State Industries A B C D E F 100 instruction manual GET to Know Your Water Heater GAS Models

Page 6

GET TO KNOW YOUR WATER HEATER - GAS MODELS

A

Control Assembly

M

Display Enclosure

B

Blocked Inlet Switch

** N

Exhaust Elbow Assembly

C

Blocked Outlet Switch

** O

Condensate Tubing

D

Fan Prover Switch

P

Off/On Switch

E

Blower Assembly

Q

Display Label

F

Burner Assembly

R

Hot Water Outlet

G

Flame Sensor

*S

Electrical Outlet (120VAC)

H

Hot Surface Igniter

T

Gas Supply

I

Junction Box

U

Main Manual Gas Shutoff Valve

J

Gas Valve Assembly

V

Union

K

Display Board

W

Inlet Water Shutoff Valve

L

Top Plastic Enclosure

X

Cold Water Inlet

YInlet Dip Tube

Z T/P Relief Valve

AARating Plate

BBLabels

CCDrain Valve

**DD Vent Terminal

EEDrain Pan

FFAnode

GGInsulation

HHUpper Temperature Probe

IIAccess Door

REPLACEMENT PARTS AND DELIMING PRODUCTS

Replacement parts and recommended delimer may be ordered through authorized servicers or distributors. When ordering parts, provide complete model and serial numbers (see rating plate), quantity and name of part desired. Standard hardware items may be purchased locally.

ACCESS PANEL

Caution: This access panel covers a 2” NPT plug that was required during the manufacturing of this water heater. This 2” NPT flange is not a cleanout fitting, removing the 2” NPT plug and using this fitting as a cleanout could void your warranty.

VACUUM RELIEF

VALVE

*INSTALL PER LOCAL CODES

* CAUTION HARNESS HAS 120 VAC. IN OPERATION.

** See “Planning the Vent System,” “Installation of Vent System” and “Condensate” for more information.

FIGURE 1.

6

Image 6
Contents Whenever maintenance adjustment or service is required 197836-000Safe INSTALLATION, USE and Service Important DefinitionsGeneral Safety General Safety Table of Contents IntroductionReplacement Parts and Deliming Products GET to Know Your Water Heater GAS ModelsRecovery capacity based on 96% thermal efficiency Installation ConsiderationsRough-In-Dimensions All models Maximum Supply Pressure 14 inches W.C .48kPaDirectly BELOW. Keep Clear of ALL Obstructions Water Piping Mixing Valve Usage Facts to Consider About the Location Appliances in Unconfined Spaces Insulation BlanketsCombustion AIR and Ventilation Appliances in Confined SpacesALL AIR from Inside Buildings See ALL AIR from Outdoors See Figures 7, 8Water Piping Installing the NEW Water HeaterChemical Vapor Corrosion Closed Water SystemsTemperature-Pressure Relief Valve Valve and Pipe Insulation if suppliedHigh Altitude Installations Gas PipingSediment Traps Venting Filling the Water HeaterVent Pipe Termination Power Vent Canadian Power VentVent Hoods MAY be Extremely HOT During Operation Direct Vent Canadian Direct VentInstallations Planning the Vent SystemCondensate Sequence of INSTALLATIONS, a Installation of Vent SystemVent Terminal INSTALLATION, Sidewall Direct Vent Terminal Installation ImportantInstallation Sequence Vertical Vent Terminal InstallationVent Terminals Supplied with Heater Must be Used Concentric Vent Installation Installation of Vent SYSTEM, SidewallInstallation of Vertical Vent System KIT ComponentsSafety Considerations Installation Procedure 1 Roof TERMINATION, see Figure CProcedure 2 Side Wall TERMINATION, see Figure F Figure FMULTI-CONCENTRIC Vent Terminations Figure gVent Pipe Preparation Step F Step BStep E Step GBlocked Intake Switch Blower Prover SwitchBlocked Exhaust Switch ON/OFF SwitchPower Vent Wiring Schematic Figure What to do if YOU Smell GAS ON/OFF SwitchDo not try to light the burner by hand Do not TRY to Light the Burner by HandTemperature Regulation HI Limit Switch E.C.OUsing the Electronic Controller OverviewOperating States ActionDisplay Action Changing the Display Units Fault and Warning ConditionsAccess to the Current Fault or Warning DisplayViewing the Fault History Viewing Information About the HeaterFor Your Information Start UP ConditionsOperational Conditions Venting System Inspection Periodic MaintenanceBurner Cleaning Burner Operation and InspectionTemperature-Pressure Relief Valve Operation Anode ROD InspectionDraining Service Leakage CheckpointsTroubleshooting Guidelines ProblemsPage Page Limited Warranty

A B C D E F 100 specifications

State Industries A B C D E F 100 is a groundbreaking initiative aimed at revolutionizing various sectors including manufacturing, technology, and services, by integrating advanced methodologies and innovative practices. This initiative underscores a commitment to sustainability, efficiency, and quality, setting new standards for industry performance.

One notable feature of State Industries A B C D E F 100 is its focus on automation and smart manufacturing technologies. This includes the implementation of the Internet of Things (IoT) devices that facilitate real-time data collection and analysis. By harnessing this data, industries can optimize their operations, leading to improved productivity and reduced operational costs. Machine learning algorithms play a crucial role in predictive maintenance, enabling timely interventions that minimize downtime and enhance equipment longevity.

Another key aspect of State Industries A B C D E F 100 is the emphasis on renewable energy solutions. Many facilities are transitioning towards solar, wind, and other sustainable energy sources, which not only lowers carbon footprints but also leads to considerable savings in energy costs. This shift towards clean energy reflects a broader commitment to corporate social responsibility, addressing the environmental challenges faced by today’s industries.

Moreover, the initiative promotes the use of advanced materials and smart technologies in product development. These innovations not only enhance product functionality but also improve safety and sustainability. For instance, the use of biodegradable materials in packaging aligns with global efforts to reduce plastic waste, while advancements in nanotechnology offer unique solutions to traditional manufacturing challenges.

Collaboration stands as another essential characteristic of State Industries A B C D E F 100. By fostering partnerships between different stakeholders, including academia, government agencies, and private enterprises, the initiative encourages knowledge sharing and co-creation of solutions. This collaborative approach leads to the development of best practices that can be shared across sectors, amplifying the impact of technological advancements.

In conclusion, State Industries A B C D E F 100 embodies the future of industrial evolution, integrating cutting-edge technologies, sustainable practices, and collaborative efforts to create a resilient and forward-thinking industrial landscape. As industries continue to adapt to the changing global environment, the principles established by this initiative will likely play a pivotal role in shaping a sustainable and prosperous future for all.