Hearth and Home Technologies CB4842MIR, CB4236MIR owner manual Mantel and Wall Projections, Mantels

Page 20

D. Mantel and Wall Projections

WARNING! Risk of Fire! Comply with all minimum clear- ances as specified. Framing or finishing material closer than the minimums listed must be constructed entirely of noncombustible materials (i.e., steel studs, concrete board, etc).

Mantels

30 in. minimum

to ceiling

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

16

17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

 

16

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

14

 

15-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

14-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

13-3/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11

 

13

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

12-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

9

 

 

11-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

8

 

 

 

10-3/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6

 

9-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5

8-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

7-3/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6-1/4

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

5 5-

 

1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Measured from top of hood (in inches)

 

 

 

 

Figure 5.3 Minimum Vertical and Maximum Horizontal Dimensions of Combustibles

Mantel Legs or Wall Projections

Top of

Appliance Drywall

A

B

Mantel Leg or

Perpendicular Wall

A1 in. (25 mm) min. to perpendicular wall

B3-1/2 in. (89 mm) min. from fireplace opening to perpendicular wall

Figure 5.4 Combustible Mantel Leg or Wall Projections (Acceptable on both sides of opening)

20

Heatilator • Caliber Mesh BV Series • 4040-848 Rev G • 10/08

Image 20
Contents Installation and Operation ModelsVent Gas Appliance What to do if you smell gasCongratulations Homeowner Reference InformationUser Guide Table of ContentsInstaller Guide Reference Materials Appliance SetupTroubleshooting Warranty Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityWarranty Listing and Code Approvals Your Fireplace Gas Fireplace SafetyOperating Instructions Fixed Glass Assembly Remote Controls, Wall Controls and Wall SwitchesFan Kit optional Clear SpaceFor Your Safety Read Before Lighting Lighting Instructions IPIAfter Fireplace is Lit Frequently Asked QuestionsInitial Break-in Procedure Maintenance and Service Maintenance Tasks-HomeownerMaintenance Tasks-Qualified Service Technician Getting Started Typical Appliance SystemInspect Appliance and Components Design and Installation ConsiderationsTools and Supplies Needed Negative Pressure Model # Framing and ClearancesSelecting Appliance Location Constructing the Appliance Chase Clearances Rough Opening Model Width Height DepthMantel Legs or Wall Projections Mantel and Wall ProjectionsMantels Gas Termination Termination LocationsVent Termination Minimum Clearances Vent System Configuration Vent Information and DiagramsVent Guidelines Vent Clearances and Framing Pipe Clearances to CombustiblesWall and Ceiling Penetration Framing Vertical Penetration FramingInstall Outside Air Kit Damper Assembly Appliance PreparationGas and Electrical Connections Secure and Level the ApplianceInstalling Vent Pipe Assembly of Vent SectionsInstall Attic Insulation Shield Secure Vent SectionsGas Information Fuel ConversionGas Pressure Gas ConnectionElectrical Information Wiring RequirementsOptional Accessories Requirements Junction Box Installation Wall Switch Installation for Fan OptionalFinishing Facing MaterialAppliance Setup Install the Log Assembly Glass AssemblyRemoving Glass Assembly Replacing Glass AssemblyInstall Trim Install Clean Face ComponentsInstall Hood Install Top Latch CoverAir Shutter Setting Install Floor CoverInstall Bottom Latch Cover Install Firescreen AssemblyTroubleshooting Intellifire Ignition SystemRange. Replace pilot if any damage is detected Appliance Dimension Diagram Reference MaterialsService Parts List CB4236MIRCB4842MIR IPI Valve Assembly Optional Components Model # Description This page intentionally left blank This page intentionally left blank Contact Information