Heatiator NDI30-SPFK, NDI35-SPFK Burner Ignition and Operation, Standing Pilot Flame Patterns

Page 14

Burner Ignition and Operation

Frequency: Annually

By: Service Technician

Tools needed: Protective gloves, vacuum cleaner, whisk broom, flashlight, voltmeter, indexed drill bit set, and a manometer.

Verify burner is properly secured and aligned with pilot or igniter.

Clean off burner top, inspect for plugged ports, corrosion or deterioration. Replace burner if necessary.

Replace Glowing embers with new dime-size pieces. DO NOT block ports or obstruct lighting paths. Refer to Section 12 for proper ember placement.

Verify batteries have been removed from battery back- up IPI systems to prevent premature battery failure or leaking.

Check for smooth lighting and ignition carryover to all ports. Verify that there is no ignition delay.

Inspect for lifting or other fl ame problems.

Verify batteries have been removed from battery back-up IPI systems to prevent premature battery failure or leaking. For optimal battery life, locate the battery pack outside of the control cavity on the hearth. This placement will reduce the chances of overheating the batteries during extended burns which could result in reduced battery life or degradation.

Inspect orifi ce for soot, dirt and corrosion. Verify orifi ce size is correct. See Service Parts List for proper orifi ce sizing.

Verify manifold and inlet pressures. Adjust regulator as required.

Inspect pilot fl ame pattern and strength. See Figure 3.1 or Figure 3.2 for proper pilot flame pattern. Clean or replace orifi ce spud as necessary.

Inspect thermocouple/thermopile or IPI flame sensing rod for soot, corrosion and deterioration. Clean with emery cloth or replace as required.

Verify thermocouple/thermopile millivolt output. Replace pilot as necessary. (Standing pilot only)

Verify that there is not a short in fl ame sense circuit by checking continuity between pilot hood and flame sense rod. Replace pilot as necessary. (IPI only)

Figure 3.1 Standing Pilot Flame Patterns

Figure 3.2 IPI Pilot Flame Patterns

14

Heatilator • NDI30, NDI30-SP, NDI35, NDI35-SP, NDI30-SPFK, NDI35-SPFK2226-900 Rev. G • 4/11

Image 14
Contents HOT Surfaces ModelsWhat to do if you smell gas Xxxxxxxx CongratulationsHomeowner Reference Information Table of Contents User GuideLimited Lifetime Warranty Limited Lifetime WarrantyWarranty Conditions Listing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions User Guide Clear Space Fixed Glass AssemblyRemote Controls, Wall Controls and Wall Switches Before Lighting FireplaceWhat to do if YOU Smell GAS Lighting Instructions IPIFinal inspection by GAS ValveFor Your Safety Read Before Lighting Lighting Instructions Lighting Instructions Standing PilotAfter Appliance is Lit Frequently Asked QuestionsIssue Solutions Glass Cleaning Maintenance and ServiceMaintenance Tasks-Homeowner Remote ControlVenting Maintenance Tasks-Service TechnicianGasket Seal and Glass Assembly Inspection LogsBurner Ignition and Operation Standing Pilot Flame PatternsGetting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed TOP View Front View Side View Minimum Fireplace Size Fireplace Size RequirementsMinimum Fireplace Opening NDI35 NDI30Mantel and Wall Projections Side View TOP ViewTermination Locations Vent Termination Minimum ClearancesInstallation Preparation Vent Limits Installing Vent Pipe and ApplianceConnecting Vent Pipe Venting ComponentsPlacing, Securing and Leveling the Appli- ance fi replace openingFactory Built Wood Burning Installing Adaptor and Termination CapMasonry Damper Flashing Kit OptionalGas Pressure Gas InformationFuel Conversion Gas ConnectionIntelliFire Ignition System Wiring Wiring RequirementsStanding Pilot Ignition System Wiring Electrical InformationValve WHT Pilot Assembly Thermocouple ThermopileRED Optional Accessories Requirements Blower Plug 120V Existing Outlet Temperature Sensor SwitchInstallation for Fan Optional Finishing Clearances to Mantels or other Combustibles above ApplianceAppliance Setup LOG #5 Log Set Assembly LOGS-NDI30 Models NDI30, NDI30-SPInstall the Log Assembly LOG #6LOG Log Set Assembly LOGS-NDI35 Models NDI35, NDI35-SP Log Set InstalledGrate Tine Slot NDI30 NDI35 Air Shutter SettingAir Shutter Settings Standing Pilot Ignition System TroubleshootingSymptom Possible Causes Corrective Action Troubleshooting Symptom Possible Cause Corrective ActionIntelliFire Ignition System Ues to spark, and main Reference Materials Appliance Dimension DiagramModel Dimensions Vent Kits Components Direct Vent Flex Liner KitsContact Information