LG Electronics 3828A20025U manual Connection of piping, Precautions in bending

Page 14

Installation of Unit

Connectionofpiping

1.Move the indoor tubing and drain hose to the hole

Remove tubing holder and pull the tubing out of the chassis.

2.Replace the tubing holder into original position

3.Route the tubing and the drain hose staight backwards.

4.Insert the connecting cable into the indoor unit through the hole.

Do not connect the cable to the indoor unit

Make a small loop with the cable for easy connection later.

5.Tape the tubing and the connecting cable.

6.Indoor unit installation.

7.Connecting the pipings to the indoor unit.

ENGLISH

Align the center of the pipings and suffciently tighten the flare nut with fingers.

Finally, tighten the flare nut with troque wrench until the wrench clicks.

When tightening the flare nut with troque wrench, ensure the direction for tightening follows the arrow on the wrench.

PIPE SIZE

TORQUE

1/4"

1.8~2.5 kgf.m

3/8"

3.4~4.2 kgf.m

1/2"

5.5~6.6 kgf.m

5/8"

6.3~8.2 kgf.m

3/4"

9.9~12.1 kgf.m

Indoor unit tubing

Flare nut

Pipings

Spanner

Torque wrench

Precautionsinbending

1.If it is necessary to bend or stretch the tubing, use the spring which is attached to the tubing in stead of pipe bender.

Please make a careful notice to make a smooth line.

Hold the tubing with your two hands closely and then bend or stretch it slowly not to make any crack.

Remember that the radius (R) should not exceed 70mm (Refer to Fig. 1)

2.Do not repeat the bending process to prevent the tubing from cracking or crushing.

3.Keep in mind that the bending part should not be cracked and make the radius (R) as long as possible (Refer to Fig. 2)

Spring

R70mm

(Fig. 1)

R

(Fig. 2)

Installation Manual 13

Image 14
Contents No A20025U LG Floor Standing Type Air Conditioner Table of Contents Always ground the product InstallationBe sure not to do Be sure to follow the instruction Use the correctly rated breaker or fuseBe sure the installation area does not deteriorate with age OperationUse two or more people to lift and transport the product Installation or repair of product Drained away properlyKeep level even when installing the product Outdoor unit Selection of the best locationIndoor unit Piping length and the elevation Refrigerant amount Indoor Unit InstallationOutdoor unit Installation Installation guide at the seaside Selecting the locationOutdoor UnitInstallation Method Installation works DescriptionsPreparation of installation parts and tools Installation Parts, Tools UsePreparation of Piping Move the indoor tubing and drain hose to the hole Precautions in bendingConnection of piping Connecting the Cable to Indoor Unit Wiring DetailsBConnect wires to the terminals on the control Connecting pipings to the outdoor unitConnecting the cables to the outdoor unit Wiring Power Supply and WiringPower supply Vacuum Drying of the Connecting Pipes and the Indoor Unit Form the Piping Final Check and Test Run