Baxi Potterton 47-393-39 Plume Outlet Elbow, General Fitting Notes, Supplied, Connect vertically

Page 29

Plume Outlet

Fig. 34

Fig. 35

Elbow

 

9.0

 

Plume Displacement

 

 

 

 

 

 

 

 

 

 

9.3

 

General Fitting Notes (cont.)

15. For aesthetic purposes it is permissible to route the

60Ø exhaust in an enclosed box, but the air inlet and

plume outlet MUST remain in free air.

16. It is also possible to separate the plume outlet from the

93° elbow to allow the flue to be installed as shown in

Fig. 34.

 

 

17. To do this, first slacken the two screws retaining the

plume outlet to the elbow, and remove the outlet (Fig. 35).

The elbow can now be used to connect the vertical to

horizontal 60Ø exhaust (Fig. 34). Retighten the screws in

the elbow.

18. The outlet can now be fitted into the female end of an

60Ø extension piece. It must be secured using two of the

screws supplied in the bag with the ‘Jubilee’ clip.

19. Mark the female end of the extension at 30mm as

shown in two positions, directly opposite each other

(Fig. 36).

 

 

30mm

Fig. 36

200mm Min.

Fig. 37

20.

Using a suitable bit (e.g. 2mm), drill through the

extension and outlet. Secure using two of the screws

supplied.

21.

The remaining screw must be used to secure the

adaptor to the concentric terminal.

22.

When the plume outlet is positioned under a balcony

or other projection (Fig. 37) it must protrude at least

200mm (it is not necessary to extend it further than this).

23.

When under balconies or projections it is permissible to

rotate the concentric flue length up to 70°, clockwise or

anti-clockwise (Fig. 38), if there is insufficient space to

connect vertically.

24.This will allow the connection of the exhaust to the outlet spigot.

25.All other minimum & maximum dimensions must be adhered to, and the air inlet positioned such that it will not be subject to rain entry.

70°

Outlet Spigot

Concentric Flue Length (shown end-on)

© Baxi Heating UK Ltd 2012

Fig. 38

29

 

Image 29 Contents
Installation & Service Instructions Potterton Titanium Natural GasScheme Members only Installer Notification GuidelinesCodes of Practice refer to the most recent version Important Installation, Commissioning, Service & RepairLegislation General Safe Manual HandlingPreparation TechniqueContents Description Contents of PackIntroduction General Layout Domestic Hot Water Mode Light DisplayLayout Expansion Vessel Automatic Air VentDomestic Hot Water Mode Fig Central Heating Mode FigFrost Protection Mode Appliance OperationTitanium 24, 28, 33 Technical DataOrientation Dimensions and FixingsTap Rail 32.5 mm Condensate Drain 65 mm 22mm 15mmInformation System DetailsCentral Heating Circuit BypassPressure Relief Valve Fig System Filling and Pressurising FigExpansion Vessel Central Heating only Hard Water Areas Domestic Hot Water Circuit FigShowers At Least 1.5 7.2 Clearances Figs Site RequirementsLocation Ventilation of Compartments Site RequirementGas Supply Electrical SupplyCondensate Drain 500mm min 50mm perMinimum fall RunBoiler External runs & those InsulationFlue Flue Options Each fitting to aid assemblyHorizontal Flue Systems Horizontal FluesTwin & Vertical Flue Systems Vertical Flues120mm Min ApartTelescopic Internal Flue Kit Flue AccessoriesKey Accessory Size Code No Air Duct Connection Flue Duct Connection Boiler Adaptor Twin Flue Duct AdaptorTwin Flue Connection For Roof Terminals Flue Dimensions Flue Trim Terminal Guard FigPlume Displacement Kit Fig Plume DisplacementElbow/Plume Outlet Assembly Ring BracketDetermining Permissible Lengths 28/33/40Example Example Flue Lengths OK30mm General Fitting Notes60Ø extension piece. It must be secured using two Elbow to allow the flue to be installed as shownUsing a suitable bit e.g mm, drill through Extension and outlet. Secure using two of the screwsUnpacking & Initial Preparation InstallationFlushing After considering the site requirementsFitting the Filling Loop Kit Condensate Drain see section Fitting The BoilerFitting the Pressure Relief Discharge Pipe Fig Wall Thickness Flue Elbow Fitting The FlueEnsure Elbow is fully engaged into Boiler Adaptor Wall Thickness Waste FlueEnsure Extension is fully engaged into Boiler Adaptor Inner Flue Support Bracket25mm Extension Cut End Preliminary Electrical Checks Making The Electrical ConnectionsCommissioning Selector Switch DisplayCommissioning the Boiler Screw Pump Automatic Air VentPressure Setting the Timer Case Front Panel Facia Panel CompletionCompletion Annual Servicing Inspection Servicing13 .1 Annual Servicing Viewing Window 10 ±1Burner Sensing Electrode Spark and Sensing Electrodes Fig Changing ComponentsIgniter Fig Venturi Fig Fan FigInjector Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorBurner Gasket Extension Piece Burner FigInsulation Fig Safety Thermostat Fig Central Heating Temperature Sensor NTC FigDHW Temperature Sensor NTC Fig Flue/Heat Exchanger Thermostat Sensor FigAutomatic Air Vent Fig Pump Head Only FigPump Complete Fig Hall Effect Sensor Fig Pressure Gauge FigsPlate Heat Exchanger Fig Diverter Valve Motor Unit & Assembly Fig14.22 P.C.B. Fig Selector Switch FigExpansion Vessel Fig Throttle Adjustment ScrewGas Valve Fig Setting the Gas Valve CO2 check Setting the Gas ValveFlue Adaptor Test Point Plug Analyser Probe ThrottleElectrical Illustrated Wiring DiagramShort Parts List Short Parts List306 302Error Codes Fault FindingInitial Fault Finding Checks Go to section ‘A’ Turn the selector switch to Error 133 flashingReset position for 5 seconds Pump runsError 133 flashing Go to section ‘I’ Turn selector switch toTurn Domestic Hot Water Open DHW tap fullySwitch terminal PCB X3 connector terminals 3Fan jammed or faulty winding Replace PCB Replace waterReplace sensor or PCB E28 Check wiring Viewing WindowGas at burner Replace gas valveReplace sensor Replace safety thermostatReplace PCB Is there 230V at Page Page GAS Boiler System Commissioning Checklist Service Record Potterton