Baxi Potterton 47-393-40, 47-393-39 Commissioning the Boiler, Screw Pump Automatic Air Vent

Page 36

Screw

Pump

Automatic Air

Vent

Fig. 59

Pump

2

 

 

 

 

 

1

3

 

 

 

 

 

 

 

 

 

 

 

 

0

4

 

 

 

 

 

 

bar

 

 

 

 

 

Selector Switch

 

 

 

 

 

 

 

Display

Fig. 60

Pressure Gauge

 

 

 

 

 

 

 

 

 

 

2

 

1

12

 

 

 

 

3

 

 

11

 

 

 

 

4

 

 

 

10

Reset

 

2

5

 

 

 

9

 

 

PM

 

 

 

 

 

 

3

 

 

 

8

 

 

7

 

 

 

7

 

 

 

8

 

 

 

AM

 

 

￿0 4

9

 

 

0

5

 

 

bar

10

 

 

 

4

 

 

 

11

 

 

3

 

 

 

 

12

1

 

2

 

 

Central Heating

Domestic Hot Water

 

 

 

 

 

Temperature Control

Temperature Control

 

 

 

 

Fig. 61

11.0Commissioning

11.1Commissioning the Boiler

1.Reference should be made to BS:EN 12828 & 14336 when commissioning the boiler.

2.At the time of commissioning, complete all relevant sections of the Benchmark Checklist at the rear of this publications.

3.Open the mains water supply to the boiler.

4.Open all hot water taps to purge the DHW system.

5.Ensure that the filling loop is connected and open, then open the heating flow and return valves on the boiler.

6.Open the screw on the automatic air vent on the pump body (Fig. 59).

IMPORTANT: If the boiler is installed at a high point in the system it is strongly recommended that Automatic Air Vent Kit 720004701 is fitted. Ensure that this vent is open.

7.The system must be flushed in accordance with BS 7593 (see Section 6.2) and the flushing agent manufacturers instructions.

8.Pressurise the system to 1.5 bar (Fig. 60) then close and disconnect the filling loop.

9.Turn the gas supply on and purge according to in GB BS 6891 and in IE I.S. 813 “Domestic Gas Installations”.

10.Test for gas tightness.

11.Hinge the facia panel upwards and refit the case front panel. Tighten the securing screws.

IMPORTANT: The combustion for this appliance has been checked, adjusted and preset at the factory for operation on the gas type specified on the appliance data plate. No measurement of the combustion is necessary. Do not adjust the air/gas ratio valve.

12. Having checked:

That the boiler has been installed in accordance with these instructions.

The integrity of the flue system and the flue seals.

The integrity of the boiler combustion circuit and the relevant seals.

Proceed to put the boiler into operation as follows:

