArrangementViii Gas Piping Gas Connection To Boiler IX System Piping Standard PipingBasic Piping Relief Valve Installation Piping for Special Situations Internal Boiler PipingPrimary-Secondary Piping MWC116E*T Combi Internal Boiler-Side Piping Schematic MWC116E*L Heat-Only Internal Piping Schematic Domestic Water Piping DHW Piping MWC116E*T Combi Internal DHW-Side Piping Schematic XI Wiring Field Supplied Box End Boiler End Location of Terminal Blocks and 7/8 Hole for Whip Field Wiring 120VAC Thermostat Internal Boiler Wiring XII Start-up and Checkout Location of Automatic Air Vent CapLocation of Circulator Shaft Cover Control Panel Page Inner Cover Removal For Your Safety Read Before Operating MWC Series Lighting and Operating InstructionsHigh Fire Combustion Readings Xiii Operation DHWHeating System Knob Sequence of Operation Also Refer to Figures 9.7, 9.8, 10.3 See Part XV for Error Codes Flash Codes During Normal OperationXIV. Service and Maintenance Removing Combustion Chamber Cover Service Notes InducerCondensate Trap Removal XV. Troubleshooting No Error Code DisplayedError Codes Lamp Number Flame Meaning Corrective ActionFlow Chart for Isolating Limit and APS Errors See Table XVI Parts Flow group and three way diverter valve Model combi Flow and return groups Model c.h. only Pump and main circuit assembly Model combi Pump and main circuit assembly Model c.h. only Gas assembly Connection pipes Control panel and ignition device Model combi Control panel and ignition device Model c.h. only Wiring Model combi Wiring Model c.h. only Fan, combustion chamber and case panels Description Spare part code Description Spare part code Description Spare part code Installation of Carbon Monoxide Detectors Approved Carbon Monoxide Detectors 11/07

MWC116ENL, MWC116ELL, MWC116ELT, MWC116ENT, MWC Series specifications

Crown Boiler's MWC Series represents a commendable choice in the realm of residential and light commercial heating solutions. Specifically, models like the MWC116ENT, MWC116ELT, MWC116ELL, and MWC116ENL stand out due to their exceptional performance, reliability, and innovative features.

At the core of the MWC Series lies a robust cast iron boiler construction designed to withstand the test of time. This material not only provides durability but also enhances heat retention, thereby increasing the system's efficiency. Each model in this series is designed for natural gas or propane fuel types, ensuring flexibility based on availability and user preference.

A notable feature of the MWC116 models is the efficient heat exchanger, which enables rapid heating of water for both space heating and domestic hot water applications. With a heating capacity of 116,000 BTUs, these boilers deliver ample warmth for mid-sized homes or light commercial settings, making them a versatile option for various applications.

The MWC116ENT model is equipped with an energy-efficient electronic ignition system, which enhances reliability and efficiency. This technology reduces energy consumption, providing users with cost savings on their utility bills. Similarly, the MWC116ELT model boasts an integrated aquastat that regulates water temperature, ensuring optimal performance and comfort.

For those requiring increased venting options, the MWC116ELL model includes advanced horizontal venting capabilities, allowing for flexible installation in various environments. This feature aids in overcoming space limitations and facilitating optimal combustion conditions. The MWC116ENL, on the other hand, features a low NOx emissions configuration, making it an environmentally conscious choice for users concerned about their carbon footprint.

User-friendly controls are a characteristic hallmark of the MWC Series, enabling straightforward operation and easy adjustments. The boilers come equipped with a digital display that provides critical system information and diagnostics, streamlining maintenance efforts.

Overall, the Crown Boiler MWC Series, particularly models like the MWC116ENT, MWC116ELT, MWC116ELL, and MWC116ENL, offer an impressive blend of efficiency, flexibility, and advanced technology. These units are designed to meet contemporary heating demands while ensuring sustainable operation, making them a wise investment for comfort and performance in residential and light commercial applications alike. With reliable construction and innovative features, the MWC Series remains a top choice for those seeking effective heating solutions.