LG Electronics 3828A20025U manual Table of Contents

Page 3

Floor Standing Type Air Conditioner Installation Manual

TABLE OF CONTENTS

OUT-LINE OF INSTALLATION

Safety Precautions..........................................................................................3

Installation of Indoor, Outdoor Unit ..............................................................6

1) Selection of the best location

6

2)

Indoor Unit Installation

8

3)

Outdoor unit installation

8

4)

Refrigerant amount

8

5)

Installation guide at the seaside

9

6)

Installation method procedure

10

7)

Preparation of installation parts and tools

11

8)

Preparation of piping

12

9)

Connection of piping

13

10)

Precautions in bending

13

11)

Connecting the cable to the indoor unit

14

12)

Connecting the piping to the outdoor unit

15

13)

Connecting the cable to the outdoor unit

15

14)

Power supply and wiring

16

15) Vacuum drying of the connecting pipes and the indoor unit

17

16)

Form the pipe

18

Final Check and Test Run

19

2Floor Standing type Air Conditioner

Image 3
Contents No A20025U LG Floor Standing Type Air Conditioner Table of Contents Use the correctly rated breaker or fuse InstallationBe sure not to do Be sure to follow the instruction Always ground the productOperation Be sure the installation area does not deteriorate with ageInstallation or repair of product Drained away properly Keep level even when installing the productUse two or more people to lift and transport the product Selection of the best location Indoor unitOutdoor unit Piping length and the elevation Indoor Unit Installation Outdoor unit InstallationRefrigerant amount Selecting the locationOutdoor Unit Installation guide at the seasideInstallation works Descriptions Installation MethodInstallation Parts, Tools Use Preparation of installation parts and toolsPreparation of Piping Precautions in bending Connection of pipingMove the indoor tubing and drain hose to the hole Wiring DetailsB Connecting the Cable to Indoor UnitConnecting pipings to the outdoor unit Connecting the cables to the outdoor unitConnect wires to the terminals on the control Power Supply and Wiring Power supplyWiring Vacuum Drying of the Connecting Pipes and the Indoor Unit Form the Piping Final Check and Test Run