Hearth and Home Technologies LCOR-HVB-IPI, RCOR-HVB-IPI owner manual Venting with three 90 elbows

Page 27

 

H1

 

 

 

 

 

V1

 

 

 

 

 

 

V

 

 

H

 

 

NATURAL GAS

 

 

 

VENTING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 (FT.)

 

 

900 Elbow on top

2.5’ MAX. (64mm)

 

 

1' MIN. (305mm)

3' MAX. (914mm)

 

 

2' MIN. (610mm)

6' MAX.

(1.83m)

 

 

3' MIN. (914mm)

9' MAX.

(2.7m)

 

 

4' MIN. (1.22m)

12' MAX.

(3.6m)

 

 

5’ MIN. (1.5m)

15’ MAX.

(4.5m)

 

 

6’ MIN. (1.83m)

18’ MAX.

(5.5m)

 

 

V+ V1 + H + H1 = 50’ MAX. (15.2m)

 

 

H + H1 = 18’ MAX. (5.5m)

PROPANE

 

 

 

VENTING WITH THREE 90° ELBOWS

 

 

V + V1 (FT.)

H + H1 (FT.)

 

 

900 Elbow on top

2’ MAX. (610mm)

 

 

1' MIN. (305mm)

2' MAX. (610mm)

 

 

2' MIN. (610mm)

4' MAX.

(1.22m)

 

 

3' MIN. (914mm)

6’ MAX. (1.83m)

 

 

4' MIN. (1.22m)

8' MAX.

(2.4m)

 

 

5’ MIN. (1.5m)

10' MAX.

(3.0m)

 

 

6’ MIN. (1.83m)

12' MAX.

(3.6m)

 

 

V+ V1 + H + H1 = 50’ MAX. (15.2m)

V1

 

H + H1 = 12’ MAX. (3.6m)

H1

 

 

V

 

 

 

H

 

 

 

 

 

Figure 19. Venting with three 90° elbows

 

 

 

 

 

27

 

 

Image 27
Contents What to do if you smell gas ST-HVB-IPI LCOR-HVB-IPI RCOR-HVB-IPISafety and Warning Information Table of Contents Pier-HVB-IPI PIER-HVB-IPI NG, LP Exploded Parts Diagram / Vue éclatée des piècesST-HVB-IPI ST-HVB-IPI LCOR-HVB-IPI LCOR-HVB-IPI RCOR-HVB-IPI RCOR-HVB-IPI PIER-HVB-IPI, ST-HVB-IPI L&RCOR-HVB-IPI Certification Installation CodesHigh Altitude Installations Appliance CertificationPre-install Preparation Introducing the Heat & Glo Gas FireplacesANY Such Action MAY Possibly Cause a Fire Hazard Diagram of the PIER-HVB-IPI Diagram of the ST-HVB-IPI 121mm Diagram of the LCOR-HVB-IPI and RCOR-HVB-IPIClearance Requirements Fireplace Dimensions and LocationsLocating the Fireplace Framing the FireplaceModel AT Each Joint Identifying Vent Components Installing the Vent SystemVent System Approvals Tems or Components MAY be UsedMax. Run 24 610 mm Straight UP Vertical VentingMAX .2 M Straight OUTVenting with One 90 Elbow Venting with Two 90 Elbows Venting with Two 90 Elbows Venting with three 90 elbows Venting with three 90 elbows Attach the First Vent Component to the Starting Collars Installing Vent ComponentsContinue Adding Vent Components Install Support BracketsPositioned SO That the Arrow is Pointing UP Attic FirestopVent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Fireplace Junction BOX in a IPI System Positioning, Leveling, and Securing the FireplaceGas Control System Securing of a FireplaceGas Pressure Requirements Gas Supply LineWiring the Fireplace For Intermittent Pilot Ignition Wiring Operation using Battery PowerAppliance Requirements Corner fan location Fan Wiring Diagram Optional Accessories Wall SwitchFinishing ANY MannerHearth Extensions Installing Trim, Logs & Ember Material Placing the Ember Material Using a 5/16 nut driver remove the two bolts see FigureLighting the Fireplace After the InstallationDouble-check for faulty components Before Lighting the FireplaceImportant Turn OFF the GAS Before Servicing Your Fireplace Fireplace Maintenance