36© Baxi Heating UK Ltd 2012

Image 36
Contents Installation & Service Instructions Natural Gas Potterton TitaniumInstaller Notification Guidelines Scheme Members onlyImportant Installation, Commissioning, Service & Repair LegislationCodes of Practice refer to the most recent version Safe Manual Handling GeneralPreparation TechniqueContents Contents of Pack IntroductionDescription Domestic Hot Water Mode Light Display General LayoutLayout Expansion Vessel Automatic Air VentCentral Heating Mode Fig Domestic Hot Water Mode FigFrost Protection Mode Appliance OperationTechnical Data Titanium 24, 28, 33Dimensions and Fixings OrientationTap Rail 32.5 mm Condensate Drain 65 mm 22mm 15mmSystem Details InformationCentral Heating Circuit BypassSystem Filling and Pressurising Fig Expansion Vessel Central Heating onlyPressure Relief Valve Fig Domestic Hot Water Circuit Fig ShowersHard Water Areas Site Requirements LocationAt Least 1.5 7.2 Clearances Figs Site Requirement Ventilation of CompartmentsGas Supply Electrical SupplyCondensate Drain 50mm per 500mm minRun Minimum fallBoiler External runs & those InsulationFlue Each fitting to aid assembly Flue OptionsHorizontal Flue Systems Horizontal FluesVertical Flues Twin & Vertical Flue Systems120mm Min ApartFlue Accessories Key Accessory Size Code NoTelescopic Internal Flue Kit Twin Flue Duct Adaptor Twin Flue ConnectionAir Duct Connection Flue Duct Connection Boiler Adaptor Flue Dimensions For Roof TerminalsFlue Trim Terminal Guard FigPlume Displacement Plume Displacement Kit FigElbow/Plume Outlet Assembly Ring Bracket28/33/40 Determining Permissible LengthsExample Example Flue Lengths OKGeneral Fitting Notes 30mmElbow to allow the flue to be installed as shown 60Ø extension piece. It must be secured using twoUsing a suitable bit e.g mm, drill through Extension and outlet. Secure using two of the screwsInstallation Unpacking & Initial PreparationFlushing After considering the site requirementsFitting the Filling Loop Kit Fitting The Boiler Fitting the Pressure Relief Discharge Pipe FigCondensate Drain see section Fitting The Flue Wall Thickness Flue ElbowEnsure Elbow is fully engaged into Boiler Adaptor Wall Thickness Waste FlueInner Flue Support Bracket 25mm Extension Cut EndEnsure Extension is fully engaged into Boiler Adaptor Making The Electrical Connections Preliminary Electrical ChecksSelector Switch Display CommissioningCommissioning the Boiler Screw Pump Automatic Air VentPressure Setting the Timer Completion CompletionCase Front Panel Facia Panel Servicing 13 .1 Annual ServicingAnnual Servicing Inspection 10 ±1 Burner Sensing ElectrodeViewing Window Changing Components Igniter FigSpark and Sensing Electrodes Fig Fan Fig Venturi FigInjector Fig Gasket Venturi Injector Cover Gas Inlet Pipe Fan CollectorBurner Fig Insulation FigBurner Gasket Extension Piece Central Heating Temperature Sensor NTC Fig Safety Thermostat FigDHW Temperature Sensor NTC Fig Flue/Heat Exchanger Thermostat Sensor FigPump Head Only Fig Pump Complete FigAutomatic Air Vent Fig Pressure Gauge Figs Hall Effect Sensor FigDiverter Valve Motor Unit & Assembly Fig Plate Heat Exchanger FigSelector Switch Fig 14.22 P.C.B. FigThrottle Adjustment Screw Gas Valve FigExpansion Vessel Fig Setting the Gas Valve Setting the Gas Valve CO2 checkFlue Adaptor Test Point Plug Analyser Probe ThrottleIllustrated Wiring Diagram ElectricalShort Parts List Short Parts List306 302Fault Finding Initial Fault Finding ChecksError Codes Error 133 flashing Go to section ‘A’ Turn the selector switch toReset position for 5 seconds Pump runsTurn selector switch to Error 133 flashing Go to section ‘I’Turn Domestic Hot Water Open DHW tap fullyPCB X3 connector terminals 3 Switch terminalFan jammed or faulty winding Replace PCB Replace waterCheck wiring Viewing Window Replace sensor or PCB E28Gas at burner Replace gas valveReplace safety thermostat Replace PCB Is there 230V atReplace sensor Page Page GAS Boiler System Commissioning Checklist Service Record Potterton

47-393-40, 47-393-41, 47-393-39, 47-393-42 specifications

The Baxi Potterton 47-393-42, 47-393-39, 47-393-41, and 47-393-40 are models of high-efficiency gas boilers designed for residential heating. These models are well-known for their reliability, advanced technology, and user-friendly features, making them a popular choice among homeowners looking to improve their heating systems.

One of the standout features of these models is their energy efficiency. Each unit is engineered to comply with stringent energy-saving regulations, significantly reducing utility bills while maintaining optimal heating performance. They are rated with impressive efficiency ratings, which can lead to long-term savings and a reduced carbon footprint.

The Baxi Potterton range employs a heat exchanger system designed to maximize heat transfer and minimize energy waste. This sophisticated technology ensures that the boiler operates at peak efficiency, providing ample heating for homes even in the coldest months. The use of a durable, high-quality heat exchanger material contributes to the longevity of the unit, reducing the need for frequent repairs or replacements.

Ease of use is another hallmark of the 47-393 series. With an intuitive digital display, users can effortlessly monitor and adjust settings as required. The controls are straightforward, allowing for quick temperature adjustments, system diagnostics, and alerts, creating a hassle-free experience for homeowners.

Safety features are inherent in these models, including built-in safeguards against overheating and pressure fluctuations. The automatic shut-off mechanism ensures that the boiler operates within safe parameters, providing peace of mind to users.

Furthermore, maintenance is simplified with the easy access design. The accessible components make it straightforward for service technicians to perform routine checks and repairs. Regular maintenance is essential for sustaining high performance and extending the lifespan of the boiler.

In conclusion, the Baxi Potterton 47-393-42, 47-393-39, 47-393-41, and 47-393-40 models represent a blend of efficiency, safety, and convenience. Their advanced technologies and features not only enhance the user experience but also contribute to more sustainable heating solutions for homes. Investing in one of these advanced boilers ensures reliable performance, lower energy costs, and a commitment to environmental responsibility.