Hearth and Home Technologies RCOR-HVB-IPI, LCOR-HVB-IPI owner manual Venting with three 90 elbows

Page 26

 

 

NATURAL GAS

 

 

 

PROPANE

 

 

 

VENTING WITH THREE 90° ELBOWS

 

VENTING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 (FT.)

 

V + V1 (FT.)

H + H1 (FT.)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

6’ MIN. (1.83m)

12' MAX.

(3.6m)

 

 

V+ V1 + H + H1 = 50’ MAX. (15.2m)

 

V+ V1 + H + H1 = 50’ MAX. (15.2m)

 

 

H + H1 = 18’ MAX. (5.5m)

 

H + H1 = 12’ MAX. (3.6m)

V1

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

 

 

 

H1

 

 

 

 

 

 

 

 

 

 

H

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

H2

 

 

 

 

 

 

 

 

 

 

 

H1

 

 

 

 

 

 

 

 

 

H

 

 

NATURAL GAS

 

 

PROPANE

 

 

 

VENTING WITH THREE 90° ELBOWS

VENTING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 + H2 (FT.)

V + V1 (FT.)

 

H + H1 + H2 (FT.)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

1' MIN. (305mm)

 

2' MAX. (610mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

2' MIN. (610mm)

 

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

3' MIN. (914mm)

 

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

4' MIN. (1.22m)

 

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

5’ MIN. (1.5m)

 

10' MAX.

(3.0m)

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

6’ MIN. (1.83m)

 

12' MAX.

(3.6m)

 

 

V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)

V+ V1 + H + H1 + H2 = 50’ MAX. (15.2m)

 

 

H + H1 + H2 = 18’ MAX. (5.5m)

H + H1 + H2 = 12’ MAX. (3.6m)

 

 

Figure 18. Venting with three 90° elbows

 

 

 

 

 

 

 

 

 

26

 

 

 

 

 

Image 26
Contents ST-HVB-IPI LCOR-HVB-IPI RCOR-HVB-IPI What to do if you smell gasSafety and Warning Information Table of Contents Pier-HVB-IPI NG, LP Exploded Parts Diagram / Vue éclatée des pièces PIER-HVB-IPIST-HVB-IPI ST-HVB-IPI LCOR-HVB-IPI LCOR-HVB-IPI RCOR-HVB-IPI RCOR-HVB-IPI PIER-HVB-IPI, ST-HVB-IPI L&RCOR-HVB-IPI Appliance Certification Installation CodesHigh Altitude Installations CertificationANY Such Action MAY Possibly Cause a Fire Hazard Pre-install PreparationIntroducing the Heat & Glo Gas Fireplaces Diagram of the PIER-HVB-IPI Diagram of the ST-HVB-IPI Diagram of the LCOR-HVB-IPI and RCOR-HVB-IPI 121mmFraming the Fireplace Fireplace Dimensions and LocationsLocating the Fireplace Clearance RequirementsModel AT Each Joint Tems or Components MAY be Used Installing the Vent SystemVent System Approvals Identifying Vent ComponentsStraight OUT Straight UP Vertical VentingMAX .2 M Max. Run 24 610 mm Venting with One 90 Elbow Venting with Two 90 Elbows Venting with Two 90 Elbows Venting with three 90 elbows Venting with three 90 elbows Installing Vent Components Attach the First Vent Component to the Starting CollarsInstall Support Brackets Continue Adding Vent ComponentsAttic Firestop Positioned SO That the Arrow is Pointing UPVent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Securing of a Fireplace Positioning, Leveling, and Securing the FireplaceGas Control System Fireplace Junction BOX in a IPI SystemGas Supply Line Gas Pressure RequirementsAppliance Requirements Wiring the Fireplace For Intermittent Pilot Ignition WiringOperation using Battery Power Fan Wiring Diagram Optional Accessories Wall Switch Corner fan locationHearth Extensions FinishingANY Manner Installing Trim, Logs & Ember Material Using a 5/16 nut driver remove the two bolts see Figure Placing the Ember MaterialBefore Lighting the Fireplace After the InstallationDouble-check for faulty components Lighting the FireplaceFireplace Maintenance Important Turn OFF the GAS Before Servicing Your Fireplace