Hearth and Home Technologies CFX-Crescent This also pertains to vertical vent systems installed

Page 25

For Vertical Terminations - To locate the vent and install the vent sections:

• Locate and mark the vent centerpoint on the underside of the roof, and drive a nail through the centerpoint.

• Make the outline of the roof hole around the centerpoint nail.

• The size of the roof hole framing dimensions depend on the pitch of the roof. There MUST BE a 1-inch (25.4 mm) clearance from the vertical vent pipe to combustible materials.

• Mark the roof hole accordingly.

• Cover the opening of the installed vent pipes.

• Cut and frame the roof hole.

• Use framing lumber the same size as the roof rafters and install the frame securely. Flashing an- chored to the frame must withstand heavy winds.

• Continue to install concentric vent sections up through the roof hole (for inside vent installations) or up past the roof line until you reach the appro- priate distance above the roof (for outside termi- nations).

! WARNING

MAJOR U.S. BUILDING CODES SPECIFY MINIMUM CHIMNEY AND/OR VENT HEIGHT ABOVE THE ROOF TOP. THESE MINIMUM HEIGHTS ARE NECESSARY IN THE INTEREST OF SAFETY. SEE THE FOLLOWING DIAGRAM FOR MINIMUM HEIGHTS, PROVIDED THE TERMINATION CAP IS AT LEAST TWO (2) FEET FROM A VERTICAL WALL AND 2-FEET BELOW A HORIZONTAL OVERHANG.

NOTE:

This also pertains to vertical vent systems installed

on the outside of the building.

 

Heat & Glo • CFX-CRESCENT705-900 Rev. P • 12/07

25

Image 25
Contents Model CFX-Crescent Installation and OperationSafety and Warning Information Section Installing the Fireplace Table of ContentsApprovals and Codes Getting StartedCFX-Crescent Log Set AssemblyAt Depot Service Parts List CFX-CrescentPost 002182991 Valve Assembly Pre 002182991 Valve AssemblyHigh Altitude Installations Installation CodesApprovals and Codes CodesRequirements for the Commonwealth of Massachusetts Installation of Carbon Monoxide DetectorsGetting Started Diagram of the CFX-CRESCENT Locating the fireplace Installing the FireplaceClearance Requirements 66 5/8 33 1/4 47 1/8 19 5/8 35 1/2Step Framing Fireplace Framing DimensionsIdentifying Vent Components Vent System ApprovalsSL-45D SL-90D 17-24 11 3/4 Straight UP Venting with eight 8 90 Elbows Attaching the First Vent Component to the Starting Collars Attach the First Vent Component to the Starting CollarsContinue Adding Vent Components Adding Venting Components Install Support BracketsInstalling Support Brackets 4. Install Firestops 10 Hole and Vent Pipe 9 Hole & New Framing Members Attic Firestop Vent Termination Trapezoid Termination Cap Vent Termination Minimum Clearances This also pertains to vertical vent systems installed Minimum Height from Roof to Lowest Discharge Opening Step Gas Control System Step Positioning Leveling, Securing FireplaceIntermittent Pilot Ignition IPI System Gas Supply Line Step Gas Supply LineIntermittent Pilot Ignition IPI Wiring Step Gas Pressure Requirements Wiring FireplacePressure Natural Gas Propane Appliance RequirementsWall Switch Optional AccessoriesWSK-MLT Sealant Material Hearth ExtensionsRemoving Glass Door Installing the TrimSave the log instructions with this manual Positioning the LogsPlacing the Ember Material and Lava Rock Double-check for faulty components Step Before Lighting Fireplace After InstallationDouble-check for gas leaks Double-check vent terminationsMaintaining and Servicing Your Fireplace Fireplace MaintenanceBurner Flame Patterns Contact Information