Hearth and Home Technologies 4100I-GD-B, 4100I-NL-B warranty USA only, Installing Outside Air

Page 9

R

4100-I ACT WOOD INSERT

INSTALLATIONS INTO ZERO CLEARANCE

FIREPLACES IN MOBILE HOMES

(IN USA ONLY)

1.An outside air inlet must be provided for combustion and must remain clear of leaves, debris, ice and/or snow. It must be unrestricted while unit is in use to prevent room air starvation which can cause smoke spillage and an inability to maintain a fire. Smoke spillage can also set off smoke alarms.

2.Unit must be secured to the mobile home structure. Remove bolts from each side of insert and use plumbers tape to secure to structure (a washer may be required). Re-install bolts.

3.Unit must be grounded with #8 solid copper grounding wire or equivalent and terminated at each end with N.E.C. approved grounding device.

4.The factory-built fireplace must meet (UM)84-HUD requirements for outside combustion air supply to the fireplace fire chamber and the chimney must be listed to UL03 HT or a listed UL-1777 full length six inch (152mm) diameter liner must be used. It must be equipped with a spark arrestor cap and the outside air must be installed on the insert. (See Figure 9A and installation instructions of page 13.)

5.Refer to page 5 of this manual or the serial number/safety label for clearances to combustibles. The label is located on a beaded chain on the left side behind outer skin.

6.Floor protections requirements on page 5 must be followed precisely.

 

Spark Arestor Cap

Storm Collar

 

 

Roof Flashing

Joist Shield/Firestop

Double Wall

 

 

Connector Pipe

 

1. Remove plate

2. Re-install plate

 

Figure 9A - Installing Outside Air

7.Use silicone to create an effective vapor barrier at the location were the chimney or other component penetrates to the exterior of the structure.

8.Follow the chimney and chimney connector manufacturer’s instructions when installing the flue system for use in a mobile home.

NOTE: Offsets from the vertical, not exceeding 45°, are allowed per Section 905(a) of the Uniform Mechanical Code (UMC). Offsets greater than 45° are considered horizontal and are also allowed, providing the horizontal run does not exceed 75% of the vertical height of the vent. Construction, clearance and termination must be in compliance with the UMC Table 9C. This installation must also complies with NFPA 211.

NOTE: Top sections of chimney must be removable to allow maximum clearance of 13.5 ft. (405cm) from ground level for transportation purposes.

9.Burn wood only. Other types of fuels may generate poisonous gases (e.g., carbon monoxide).

CAUTION:

THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED. (i.e., DO NOT CUT THROUGH FLOOR JOIST, WALL STUD,

CEILING TRUSS, ETC.)

WARNING: DO NOT INSTALL IN SLEEPING ROOM.

WARNING: NEVER DRAW COMBUSTION AIR FROM A WALL, FLOOR OR CEILING CAVITY OR FROM ANY ENCLOSED SPACE SUCH AS AN ATTIC OR GARAGE.

September 1, 2008

250-7201E

Page

Image 9
Contents Hot glass will cause burns Advanced Combustion Technology ACT007 Serial NumberModel Name Location Back side of left side panelTable of Contents Side View TOP ViewFront View Panel SizeSee Alternative Floor Protection Worksheet on SideWallRule A. These are safety requirements and are Installation recommendationsListings Chimney HEIGHT/DRAFTThermal Resistance R value Thermal Conductivity k valueConverting k to R Converting R to kOvalizing Round Stainless Steel Liners Chimney RequirementsFirestopping InsulationUSA only Installing Outside AirInstallation Into Masonry Fireplace Installation OptionsFactory-built zero clearance fireplace Installation Into a Factory Built Zero Clearance FireplaceAdjusting the Leveling Bolts Installation in CanadaLeveling Bolts and sheet metal shims Sheet Metal GuidesRe-install plate Outside AIR InstallationSecuring Liner to Chimney Ring Zero Clearance Fireplace Outside AIR Must be Turned to onPanel and Cast Trim must be ordered separately Panel SET and Cast Trim SETPanel and Gold Trim SET Completed ViewBlower Cord Location & Blower Control BOX with Switch Zero Clearance Adjustable Trim Support Door Handle AssemblyDoor Latch Adjustment Operation Burn Rates Operating TipsOpacity BTU / Hr Start-Up Air Control Primary ControlBurning Process Replace with 5mm ceramic glass only MaintenanceBaffle Removal & Installation Brick replacement instructionsExploded Views Ceramic BlanketDescription Service Parts and Accessories Part Description Alphabetical Order Date of Service Performed By Description of Service CONDITIONS, Exclusions & Limitation of Liability Hearth & Home Technologies Limited WarrantyHearth & Home Technologies Limited Warranty Cont’d Serial Number Date Purchased Date Installed Where PurchasedACT Wood Insert Telephone