State Industries A B C D E F 100 Installation of Vent SYSTEM, Sidewall, KIT Components

Page 22

INSTALLATION OF VENT SYSTEM, SIDEWALL

With the route of the venting system and selection of materials completed,

as discussed in the section of this manual titled PLANNING THE VENT

SYSTEM, the through the wall vent terminal in place and the first section of piping, up to first elbow, installed at the blower it is time to complete the installation of the venting system for the sidewall installation.

FIGURE 22.

Before completing the installation of the venting system be sure to read the sections of this manual discussing the proper method of cutting and cementing PVC pipe and fittings: VENT PIPE PREPARATION.

It is recommended that the completion of the venting system start at the blower assembly and run to the coupling on the inside wall of the vent terminal, Figure 18A.

The vent system piping should be supported every 5 feet (1.5 m) of vertical run and every 3 feet (91 cm) of horizontal run. All piping and fittings must be joined by the proper procedures as described under: VENT PIPE PREPARATION.

INSTALLATION OF VERTICAL VENT SYSTEM

A proper flashing or “BOOT” should be used to seal the pipe where it exits the roof. The total vent system should not exceed the equivalent feet of pipe as listed in Table 1.

Provide support for all pipe protruding through the roof. All piping should be properly secured. The vent system piping should be supported every 5 feet (1.5 m) of vertical run and every 3 feet (91 cm) of horizontal run. All piping and fittings must be joined by the proper procedures as described under: VENT PIPE PREPARATION.

FIGURE 23.

IMPORTANT

The vent system must terminate so that proper clearances are maintained as cited in local codes or the current edition of the National Fuel Gas Code (ANSI Z223.1) or the Natural Gas and Propane Installation Code (CAN/CSA-B149.1) and as listed below:

1.Vent Termination must extend a minimum of 18 inches (46 cm) above roof or 18 inches (46 cm) above the anticipated snow level to prevent blockage of the vent termination, as shown in Figures 20 and 21.

CONCENTRIC VENT INSTALLATION

This appliance is certified for concentric venting with concentric vent kit #9003910105. Follow instructions below for proper installations.

KIT COMPONENTS

Each kit is comprised of the following:

Item

Description

Qty.

Rain Cap

3 in.

1

SDR-26 pipe

4 in. dia.

1

SDR-26 pipe

2½ in. dia.

1

Y Concentric Fitting

3 in.

1

Installation Instructions

194504

1

 

 

 

Field supplied pipe and fittings are required to complete the installation.

22

Image 22
Contents Whenever maintenance adjustment or service is required 197836-000Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety General Safety Table of Contents IntroductionReplacement Parts and Deliming Products GET to Know Your Water Heater GAS ModelsRecovery capacity based on 96% thermal efficiency Installation ConsiderationsRough-In-Dimensions All models Maximum Supply Pressure 14 inches W.C .48kPaDirectly BELOW. Keep Clear of ALL Obstructions Water Piping Mixing Valve Usage Facts to Consider About the Location Appliances in Unconfined Spaces Insulation BlanketsCombustion AIR and Ventilation Appliances in Confined SpacesALL AIR from Inside Buildings See ALL AIR from Outdoors See Figures 7, 8Water Piping Installing the NEW Water HeaterChemical Vapor Corrosion Closed Water SystemsTemperature-Pressure Relief Valve Valve and Pipe Insulation if suppliedHigh Altitude Installations Gas PipingFilling the Water Heater Sediment Traps VentingVent Pipe Termination Canadian Power Vent Power VentVent Hoods MAY be Extremely HOT During Operation Direct Vent Canadian Direct Vent Planning the Vent System Installations Condensate Sequence of INSTALLATIONS, a Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Direct Vent Terminal Installation ImportantVertical Vent Terminal Installation Installation SequenceVent Terminals Supplied with Heater Must be Used Concentric Vent Installation Installation of Vent SYSTEM, SidewallInstallation of Vertical Vent System KIT ComponentsSafety Considerations Installation Procedure 1 Roof TERMINATION, see Figure CProcedure 2 Side Wall TERMINATION, see Figure F Figure FMULTI-CONCENTRIC Vent Terminations Figure gVent Pipe Preparation Step F Step BStep E Step GBlocked Intake Switch Blower Prover SwitchBlocked Exhaust Switch ON/OFF SwitchPower Vent Wiring Schematic Figure What to do if YOU Smell GAS ON/OFF SwitchDo not try to light the burner by hand Do not TRY to Light the Burner by HandTemperature Regulation HI Limit Switch E.C.OUsing the Electronic Controller OverviewAction Operating StatesDisplay Action Changing the Display Units Fault and Warning ConditionsAccess to the Current Fault or Warning DisplayViewing the Fault History Viewing Information About the HeaterStart UP Conditions For Your InformationOperational Conditions Venting System Inspection Periodic MaintenanceBurner Cleaning Burner Operation and InspectionAnode ROD Inspection Temperature-Pressure Relief Valve OperationDraining Service Leakage CheckpointsTroubleshooting Guidelines ProblemsPage Page Limited Warranty