Hearth and Home Technologies CFX-Crescent owner manual Hole & New Framing Members

Page 21

1.Cut the 9-inch by 9-inch hole.

2.Add the new framing members.

This shows a ceiling installation.

Drill a hole or drive a nail through this centerpoint.

Check the floor above for any obstructions, such as wiring or plumbing runs.

Reposition the fireplace and vent system, if necessary, to accommodate the ceiling joists and/or obstructions.

Cut a 9-inch x 9-inch (229mm x 229mm) hole through the ceiling, using the centerpoint previ- ously marked.

Frame the hole with framing lumber the same size as the ceiling joists.

9" (229 mm)

9" (229 mm)

 

 

CHIMNEY

 

HOLE

NEW

EXISTING CEILING

JOISTS

FRAMING

 

MEMBERS

 

CEILING

 

Figure 14 . 9”x 9” Hole & New Framing Members

If the area above the ceiling is NOT an attic, posi- tion and secure the ceiling firestop on the ceiling side of the previously cut and framed hole.

JOIST

CEILING

NAILS (4 REQUIRED)

CEILING FIRESTOP

Figure 15. Ceiling Firestop (Ceiling Side)

Heat & Glo • CFX-CRESCENT705-900 Rev. P • 12/07

21

Image 21
Contents Model CFX-Crescent Installation and OperationSafety and Warning Information Section Installing the Fireplace Table of ContentsApprovals and Codes Getting StartedCFX-Crescent Log Set AssemblyAt Depot Service Parts List CFX-CrescentPost 002182991 Valve Assembly Pre 002182991 Valve AssemblyHigh Altitude Installations Installation CodesApprovals and Codes CodesRequirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Diagram of the CFX-CRESCENT Locating the fireplace Installing the FireplaceClearance Requirements 66 5/8 33 1/4 47 1/8 19 5/8 35 1/2Step Framing Fireplace Framing DimensionsIdentifying Vent Components Vent System ApprovalsSL-45D SL-90D 17-24 11 3/4 Straight UP Venting with eight 8 90 Elbows Attaching the First Vent Component to the Starting Collars Attach the First Vent Component to the Starting Collars Continue Adding Vent Components Adding Venting Components Install Support BracketsInstalling Support Brackets 4. Install Firestops 10 Hole and Vent Pipe 9 Hole & New Framing Members Attic Firestop Vent Termination Trapezoid Termination Cap Vent Termination Minimum Clearances This also pertains to vertical vent systems installed Minimum Height from Roof to Lowest Discharge Opening Step Positioning Leveling, Securing Fireplace Step Gas Control SystemIntermittent Pilot Ignition IPI System Gas Supply Line Step Gas Supply LineIntermittent Pilot Ignition IPI Wiring Step Gas Pressure Requirements Wiring FireplacePressure Natural Gas Propane Appliance RequirementsWall Switch Optional AccessoriesWSK-MLT Sealant Material Hearth ExtensionsRemoving Glass Door Installing the TrimPositioning the Logs Save the log instructions with this manualPlacing the Ember Material and Lava Rock Double-check for faulty components Step Before Lighting Fireplace After InstallationDouble-check for gas leaks Double-check vent terminationsMaintaining and Servicing Your Fireplace Fireplace MaintenanceBurner Flame Patterns Contact Information