Hearth and Home Technologies CFX-Crescent Minimum Height from Roof to Lowest Discharge Opening

Page 26

1.Attach the flashing and apply sealant around the edges of the flashing base.

2.Attach the storm collar over the flash- ing joint and apply sealant between the storm collar and vertical pipe.

To seal the roof hole, and to divert rain and snow from the vent system:

Attach a flashing to the roof using nails, and use a non-hardening mastic around the edges of the flashing base where it meets the roof.

Attach a storm collar over the flashing joint to form a water-tight seal. Place non-hardening mastic around the joint, between the storm collar and the vertical pipe.

Slide the termination cap over the end of the vent pipe and rotate the pipe clockwise 1/4 turn.

 

 

HORIZONTAL

 

 

OVERHANG

2 FT.

2 FT. MIN.

VERTICAL

MIN.

 

 

WALL

 

LOWEST

 

 

 

DISCHARGE

 

TERMINATION

OPENING

 

 

 

CAP

 

 

 

 

X

 

 

12

 

 

ROOF PITCH

 

 

IS X/ 12

 

H (MIN.) - MINIMUM HEIGHT FROM ROOF

 

TO LOWEST DISCHARGE OPENING

Roof Pitch

H (min.) ft.

flat to 6/12

1.0

over 6/12 to 7/12

1.25

over 7/12 to 8/12

1.5

over 8/12 to 9/12

2.0

over 9/12 to 10/12

2.5

over 10/12 to 11/12

3.25

over 11/12 to 12/12

4.0

over 12/12 to 14/12

5.0

over 14/12 to 16/12

6.0

over 16/12 to 18/12

7.0

over 18/12 to 20/12

7.5

over 20/12 to 21/12

8.0

Figure 19. Minimum Height from Roof to Lowest Discharge Opening

26

Heat & Glo • CFX-CRESCENT705-900 Rev. P • 12/07

Image 26
Contents Installation and Operation Model CFX-CrescentSafety and Warning Information Approvals and Codes Table of ContentsSection Installing the Fireplace Getting StartedLog Set Assembly CFX-CrescentService Parts List CFX-Crescent At DepotPre 002182991 Valve Assembly Post 002182991 Valve AssemblyApprovals and Codes Installation CodesHigh Altitude Installations CodesInstallation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Diagram of the CFX-CRESCENT Clearance Requirements Installing the FireplaceLocating the fireplace 66 5/8 33 1/4 47 1/8 19 5/8 35 1/2Framing Dimensions Step Framing FireplaceVent System Approvals Identifying Vent ComponentsSL-45D SL-90D 17-24 11 3/4 Straight UP Venting with eight 8 90 Elbows Attach the First Vent Component to the Starting Collars Attaching the First Vent Component to the Starting CollarsAdding Venting Components Install Support Brackets Continue Adding Vent ComponentsInstalling Support Brackets 4. Install Firestops 10 Hole and Vent Pipe 9 Hole & New Framing Members Attic Firestop Vent Termination Trapezoid Termination Cap Vent Termination Minimum Clearances This also pertains to vertical vent systems installed Minimum Height from Roof to Lowest Discharge Opening Intermittent Pilot Ignition IPI System Step Positioning Leveling, Securing FireplaceStep Gas Control System Step Gas Supply Line Gas Supply LinePressure Natural Gas Propane Step Gas Pressure Requirements Wiring FireplaceIntermittent Pilot Ignition IPI Wiring Appliance RequirementsOptional Accessories Wall SwitchWSK-MLT Hearth Extensions Sealant MaterialInstalling the Trim Removing Glass DoorPlacing the Ember Material and Lava Rock Positioning the LogsSave the log instructions with this manual Double-check for gas leaks Step Before Lighting Fireplace After InstallationDouble-check for faulty components Double-check vent terminationsFireplace Maintenance Maintaining and Servicing Your FireplaceBurner Flame Patterns Contact Information