Installation of Unit
Preparationofinstallationpartsandtools
No. | Installation Parts, Tools | Use |
|
|
|
1 | Flaring tool (Ø 6.35 - Ø 19.05) | Flaring the pipes |
|
|
|
2 | Remear | Remove burrs from cut edges of pipes. |
|
|
|
3 | Pipe cutter (MAX 35mm Copper pipe) | Cutting the pipings |
|
|
|
4 | Wrench (H5, H4 hexagonal wrench) | To open the service valve |
|
|
|
5 | Pipe bender | Bending the pipings |
|
|
|
6 | Leak detector | Check a |
|
| of the pipings |
|
|
|
7 | Manifold gauge | To measure the pressure, to charge the refrigerant |
|
|
|
8 | To connect the bombe | |
|
|
|
9 | Vacuum pump | To remove the air in the pipe. |
|
|
|
10 | Charge cylinder balance | To measure the refrigerant amount |
|
|
|
11 | Bombe | Gas charge |
|
| Cleaning the pipe |
|
|
|
12 | Spanner | To tighten the connecting parts of the pipings |
13Monkey spanner
14Driver( , )
15 | Benchi (150mm) | Cutting the wires |
|
|
|
16 | Tapeline | To measure the length |
|
|
|
17 | Core drill | To make holes through the concrete wall and blocks |
|
|
|
18 | Voltmeter, Amperemeter, Clampmeter | To measure the current and voltage |
|
|
|
19 | Insulation resistance tester | To measure the insulation resistance |
|
|
|
20 | Glass thermometer | To measure the intake and outlet air temperature of the indoor unit |
|
|
|
21 | Copper tubes | To use the connecting pipings |
|
|
|
22 | Insulation material | To cover the connecting pipings |
|
|
|
23 | Tape | To finish the connecting pipings |
|
|
|
24 | Electrical Leakage Breaker | To shut off the main power |
|
|
|
25 | Cable | To connect the cable from outdoor unit to indoor unit |
|
|
|
26 | Drain hose sockets, elbows | To remote the condensing water |
ENGLISH
Installation Manual 11