Hearth and Home Technologies 4100I-NL-B warranty Chimney Requirements, Firestopping, Insulation

Page 8

R

4100-I ACT WOOD INSERT

CHIMNEY REQUIREMENTS

A chimney must be the required height above the roof or other obstruction for safety and for proper draft oper- ation. The requirement is that the chimney must be at least 3 feet (91cm) higher than the highest point where it passes through the roof, and at least 2 feet (61cm) higher than the highest part of the roof or structure that is within10 feet (305cm) of the chimney, measured hori- zontally. Refer to Figure 8C.

OVALIZING ROUND STAINLESS STEEL

LINERS

Ovalizing round stainless steel liners to accommodate the liner passing through the damper region of a fire- place is an allowable and acceptable practice.

Ensure that the ovalization is minimized to the extent required to fit through the damper.

Figure 8A

Firestopping

Figure 8C

Non-Combustible

Firestopping

Material

2 inch (51mm)

Floor

(second Story)

Floor

Ceiling

Caulk

Minimum 1 inch (25mm) clearance from exterior chimney to sheathing

CHIMNEY HEIGHT

At least  ft

(91cm)

10 ft

(05cm)

At least 2 ft

(61cm)

Figure 8B

Figure 8D

Minimum 2 inch (51mm) clearance from combustible material

and insulation

ceiling

Non-combustible fire stopping material

CHIMNEY TOp VIEW

1/2" (12.7mm) airspace

FLUE

5/8" (16mm) Fireclay Flue Liner

Chimney Wall

4" (102mm)

Nominal

Foundation

Page

250-7201E

September 1, 2008

Image 8
Contents Advanced Combustion Technology ACT Hot glass will cause burnsSerial Number 007Model Name Location Back side of left side panelTable of Contents TOP View Side ViewFront View Panel SizeSideWall See Alternative Floor Protection Worksheet onInstallation recommendations Rule A. These are safety requirements and areListings Chimney HEIGHT/DRAFTThermal Conductivity k value Thermal Resistance R valueConverting k to R Converting R to kChimney Requirements Ovalizing Round Stainless Steel LinersFirestopping InsulationInstalling Outside Air USA onlyInstallation Options Installation Into Masonry FireplaceInstallation Into a Factory Built Zero Clearance Fireplace Factory-built zero clearance fireplaceInstallation in Canada Adjusting the Leveling BoltsLeveling Bolts and sheet metal shims Sheet Metal GuidesOutside AIR Installation Re-install plateSecuring Liner to Chimney Ring Zero Clearance Fireplace Outside AIR Must be Turned to onPanel SET and Cast Trim SET Panel and Cast Trim must be ordered separatelyPanel and Gold Trim SET Completed ViewBlower Cord Location & Blower Control BOX with Switch Door Latch Adjustment Zero Clearance Adjustable Trim SupportDoor Handle Assembly Operation Operating Tips Burn RatesOpacity BTU / Hr Start-Up Air Control Primary ControlBurning Process Maintenance Replace with 5mm ceramic glass onlyBrick replacement instructions Baffle Removal & InstallationDescription Exploded ViewsCeramic Blanket Service Parts and Accessories Part Description Alphabetical Order Date of Service Performed By Description of Service Hearth & Home Technologies Limited Warranty CONDITIONS, Exclusions & Limitation of LiabilityHearth & Home Technologies Limited Warranty Cont’d Where Purchased Serial Number Date Purchased Date InstalledACT Wood Insert Telephone