Hearth and Home Technologies CB4236MIR, CB4842MIR Air Shutter Setting, Install Floor Cover

Page 33

Install Floor Cover

Install floor cover. See Figure 14.13. Floor cover must be installed with brake flange UP and going towards components with notched end to the left of the unit. Do not place cover on top of any components. Move components back if necessary.

When using the RCTS-MLT-HTL Remote for SIT Valve, the hand tab bend must be bent down for clearance of the solenoid.

Figure 14.13 Installing Floor Cover

Install Bottom Latch Cover

Insert bottom latch cover over existing shoulder screws. See Figure 14.14.

Push down till the tabs lock in place.

Figure 14.14 Installing Bottom Latch Cover

Install Firescreen Assembly

Thread screen onto screen rod making sure to thread all screen rings.

Hold the mesh firescreen in one hand until you get the rod inserted into the side columns to prevent the mesh from falling off the rod.

Insert one end of screen rod into the hole located in the column as far as it will go. See Figure 14.15

Figure 14.15 Insert Rod Into Side Columns

Flex the rod and insert it into the hole in the column on the other side.

Hook the center of the rod into the screen rod tabs (shown in Figure 14.10).

Spread firescreen to the edges of the firebox opening.

Hairpin clips are shipped in place in a hole in the bottom of each column. After the screen is in place, squeeze clips and remove from holes. Thread clip through screen (one on each side), squeeze slip and re-insert into holes.

Note: The floor cover in the bottom front of the fireplace may be covering the UL labels. It is loose and can be removed/ replaced.

L. Air Shutter Setting

Air shutter settings should be adjusted by a qualified installer at the time of installation. The air shutter is set at the factory for minimum vertical vent run. Adjust air shut- ter for longer vertical runs.

It takes 16 full turns of the shutter adjustment handle to move the air shutter from fully open to fully closed.

When the air shutter adjustment handle is all the way down, the air shutter is in the closed position.

NOTICE: If sooting occurs, provide more air by opening the air shutter.

Closed

Figure 14.16 Air Shutter

Heatilator • Caliber Mesh BV Series • 4040-848 Rev G • 10/08

33

Image 33
Contents Models Installation and OperationVent Gas Appliance What to do if you smell gasHomeowner Reference Information CongratulationsTable of Contents Installer GuideUser Guide Appliance Setup TroubleshootingReference Materials CONDITIONS, Exclusions & Limitation of Liability Warranty Hearth & Home Technologies Limited WarrantyWarranty Listing and Code Approvals Gas Fireplace Safety Operating InstructionsYour Fireplace Remote Controls, Wall Controls and Wall Switches Fixed Glass AssemblyFan Kit optional Clear SpaceLighting Instructions IPI For Your Safety Read Before LightingFrequently Asked Questions Initial Break-in ProcedureAfter Fireplace is Lit Maintenance Tasks-Homeowner Maintenance and ServiceMaintenance Tasks-Qualified Service Technician Typical Appliance System Getting StartedDesign and Installation Considerations Tools and Supplies NeededInspect Appliance and Components Negative Pressure Framing and Clearances Selecting Appliance LocationModel # Constructing the Appliance Chase Rough Opening Model Width Height Depth ClearancesMantel and Wall Projections MantelsMantel Legs or Wall Projections Termination Locations Vent Termination Minimum ClearancesGas Termination Vent Information and Diagrams Vent GuidelinesVent System Configuration Pipe Clearances to Combustibles Vent Clearances and FramingWall and Ceiling Penetration Framing Vertical Penetration FramingAppliance Preparation Install Outside Air Kit Damper AssemblyGas and Electrical Connections Secure and Level the ApplianceAssembly of Vent Sections Installing Vent PipeInstall Attic Insulation Shield Secure Vent SectionsFuel Conversion Gas InformationGas Pressure Gas ConnectionWiring Requirements Optional Accessories RequirementsElectrical Information Wall Switch Installation for Fan Optional Junction Box InstallationFacing Material FinishingAppliance Setup Glass Assembly Install the Log AssemblyRemoving Glass Assembly Replacing Glass AssemblyInstall Clean Face Components Install TrimInstall Hood Install Top Latch CoverInstall Floor Cover Air Shutter SettingInstall Bottom Latch Cover Install Firescreen AssemblyIntellifire Ignition System TroubleshootingRange. Replace pilot if any damage is detected Reference Materials Appliance Dimension DiagramCB4236MIR Service Parts ListCB4842MIR IPI Valve Assembly Optional Components Model # Description This page intentionally left blank This page intentionally left blank Contact Information