Hearth and Home Technologies CFX-Crescent owner manual Pre 002182991 Valve Assembly

Page 6

Service Parts

CFX-Crescent

Valve Assembly Diagram/Parts List

Beginning Manufacturing Date: June 2000

 

Ending Manufacturing Date: ______

Î

Pre 002182991 Valve Assembly

 

Post 002182991 Valve Assembly

 

3

 

 

1

 

4

 

4

3

 

 

 

 

2

 

 

 

 

 

 

 

 

 

 

2

 

 

 

 

6

 

 

5

 

5

 

 

 

 

IMPORTANT THIS IS DATED INFORMATION: When Requesting service or replacement

 

Stocked

parts for your appliance please provide model number and serial number. All parts listed

 

in this manual may be ordered from an authorized dealer.

 

 

at Depot

ITEM

DESCRIPTION

PART NUMBER

 

 

 

Pre 002182991

Post 002182991

 

1

Pilot Assembly NG

N/A

385-510A

Y

Pilot Assembly LP

N/A

385-511A

Y

 

2

Burner Tube

570-302A

570-302A

Y

3

Valve NG

476-500

593-500

Y

Valve LP

476-500

593-501

Y

 

4

Flex Ball Valve Assembly

492-320A

492-320A

Y

5

Module

501-592

593-592

Y

6

Module Wire Assembly

N/A

593-590A

Y

 

Ignitor

501-591

N/A

Y

 

3 Volt Transformer

N/A

593-593A

Y

6

Heat & Glo • CFX-CRESCENT705-900 Rev. P • 12/07

Image 6
Contents Installation and Operation Model CFX-CrescentSafety and Warning Information Approvals and Codes Table of ContentsSection Installing the Fireplace Getting StartedLog Set Assembly CFX-CrescentService Parts List CFX-Crescent At DepotPre 002182991 Valve Assembly Post 002182991 Valve AssemblyApprovals and Codes Installation CodesHigh Altitude Installations CodesInstallation of Carbon Monoxide Detectors Requirements for the Commonwealth of MassachusettsGetting Started Diagram of the CFX-CRESCENT Clearance Requirements Installing the FireplaceLocating the fireplace 66 5/8 33 1/4 47 1/8 19 5/8 35 1/2Framing Dimensions Step Framing FireplaceVent System Approvals Identifying Vent ComponentsSL-45D SL-90D 17-24 11 3/4 Straight UP Venting with eight 8 90 Elbows Attach the First Vent Component to the Starting Collars Attaching the First Vent Component to the Starting CollarsAdding Venting Components Install Support Brackets Continue Adding Vent ComponentsInstalling Support Brackets 4. Install Firestops 10 Hole and Vent Pipe 9 Hole & New Framing Members Attic Firestop Vent Termination Trapezoid Termination Cap Vent Termination Minimum Clearances This also pertains to vertical vent systems installed Minimum Height from Roof to Lowest Discharge Opening Step Positioning Leveling, Securing Fireplace Step Gas Control SystemIntermittent Pilot Ignition IPI System Step Gas Supply Line Gas Supply LinePressure Natural Gas Propane Step Gas Pressure Requirements Wiring FireplaceIntermittent Pilot Ignition IPI Wiring Appliance RequirementsOptional Accessories Wall SwitchWSK-MLT Hearth Extensions Sealant MaterialInstalling the Trim Removing Glass DoorPositioning the Logs Save the log instructions with this manualPlacing the Ember Material and Lava Rock Double-check for gas leaks Step Before Lighting Fireplace After InstallationDouble-check for faulty components Double-check vent terminationsFireplace Maintenance Maintaining and Servicing Your FireplaceBurner Flame Patterns Contact Information