Hearth and Home Technologies RCOR-HVB-IPI, LCOR-HVB-IPI Installing Trim, Logs & Ember Material

Page 38

Step 10. Installing Trim, Logs & Ember Material

Installing the Trim

Combustible materials may be brought up to the specified clearances on the side and top front edges of the fireplace, but MUST NEVER overlap onto the front face. The joints between the finished wall and the fireplace top and sides can only be sealed with a 300° F. (149° C) minimum sealant.

WARNING: WHEN FINISHING THE FIREPLACE,

!NEVER OBSTRUCT OR MODIFY THE AIR INLET/ OUTLET GRILLES IN ANY MANNER.

Install optional marble and brass trim surround kits as desired. Marble, brass, brick, tile, or other non-combustible materials can be used to cover up the gap between combustible material (sheetrock or wood) and the fireplace.

Do not obstruct or modify the air inlet/outlet grilles. When overlapping on both sides, leave enough space so that the bottom grille can be lowered and the trim door removed.

Positioning the Logs

If the gas logs have been factory installed they should not need to be positioned. If the logs have been packaged separately, refer to the instructions that accompany the logs. Save the log instructions with this manual.

If sooting occurs, the logs might need to be repositioned slightly to avoid excessive flame impingement.

Shutter Settings

 

 

NG

LP

___________________________________________

PIER-HVB-IPI

3/8”

FULL OPEN

___________________________________________

ST-HVB-IPI

 

3/8”

FULL OPEN

___________________________________________

L&RCOR-HVB-IPI

3/8”

FULL OPEN

Glass Specifications

 

 

Model

Type

 

 

PIER-HVB-IPI

TEMPERED

 

 

ST-HVB-IPI

TEMPERED

 

 

L&RCOR-HVB-IPI

TEMPERED

 

 

Heat & Glo fireplaces manufactured with tempered glass may be installed in hazardous locations such as bathtub enclosures as defined by the CPSC. The tempered glass has been tested and certified to the requirements of ANSI Z97.1-1984 and CPSC 16 CFR 1202. (Safety Glazing Certi- fication Council SGCC # 1595 and 1597. Architectural Test- ing, Inc. Reports 02-31919.01 and 02-31917.01.)

This statement is in compliance with CPSC 16 CFR Sec- tion 1201.5 “Certification and labeling requirements” which refers to 15 USC 2063 stating “…Such certificate shall ac- company the product or shall otherwise be furnished to any distributor or retailer to whom the product is delivered.”

Some local building codes require the use of tempered glass with permanent marking in such locations. Glass meeting this requirement is available from the factory. Please con- tact your dealer or distributor to order.

Attachment of Lower Louver Assembly

This unit is shipped with the lower louver assembly attached midway up the glass frame to assist in the set-up of the unit. After the gas and electrical have been run, the louver can be moved to it’s lower position as shown in Figure 42.

SHOULDER

BOLT

LOWER

LOUVER

DOOR

Figure 42. Lower louver assembly

38

Image 38
Contents ST-HVB-IPI LCOR-HVB-IPI RCOR-HVB-IPI What to do if you smell gasSafety and Warning Information Table of Contents Pier-HVB-IPI NG, LP Exploded Parts Diagram / Vue éclatée des pièces PIER-HVB-IPIST-HVB-IPI ST-HVB-IPI LCOR-HVB-IPI LCOR-HVB-IPI RCOR-HVB-IPI RCOR-HVB-IPI PIER-HVB-IPI, ST-HVB-IPI L&RCOR-HVB-IPI Appliance Certification Installation CodesHigh Altitude Installations CertificationANY Such Action MAY Possibly Cause a Fire Hazard Pre-install PreparationIntroducing the Heat & Glo Gas Fireplaces Diagram of the PIER-HVB-IPI Diagram of the ST-HVB-IPI Diagram of the LCOR-HVB-IPI and RCOR-HVB-IPI 121mmFraming the Fireplace Fireplace Dimensions and LocationsLocating the Fireplace Clearance RequirementsModel AT Each Joint Tems or Components MAY be Used Installing the Vent SystemVent System Approvals Identifying Vent ComponentsStraight OUT Straight UP Vertical VentingMAX .2 M Max. Run 24 610 mmVenting with One 90 Elbow Venting with Two 90 Elbows Venting with Two 90 Elbows Venting with three 90 elbows Venting with three 90 elbows Installing Vent Components Attach the First Vent Component to the Starting CollarsInstall Support Brackets Continue Adding Vent ComponentsAttic Firestop Positioned SO That the Arrow is Pointing UPVent Termination Minimum Clearances Minimum Height from Roof to Lowest Discharge Opening Securing of a Fireplace Positioning, Leveling, and Securing the FireplaceGas Control System Fireplace Junction BOX in a IPI SystemGas Supply Line Gas Pressure Requirements Appliance Requirements Wiring the Fireplace For Intermittent Pilot Ignition Wiring Operation using Battery Power Fan Wiring Diagram Optional Accessories Wall Switch Corner fan locationHearth Extensions FinishingANY Manner Installing Trim, Logs & Ember Material Using a 5/16 nut driver remove the two bolts see Figure Placing the Ember MaterialBefore Lighting the Fireplace After the InstallationDouble-check for faulty components Lighting the FireplaceFireplace Maintenance Important Turn OFF the GAS Before Servicing Your Fireplace