Hearth and Home Technologies 4100I-GD-B Securing Liner to Chimney Ring, Outside AIR Installation

Page 13

R

4100-I ACT WOOD INSERT

SECURING LINER TO CHIMNEY RING

There are two options to secure the liner to the chim- ney ring: See Figure 13A.

Option One: If there is enough room on the top of the insert to work, hand bend the two tabs upward 90°. Secure the liner with the supplied hex head bolts 1/4- 20-3/4.

Option Two: Remove the manifold tubes, fiberboard baffle and ceramic blanket. From inside the firebox, pull liner down through the chimney ring below the outer skin. There are two pre-drilled holes in the chim- ney ring 180° apart. Secure the liner with the supplied hex head bolts 1/4-20-3/4.

NOTE: Tabs are shipped from factory in a flat position. Bend upwards 90 degrees.

2 pre-drilled holes on chimney ring under outer skin (access through firebox)

Figure 13A

OUTSIDE AIR INSTALLATION

IMPORTANT!

THE ZERO CLEARANCE

FIREPLACE OUTSIDE AIR MUST BE TURNED TO “ON”

1. Remove plate

2. Re-install plate

Figure 13B

Tools Needed: Phillips Head Screwdriver

1.Remove three screws and cover plate from back side of insert. Save the screws.

2.Re-attach the cover plate using the same screws to front side of the insert as shown in Figure 13B.

3.Repeat same procedure for other side of insert.

NOTE: This insert requires replacement of combustion air. If your home is fairly air-tight, it is recommended that you install outside air. If you are installing into a Mobile Home, outside air is required. See page 9.

September 1, 2008

250-7201E

Page 13

Image 13
Contents Hot glass will cause burns Advanced Combustion Technology ACT007 Serial NumberModel Name Location Back side of left side panelTable of Contents Side View TOP ViewFront View Panel SizeSee Alternative Floor Protection Worksheet on SideWallRule A. These are safety requirements and are Installation recommendationsListings Chimney HEIGHT/DRAFTThermal Resistance R value Thermal Conductivity k valueConverting k to R Converting R to kOvalizing Round Stainless Steel Liners Chimney RequirementsFirestopping InsulationUSA only Installing Outside AirInstallation Into Masonry Fireplace Installation OptionsFactory-built zero clearance fireplace Installation Into a Factory Built Zero Clearance FireplaceAdjusting the Leveling Bolts Installation in CanadaLeveling Bolts and sheet metal shims Sheet Metal GuidesRe-install plate Outside AIR InstallationSecuring Liner to Chimney Ring Zero Clearance Fireplace Outside AIR Must be Turned to onPanel and Cast Trim must be ordered separately Panel SET and Cast Trim SETPanel and Gold Trim SET Completed ViewBlower Cord Location & Blower Control BOX with Switch Door Handle Assembly Zero Clearance Adjustable Trim SupportDoor Latch Adjustment Operation Burn Rates Operating TipsOpacity BTU / Hr Start-Up Air Control Primary ControlBurning Process Replace with 5mm ceramic glass only MaintenanceBaffle Removal & Installation Brick replacement instructionsCeramic Blanket Exploded ViewsDescription Service Parts and Accessories Part Description Alphabetical Order Date of Service Performed By Description of Service CONDITIONS, Exclusions & Limitation of Liability Hearth & Home Technologies Limited WarrantyHearth & Home Technologies Limited Warranty Cont’d Serial Number Date Purchased Date Installed Where PurchasedACT Wood Insert Telephone